Loading...
Planning comment letter.pdf CE ITY OF DMONDS th •1215AN•E,WA98020 VENUE ORTH DMONDS P: 425.771.0220 • F: 425.771.0221 • W:www.edmondswa.gov HONEAXEB DSD:P•E•B EVELOPMENT ERVICES EPARTMENTLANNING NGINEERING UILDING April 14, 2016 Randal J. Munson Email:randy.munson@comcast.net th BLD20160215 RE:Planning Division comments for file (18626 94 Ave. W.) Dear Mr. Munson, I have reviewed the above building permit application for the Planning Division and it was found that the following information, corrections, or clarifications will need to be addressed before the Planning Division review can continue. 1.Height Calculations: The site plan needs a datum elevation point. In addition please review point Bof your height calculations. Based on the topographic lines on the site plan, it appears that point Bshould be one foot higherin elevation(228.75).Please revise the height calculations on the site plan and elevation drawings (building sheet A-2) accordingly. 2.Critical Areas Report: Based on the City’s critical areas mapping, the site contains and is adjacent to a slope that is steep enough to be considered both a Landslide Hazard Area and Erosion Hazard Area as defined withinthe Edmonds Community Development Code (ECDC)Chapters 23.40 and 23.80.I understand that the existing foundation will be utilized in thehouse remodel however the addition on the north side shows new footings in theside of thehill. Since these new footings are proposed within the critical area,the footing construction must be reviewed by a geotechnical engineer. A subsequent report by the geotechnical engineer must address all applicable requirements of ECDC Chapters 23.40 and 23.80and provideany necessary recommendations in order to ensure thatthe standards in these code sectionsare met. Please Note: Additional comments from the Building Division and Engineering Division may require additional changes to the site plan beyond those discussed above. A revised site plan addressing the above cited issues should be completed once you have received comments from the other reviewing divisions. Please submit three copies of the geotechnical report and three copies of a revised site plan (including one reduced copy) and two copies of any revised building plan sheets to a Development Services Permit Coordinator. Our office hours are Mondays, Tuesdays, Thursdays, and Fridays between 8:00am and 4:30pm.and Wednesday from 8:30am to noon. If you have any questions, feel freeto contact me at (425) 771-0220. Sincerely, Development Services Department -Planning Division Sean Conrad Associate Planner