Loading...
Plan review comments for Ezells Famous Chicken 9-25-2019.doc Pretreatment Plan Review Plan Check #: BLD20191193 Date: September 25, 2019 Project Name / Address: Ezell’s Famous Chicken / 22019 Highway 99, Edmonds Contact Person / Email: David Lee / david6081@gmail.com Division: Wastewater Treatment Plant / Pretreatment The subject application has been reviewed but cannot be completed until the following items have been addressed/completed. Typically there is a vegetable prep sink and a meat prep sink, I see on the plans that there are 2 vegetable prep sinks. One of the sinks is connected to the grease drain. Please clarify that the prep sink connected to the grease drain is the meat prep sink. If this is the case, be sure to make the necessary changes on the plans to remove confusion and so no misconnections are made by the plumber. All hand sinks (3) are to be drained into the sanitary drain. Currently there are 2 hand sinks drained into the GGI and 1 sink into the sanitary. Please contact me if you have any questions or if I can assist in any way. Thank you for your time. Les Krestel City of Edmonds Pretreatment Technician Office: (206) 672 5755 Cell: (206) 595 3117 les.krestel@edmondswa.gov City of Edmonds Wastewater Pretreatment 200 2nd Ave S., Edmonds, WA 98020 Office: (425) 672-5755 Mobile: (206) 595-3117 Email: les.krestel@edmondswa.gov