Loading...
Planning Review Comments #1 BLD20170899-0900.pdf�y of E DAI v o CITY OF EDMONDS } PLAN REVIEW COMMENTS PLANNING DIVISION 425.771.0220 DATE: August 29, 2017 TO: Steve Barnes sbarnes@conerstonearch.com FROM: Kernen Lien, Senior Planner kernen.lien@edmondswa.gov RE: Plan Check BLD20170899 AND BLD20170900 8509 — 244t" Street SW New 19-Unit Multi -Family Development On behalf of the Planning Division, I have reviewed the above building permit application. During review of the subject submittal, it was found that the following information, corrections, or clarifications need to be addressed. Please respond to the following items, so that I can complete my review: Datum Point: Please provide a datum point on the site plan. The datum point should be something that has a permanent location such as a manhole cover or water meter. The datum point is used verify the height of the structure during the height inspection. 2. Landscape Cost Estimate: Please provide an itemized cost estimate covering landscaping and irrigation (including labor) which will be used to determine the amount of the maintenance bond for the site landscaping. Easements: In conjunction with the design review of this project, it was noted that an easement would be needed for the storm line to cross over adjacent properties. A notice of intent to provide the storm water easement was submitted during design review. Prior to the approval of the building permit the easement will have to be executed. Please provide a copy of the easement for the storm water utilities on the Sunrise Edmonds Condominium property at 8512 — 242nd Street SW. If you have any questions, feel free to contact me at 425.771.0220 ext. 1223. Please make all submittals to a Development Services Permit Coordinator, Monday, Tuesday, Thursday, and Friday between 8:00 am 4:30 pm or Wednesday 8:30 am to 12:00 pm.