Plan review comments for Red Petal Cakes 120228.doc
City of Edmonds Wastewater Pretreatment Program
nd
200 2 Ave S., Edmonds, WA 98020
Office: (425) 672-5755 Mobile: (206) 595-3117
Plan Review Comments
Plan Check #: Date:
BLD20120106 February 28, 2012
Project Name/ Address:
Red Petal Cakes, 321 Main St., Edmonds, WA,
Contact Person/Fax or Email:
Kim Gardner/Kmgard@aol.com
Reviewer: Division:
Jon LeinWastewater Treatment Plant / Pretreatment
The subject application has been reviewed but cannot be completed until the following
items have been addressed/completed. Please submit 3 sets of revised drawings to a
Development Services Permit Coordinator, if required, or a written response to the review
comments to the Development Services Permit Coordinator and the Pretreatment
Reviewer.
1. Your plumbing plans all acceptable for Pretreatment with the exception of one minor clearance
issue. The 35 gpm grease trap (GT) is in a good location. However, looking at the scale in the
plans, it appears that there is only 1 foot clearance between the refrigerator and the corner of the 3-
comp sink. I will require more clearance to access and clean the GT. There must be a clearance
of at least 2 feet to access the GT. It looks like there is room in the plans to move the 3-comp sink
and hand sink for better access to the GT. I am redlining a clearance note on the plans to enable a
Pretreatment sign-off for the plumbing permit today.
2. Do not connect the hand sink and mop sink to the GT.
3. 3-comp sink – follow the County Health Department standards for the connections to the GT.
This year, the Health Department has been requiring an air gap and funnel for all sink connections
on the inlet line to the GT to prevent any chance of a cross connection. Another option, instead of
having the sanitize sink connected to the sink discharge line going to the GT, is running the
discharge line of sanitary sink around the GT to the floor sink (with an air gap) that the GT
discharges to. I prefer this option to keep the Chlorine from the sanitizing sink out of the GT.
4. Please notify me when the plumbing for the fixtures connected to the GT is being roughed in. I
prefer to be present to answer questions to avoid work being redone or corrected.
Please call me Sunday-Wednesday for questions and assistance.
Jon Lein
City of Edmonds Pretreatment Technician
425-672-5755
206-595-3117 cell