Loading...
Plan review comments for Top Pot 6-9-2016.doc City of Edmonds Wastewater Pretreatment Program nd 200 2 Ave S., Edmonds, WA 98020 Office: (425) 672-5755 Mobile: (206) 595-3117 Plan Review Comments Plan Check #: Date: BLD20160608June 8, 2016 Project Name / Address: Top Pot / 150 Sunset AVE S, Edmonds Contact Person / Email: Bradley Williams / brad@williams-mechanical.com Reviewer: Division: Les KrestelWastewater Treatment Plant / Pretreatment The subject application has been reviewed but cannot be completed until the following items have been addressed/completed. 1.The following revised pretreatment plan review is taking into consideration the allowance of a hydromechanical grease interceptor (HGI). However, this brings to light new issues. a.It appears on the submitted equipment list that there is a high temperature dishwasher (Avenger HT-3) in the kitchen. High temp dishwasher wastewater is not permitted to enter any HGI so this item must be removed from the grease drain. b.To prevent over loading, an HGI can only receive total drainage flows from maximum of 4 fixtures. Fixtures that generate fat, oils, and grease are to be directed to the HGI and are listed below;  three compartment sink (follow Health Departments requirements, if any, for isolating the sanitize sink)  both 37” expresso machines c.Corrected kitchen plans showing sanitary drain and grease drain incorporating these changes need to be resubmitted. 2.I have reviewed the proposed HGI. In light of the changes from a gravity grease interceptor to a HGI, will the proposed HGI be placed inside the building or outside? Please respond to the questions by email and if I may be of any assistance or if you have any questions please email or call the numbers below. Thank you. Les Krestel City of Edmonds Pretreatment Technician Office: (206) 672 5755 Cell: (206) 595 3117 les.krestel@edmondswa.gov