Loading...
Plan review comments for Behar - Helene Behar 4-1-2019.docm City of Edmonds Wastewater Pretreatment Program 200 2nd Ave S., Edmonds, WA <98020 Office: (425) 672-5755 Mobile: (206) 595-3117 Plan Review Comments Plan Check #: </BLD20190338 </w:t></w:r>Date: April 1, 2019 Project Name / Address: <Helene Behar / 22019 Highway 99 Edmonds, WA Contact Person / Email: Steve Carney / stevec@statemech.net Reviewer: Les Krestel Division: </w:t></w:rWastewater Treatment Plant / Pretreatment The subject application has been reviewed but cannot be completed until the following items have been addressed/completed. The plans propose an Oldcastle Precast 1500 Gravity Grease Interceptor (GGI) to be installed for this project. Pretreatment approves this GGI. Please provide a spec sheet for the proposed GGI. The following are installation requirements for the GGI and will be examined on the GGI inspection. 6” PVC lines </entering and exiting the GGI </ Proper venting allowing free air exchange between both chambers</ Brackets supporting all </downlegs in GI. It is very important to secure the downlegs to the vault walls; it may prevent costly repairs in the future. It is recommended to use stainless steel unistrut bar and 6” clamps to secure pipe Specific for traffic </ Graded away from the manholes to prevent runoff from entering the GI </ Man hole covers above each </downleg for inspection and maintenance Thank you. Please call me Monday-Friday for questions and assistance. Les Krestel City of Edmonds Pretreatment Technician 425-672-5755 206-595-3117 cell les.krestel@edmondswa.gov