Loading...
Planning Review Comments #1 BLD20170680.pdf�F EDM °�N CITY OF EDMONDS PLAN REVIEW COMMENTS PLANNING DIVISION /1C. I s9° 425.771.0220 DATE: June 6, 2017 TO: Select Homes, Inc. Attn: Kayla Clark Kayla. clarkkoutlook. com FROM: Michele Q. Szafran, Planner michele. szafrankedmondswa. gov RE: Plan Check BLD20170680 8820 218'' St. SW. New Single Family Residence On behalf of the Planning Division, I have reviewed the above building permit application. During review of the subject submittal, it was found that the following information, corrections, or clarifications need to be addressed. Please respond to the following items, so that I can complete my review: Height Calculations: Pursuant to ECDC 21.40.030.A, height is measured from the average level of the undisturbed soil of the site. For properties that have a subdivision, the contours that existed prior to any site work is considered the undisturbed soils of the site. Additionally a datum point shall be used to establish a starting mark to compute grade elevation of the designated four corners for the building height calculations. The datum point must be a permanent point of reference, such as the top of a manhole cover, fire hydrant, or street monument. On the site plan describe the datum point and show its location and elevation. There are inconsistences with the building height calculations between sheet 1 of 4 and sheet Al. Sheet 1 of 4 shows the height of the roof at ridge as 123.47, however, sheet A 1 shows the height of structure proposed at 123.50. Sheet 1 of 4 calls out the top of garage slab at 98.30 and sheet Al call out the finish floor main at 100.80 and finish floor main on the site plan on sheet 1 of 4 calls out 98.80. Please provide a datum point and correct any height inconsistencies on the plans. 2. Final plat submittal: The final plat must be submitted for staff review and will need to be recorded prior to approval for a building permit on lot 2. A building permit had been submitted for lot 1 under BLD20170007 addressed as 8822 218t' St. SW. Prior to building permit issuance for lot 2 please submit for final plat review. Once final plat review has been completed the plat may then be recorded and a building permit may then be issued for lot 2. (See attached Final Plat Review Information Sheet - 4P730 3. Critical Areas Determination: A Critical areas checklist will need to be completed for lot 2 prior to building permit issuance. Please submit the attached checklist following approval and recording of the final plat. If you have any questions, feel free to contact me at 425.771.0220 ext. 1778. Please make all submittals to a Development Services Permit Coordinator, Monday, Tuesday, Thursday, and Friday between 8:00 am 4:30 pm or Wednesday 8:30 am to 12:00 pm. #P73c City of Edmonds Development Information .,1:. 1 r" Final Plat Review (Short and Formal Subdivision) This handout summarizes the procedure for filing for final review of a subdivision in the City of Edmonds. All subdivisions are subject to Edmonds Community Development Code (ECDC) Chapter 20.75. IMPORTANT! All conditions of preliminary approval must be met and civil site improvements must be completed and inspected and/or a site improvement bond must be posted prior to submitting a subdivision for final review. Please refer to bond requirements and procedures handout for additional information on bonding (Handout #E12). Approval of a preliminary plat shall expire and have no further validity at the end of the time limits established under ECDC 20.75.100 and 20.75.107 unless final plat approval has been obtained and the plat has been recorded with the Snohomish County Auditor. APPLICATION MATERIALS CHECKLIST ❑ Final Review Application Form: Complete the final review submittal form (see attached). ❑ Fees: See Fee Sheet ❑ Civil As-Builts: Submit electronic as-builts in .dwg format as well as three (3) hard copies for all site development and utility improvements constructed as part of the subdivision. ❑ Cover Letter: Submit a cover letter stating how each of the conditions of preliminary approval have been met. ❑ Letter of Approval from Utility Purveyor (if applicable): For subdivisions that fall within the Olympic View Water Sewer District and/or for subdivisions that require non-standard utility easements over, under or across the subject subdivision, provide a letter of approval from the applicable utility purveyor accepting the easement language and/or depiction of such as well as any special conditions as set forth by the purveyor. ❑ Title Report: Submit an updated title report or plat certificate that has been prepared within 30 days of submittal for final review. ❑ Lot Closures/Survey Notes: Complete field and computation notes of the plat survey showing the original or re-established corners with descriptions and the actual traverse showing error of closure and method of balancing. A sketch showing all distances, angles and calculations required to determine corners and distances of the plat shall accompany this data. ❑ Final Plat (submit 2 copies): Submit a final plat drawing of the division of land for review and approval by the City. A professional land surveyor registered in the State of Washington must prepare the final plat drawing. The scale used must be sufficient to clearly show all details of the proposal. A scale of 20 feet to one inch is preferred; other engineering scales may be used if necessary. The following information must be provided Revised on 1113116 P73c - Finol Plo/ Page 1 of 4 on the plat documents in order to demonstrate code compliance. Please note, during review of the submitted documents it may be determined that additional