Plan review comments for Sub Shop 090527.doc
City of Edmonds Wastewater Pretreatment Program
nd
200 2 Ave S., Edmonds, WA 98020
Office: (425) 672-5755 Mobile: (206) 595-3117
Plan Review Comments
Plan Check #: Date:
BLD20090237 May 27, 2009
Project Name/ Address:
Sub Shop, 650 Edmonds Way, Edmonds, WA,
Contact Person/Fax or Email:
Ted Clark - Subshops@mac.com
Reviewer: Division:
Jon LeinWastewater Treatment Plant / Pretreatment
The subject application has been reviewed but cannot be completed until the
following items have been addressed/completed. Please submit 3 sets of revised
drawings to a Development Services Permit Coordinator, if required, or a written
response to the review comments to the Development Services Permit Coordinator
and the Pretreatment Reviewer.
Hello Ted,
1.Pretreatment can not sign off the plans until the appropriate changes are made:
Floor sink #1 (from the ice machine) should not be connected to the GI.
The dish sink should be connected to the GI. (Please see my previous
comments regarding the sanitize sink.)
Please ensure the dishwasher is not connected to the GI.
The Hand sink should not be connected to the GI.
Item #10 (the comp. prep sink) should not be connected to the GI unless it is
used as a meat prep sink. Please respond to what food prep will be done at
this sink.
A secondary waste line (to the sanitary sewer) on the plans for the fixtures not
connected to the GI should be included in the plans.
2.Please ensure that the sanitize sink discharge meets County Health Department
requirements.
Please call me Monday-Thursday for questions and assistance.
Jon Lein
City of Edmond Pretreatment Technician
425-6725755 206-595-3117 (cell)