Loading...
Plan review comments for Barley & Maize 8-9-18.doc Plan Review Comments Plan Check #: BLD20180940 Date: August 9, 2018 Project Name / Address: Barley & Maize / 525 Main St. Edmonds Contact Person / Email: Venus Forteza / maizeandbarley@gmail.com Reviewer: Les Krestel Division: Wastewater Treatment Plant / Pretreatment The subject application has been reviewed but cannot be completed until the following items have been addressed/completed. Is the prep sink to the left of the 3-comp sink a veg prep or meat prep sink? There is no dishwasher. Is this correct? These fixtures, if applicable, must be connected to the HGI: Wok - if any 3 comp sink Meat prep sink Prewash sink (pre dishwasher) Do not connect these to the HGI: Mop Sink Vegetable prep sink Hand sinks Dishwasher Floor drains Be sure to leave sufficient space above the HGI for removing the lid during GT maintenance. A maintenance log or manifest will be posted on a wall near the HGI and will be filled out at each cleaning or pump out by the vendor or whoever performs this maintenance. Please respond to the questions by email and if I may be of any assistance or if you have any questions please email or call the numbers below. Thank you. Les Krestel City of Edmonds Pretreatment Technician Office: (206) 672 5755 Cell: (206) 595 3117 les.krestel@edmondswa.gov City of Edmonds Wastewater Pretreatment Program 200 2nd Ave S., Edmonds, WA 98020 Office: (425) 672-5755 Mobile: (206) 595-3117