Plan review comments for Edmonds Waterfont Senior Center 5-3-2019.doc Plan Review Comments Plan Check #: BLD20181658 Date: May 3, 2019 Project Name/ Address: Edmonds Waterfront Senior Center / 220 Railroad Ave, Edmonds Contact Email: danielrjohnson4@gmail.com Reviewer: Les Krestel Division: Wastewater Treatment Plant / Pretreatment The subject application has been reviewed but cannot be completed until the following items have been addressed/completed. Please submit 3 sets of revised drawings to a Development Services Permit Coordinator, if required, or a written response to the review comments to the Development Services Permit Coordinator and the Pretreatment Reviewer. Please complete and return the earlier provided GGI sizing worksheet. You will not need to complete the HGI section of that worksheet. Locate the outside grease interceptor as close as possible to the kitchen fixtures to reduce to reduce maintenance (grease build-up) on the discharge line from the kitchen to the GGI. Provide a detailed cut sheet showing the proposed GGI for this location. Please provide the anchoring system design that will prevent GGI lifting. The GGI should have: 6” PVC lines entering and exiting the GGI Proper venting allowing free air exchange between both chambers Brackets supporting all downlegs in GI. It is very important to secure the downlegs to the vault walls; it may prevent costly repairs in the future. It is recommended to use stainless steel unistrut bar and 6” clamps to secure pipe Specific for traffic Graded away from the manholes to prevent runoff from entering the GI Man hole covers above each downleg for inspection and maintenance The following fixtures must be connected to the GGI: Mop sink 3 comp sink Dishwasher and prewash Prep sink, if used for meat Floor drains in the scullery/food prep area The following fixtures must not be connected to the GGI (unless approved by pretreatment): Hand sink Vegetable prep sink Please have the GGI installer notify me prior to the setting of the GGI. I prefer to be present during the setting of the vessel to eliminate potential problems. The mechanism that fastens the GGI to the concrete anchor will need to be inspected as well. A water test will need to be conducted, before any backfill, to verify the integrity of the tank. The tank is filled with fresh water, no leaks should be visible through the baffle wall or outside the GGI. Please call me Monday-Friday for questions and assistance. Les Krestel City of Edmonds Pretreatment Technician 425-672-5755 206-595-3117 cell City of Edmonds Wastewater Pretreatment Program 200 2nd Ave S., Edmonds, WA 98020 Office: (425) 672-5755 Mobile: (206) 595-3117