Loading...
Plan review comments for Subway 110912.doc City of Edmonds Wastewater Pretreatment Program nd 200 2 Ave S., Edmonds, WA 98020 Office: (425) 672-5755 Mobile: (206) 595-3117 Plan Review Comments Plan Check #: Date: BLD20110742 Sept. 12, 2011 Project Name/ Address: Subway/10016 Edmonds Way #D, Edmonds, WA Contact Person/Fax or Email: Shangguan, Sue/Sue@Woodmanconstruction.com Reviewer: Division: Jon LeinWastewater Treatment Plant / Pretreatment The subject application has been reviewed but cannot be completed until the following items have been addressed/completed. Please submit 3 sets of revised drawings to a Development Services Permit Coordinator, if required, or a written response to the review comments to the Development Services Permit Coordinator and the Pretreatment Reviewer. 1. I see that the plumbing is deferred in your submitted plans. Line drawings for your fixture connections will be required. The comments below are directed for your future plumbing plans after I reviewed your kitchen layout in your submitted plans. 2. An approved outside grease interceptor (GI) is currently on site and its connection is already inside your facility. I believe one of the floor sinks is connected to the grease interceptor. Many grease interceptors have a useable service life of 10-20 years. The should interceptor for your food service had been repaired approximately 3 years ago and be in relatively good condition. Before I can sign off for the plumbing final, I will need to inspect the GI to ensure all of the downlegs are intact and in good condition and observe a 24-hour leak test for the vessel. 3. These fixtures must be connected to your GI: a. #36 – 3-comp sink b. #37 – mop sink These fixtures should not be connected to your GI: a. #31 – hand sink b. #41 - vegetable sink c. #42 hand sink 4. 3-comp sink – follow Health Department standards for isolating the sanitize sink from the GI by either including a funnel/air gap if using the same line as the wash/rinse sink to the GI or preferably using a dedicated plumbing line to a floor sink that connects to the gray water line. Please call me Monday-Thursday for questions and assistance. Jon Lein City of Edmonds Pretreatment Technician 425-672-5755 206-595-3117 cell