information is required. (1) Plat documents shall be prepared for recording in accordance with the Snohomish County Auditor's Office Recording Division, including appropriate margins and any other requirements. All signatures on the plat documents must be original and signed in black ink. Please contact the Snohomish County Auditor's Recording Department for additional information. (2) City's subdivision file number. (3) Date prepared or revised, scale, north point, quarter section, section, township and range number. (4) Total acreage of the land to be divided and area in square feet of each proposed lot. (5) Legal descriptions of the original and new lot(s). (6) Identifying lot numbers or labels (i.e. Lot A, Lot 1). (7) Addresses of the new lot(s) as assigned by the City's Building Division. (8) If setbacks are shown, include the following statement: "Setbacks shown are for reference only and vest no right." If setbacks are modified through a modification request, include language citing the modification request approval. (9) Original and new lot lines including all distances and bearings. (10) Critical areas delineations, buffers, steep topography, or other limitations on the building site. (11) Conditions of approval statement and any additional items required as a condition of preliminary approval. (12) Any existing or proposed restrictions on the use of the land. (13) The location, name and width of all existing and proposed street right-of-ways and/or easements within or adjacent to the proposed subdivision as well as the street and pavement location of existing and proposed streets. (14) Street dedication(s) to the City of Edmonds, if any. (15) Easement Provisions. All existing and proposed easements stating location of easements, ownership and beneficiary information. (16) Easement Maintenance Provisions specifying maintenance responsibilities. (17) Surveyors certificate. Name, address, seal and signature of the land surveyor who prepared the map, including: a. A statement certifying that the plat was prepared by him, or under his supervision; b. A statement certifying that the plat is a true and correct representation of the land surveyed; c. A full and correct description of the land to be divided. (18) Owner certificate. The owner shall certify that the subdivision has been made with his free consent and according to his desires, acknowledged by a notary. Owners of other interests shown on the title report shall certify that they have notice of the subdivision. Note: The owner(s) name(s) should be shown on the final documents exactly as they appear on the title report. Revised on 1113116 P73c - Final Plat Page 2 of 4 (19) Dedication certificate (if applicable). A certificate of dedication by the owner for all areas to be dedicated to the public, acknowledged by a notary. (20) Waiver of Claims (hold harmless agreement). A statement by the owner waiving all claims for damages against any governmental authority which may arise from the construction, drainage and maintenance of required improvements. (21) Waiver of Access (if required by the conditions of the preliminary approval). As applicable, a waiver by the owner of direct access to any street from any property. (22) Roads Not Dedicated (if applicable). A statement or other clear indication by the owner if any street is not to be dedicated to the public. (23) Health Officer (for formal plats only). A statement by the city of Edmonds health officer [Snohomish County Health District] certifying that the proposed means of sewage disposal and water supply are adequate. (24) City signature blocks: a. Director of Public Works i. A statement approving the survey date, the layout of streets, alleys and other rights -of -way, design of bridges, sewage and water system and other structures; ii. A statement recommending approval of the final plat of a formal subdivision to the city council, or approving the final plat of a short subdivision. b. Development Services Director i. A statement that the final plat conforms to the approved preliminary plat and all conditions of the preliminary approval; ii. A statement recommending approval of the final plat of a formal subdivision to the city council or approving the final plat of a short subdivision. (25) City Approval. A statement to be signed by the mayor and city clerk that the city council has approved the final plat of a formal subdivision or a short subdivision with a dedication. (26) Taxes. A statement to be signed by the county treasurer that all taxes and delinquent assessments for which the land to be divided may be liable as of the date of the signing of the statement have been paid. REVIEW PROCESS An application for a final short subdivision is a Type I decision while a final formal plat is a Type IV -A decision pursuant to ECDC 20.01. Dedication of any interest in property contained in an approval of the short subdivision shall be forwarded to the city council for formal acceptance on its consent agent; provided, however, that such acceptance shall not stay any approval, time period for appeal or the effective date of the short subdivision. A notice of decision shall be issued by the Development Services Director in accordance with ECDC 20.06.009. APPEAL PROCESS Final short subdivision decisions may be appealed as a Type II decision to the Hearing Examiner according to ECDC 20.07. Final formal plat decisions are subject to land use petition in Snohomish County superior court pursuant to ECDC 20.07.006. Revised on 1113116 P73c - Final Plat Page 3 of 4 RECORDING The city clerk must file the final plat or short plat for record with the county auditor, and arrange for a