Loading...
PCCTCO1.pdf Bullis, Ann Bullis, Ann From: Friday, August 01, 2008 1:05 PM Sent: 'Lachlan Foss' To: 'lori.ross@comcast.net'; Steinike, Russell; Harrison, Marie; Smith, Mike; Bowman, Duane; Cc: Haakenson, Gary RE: PCC Request for Temporary Occupancy 7-30-08.pdf - Adobe Acrobat Professional Subject: Mr. Foss, As noted in my e-mail below, the Building Inspector and Fire Marshal visited PCC today for preliminary walk-through for viability of the TCO request. There are many life-safety items that must be completed before a TCO can be considered, including but not limited to: stairway complete to mezzanine, doors and landings installed, safe exit paths of travel to all exits and to the public way, the corridor must be fully complete as shown on the shell-core plans, plumbing and refrigeration fixtures must be installed, restrooms must be complete and functional, accessibility is required within the building and to access the building, all gas appliances must be installed, State electrical final must be obtained, permanent ladders installed to mechanical equipment and roof, Health District approval is required, emergency generator must be installed and operational for emergency systems (exit signage, emergency lighting, etc,). If the shell-core tenant spaces will not be complete per approved plans, this needs to be in your request, with a plan on how this area will be secured from the market. This is not a complete list. Please understand that a TCO is issued for a maximum of 60 days. Once issued, all work must be complete by that time. Please also follow-up with the Engineering and Planning Divisions to see if they have any issues. Please contact me if you have any questions. Sincerely, Ann Bullis, CBO Building Official City of Edmonds 121 5th Ave N Edmonds, WA 98020 425-771-0220 -----Original Message----- From: Bullis, Ann Sent: Thursday, July 31, 2008 12:50 PM To: 'Lachlan Foss' Cc: lori.ross@comcast.net; Steinike, Russell; Harrison, Marie; Smith, Mike; Bowman, Duane; Haakenson, Gary Subject: RE: PCC Request for Temporary Occupancy 7-30-08.pdf - Adobe Acrobat Professional Mr. Foss, We received your request for TCO, but more information will be needed. Russ Steinike, Building Inspector, and Mike Smith, Acting Fire Marshal, will be on site tomorrow at noon to go through the building with the site superintendent to flag issues that will need to be addressed in your request. A resubmittal will be required. Also, we have not yet received the TCO fees, which were required at submittal. Please contact Marie Harrison for fee amount and submit payment. After Russ and Mike have been through the site, we will prepare an e-mail response to you of issues that still need to be addressed in the TCO request. Other divisions are also reviewing the request and may require additional information. It would have been beneficial to both PCC and the City to know a month or more ago that you were planning on requesting TCO at this date. Then we could have been working together to address issues and help insure your requested date was realistic and could be met. Sincerely, Ann Bullis, CBO Building Official City of Edmonds 121 5th Ave N Edmonds, WA 98020 425-771-0220 -----Original Message----- From: Lachlan Foss \[mailto:lach@woodmanconstruction.com\] Sent: Wednesday, July 30, 2008 3:20 PM To: Harrison, Marie; Bullis, Ann; Smith, Mike Cc: lori.ross@comcast.net Subject: PCC Request for Temporary Occupancy 7-30-08.pdf - Adobe Acrobat Professional Ann, Attached is the request for Temporary Occupancy for PCC Market at 9803 Edmonds Way. Please contact me any time with questions or comments, if any. Thank you, Lachlan WOODMAN CONSTRUCTION Lachlan Foss 3 Lake Bellevue Drive, Suite 201 Bellevue WA 98005 425-454-3621 F: 425-454-6918 lachlan@woodmanconstruction.com