reproducible copy to be sent to the public works department and the applicant and a paper copy to be sent to the county assessor and the development services department. The plat or short plat shall not be considered "approved" until it is filed with the county auditor. **It should be noted that applicable taxes must be paid to the County Treasurer's Office before the Auditor will accept a final plat or final short plat. For more information, contact the Snohomish County Treasurer's Office. Note: This information should not be used as a substitute for City codes and regulations. The Edmonds Community Development Code (ECDC) may be viewed at www.edmondswa.gov. The applicant is responsible for ensuring compliance with the fees and regulations that are applicable at the time of submittal. If you have a specific question about a certain aspect of your project, please contact the Planning Division at 121 Fifth Avenue North, (425) 771-0220. Please note that other local, state, and/or federal permits or approvals may be required. Revised on 1113116 P73c - Final Plat Page 4 of 4 FINAL SUBDIVISION PLANS SUBMITTAL FORM Planning Permit #: Project Name: Address: Owner Name: Project Description: CONTACT INFORMATION: Name: Phone # ( ) Company: Address: City: St: Zip Cell Phone # Fax #( ) Email: *************************FOR OFFICIAL USE ONLY************************ 0 NEW SUBMITTAL 0 RESUBMITTAL DATE SUBMITTED: DOCUMENTS RECEIVED: 0 2 copies of Final Plans 0 Title Report (prepared within 30 days of submittal) 0 1 copy of Civil As-Builts (if civil improvements were conducted) Other Documents: Review Assigned To: (Planning and Engineering Divisions) COMMENTS & NOTES: Target Due Date: Revised on 9130111 P73c - Submittal Form for Final Plans Page I of I #P20 Critical Areas File #: ❑ Initial Determination - $100 ❑ Subsequent Determination - $50 Date Received: Date Mailed to Applicant: The purpose of this checklist is to enable City staff to determine whether any critical areas and/or buffers are located on or adjacent to the subject property. Critical areas, such as wetlands, streams and steep slopes, are ecologically sensitive or hazardous areas that are regulated to protect their functions and values. The City's critical area regulations are contained within Edmonds Community Development Code (ECDC) Chapters 23.40 through 23.90. Property Owner's Authorization City of Edmonds Development Services Department Planning Division Phone: 425.771.0220 www.edmondswa.gov "C. 1 t57 A property owner, or an authorized representative, must fill out the checklist, sign and date it, and submit it to the City. Staff will review the checklist, conduct a site visit, and make a determination of whether there are critical areas and/or critical area buffers on or near the site. If a "Critical Area Present" determination is issued, a report addressing the applicable critical area requirements of ECDC Chapters 23.40 through 23.90 may be required depending on the scope of the proposed activity. By my signature, I certify that the information and exhibits herewith submitted are true and correct to the best of my knowledge and grant my permission for the public officials and the staff of the City of Edmonds to enter the subject property for the purposes of inspection attendant to this application. The undersigned owner, and his/her/its heirs, and assigns, in consideration on the processing of the application agrees to release, indemnify, defend and hold the City of Edmonds harmless from any and all damages, including reasonable attorney's fees, arising from any action or infraction based in whole or part upon false, misleading, inaccurate or incomplete information furnished by the applicant, his/her/its agents or employees. SIGNATURE OF OWNER Owner: Name Street Address City State Telephone: Email address: DATE Applicant/Agent: Name Street Address Zip City State Telephone: Email Address: Zip Revised on 114117 P20 - Critical Areas Checklist Page I of 2 CA File No: #P20 Critical Areas Checklist Site Information 1. Site Address/Location: 2. Property Tax Account Number: 3. Approximate Site Size (acres or square feet): 4. Is this site currently developed? ❑ Yes ❑ No If yes, how is the site developed? 5. Describe the general site topography. Check all that apply. ❑ Flat to Rolling: No slope on/ to the site or slopes generally less than 15% (a vertical rise of 10-feet over a horizontal distance of 66-feet). ❑ Moderate: Slopes present on/adjacent to site of more than 15% and less than 40% (a vertical rise of 10-feet over a horizontal distance of 25 to 66-feet). ❑ Steep: Slopes of greater than 40% present on/adjacent to site (a vertical rise of 10-feet over a horizontal distance of less than 25-feet). 6. Have there been landslides on or near the site in the past? ❑ Yes ❑ No If yes, please describe: 7. Site contains areas of year-round standing water? ❑ Yes (approx. depth: ) ❑ No 8. Site contains areas of seasonal standing water? ❑ Yes (approx. depth: ) ❑ No If yes, what season(s) of the year? 9. Site is in the floodway or floodplain of a water course? ❑ Floodway ❑ Floodplain 10. Site contains a creek or an area where water flows across the grounds surface? ❑ Yes ❑ No If yes, are flows year-round or seasonal? ❑ Year-round ❑ Seasonal (time of year: ) 11. Obvious wetland is present on site? ❑ Yes ❑ No 1 1. 3. Zoning: SCS mapped soil type(s): For City Staff Use Only 13. Critical Areas inventory or C.A. map indicates Critical Area on site: 14. Site within designated North Edmonds Earth Subsidence and Landslide Hazard Area (ESHLA)? DETERMINATION CRITICAL AREAS PRESENT Reviewed by: Date: WAIVER Revised on 114117 P20 - Critical Areas Checklist Page 2 of 2