PLN-06-144 Hinkle-Miles plt.doc
Name: HINKLE/MILES File No.: PLN-2006-144
TH
Reviewed by: JAIME HAWKINS Vicinity: 7005/7027 174 ST SW
Engineering Division date
No dedication required per official street map X
Provide all easements as needed. X
All lots shall share a private access road X
Private access easements shall be __15____feet in width X
for 2 lots, 20-ft for 3 lots.
th
No street improvements required on 174 ST SW X
Private access road shall be paved a minimum of 12-ft wide X X
for 2-lots, and 16-ft wide for 3-lots plus 18” asphalt thickened
edge. 6” concrete extruded curb may be used.
Slope of private access road/driveway shall not exceed 14%. X X
Provide on-site turn around to City Standards. X
Insufficient property frontage, no sidewalks are required. X
N/A
N/A
Fire sprinkler system required by FD, Backflow required at X
meter
Provide water service to each lot. X X
Connect to public water system. X X
Provide new sanitary sewer service to each lot X X
Connect to public sewer system X X
C:\\Users\\mcadmin\\AppData\\Local\\Temp\\PLN-06-144 Hinkle-Miles plt.doc_153897\\PLN-06-144 Hinkle-Miles plt.doc
revised: 11/15/05
Provide storm sewer service to all proposed lots. X
Construct storm detention system sized to provide adequate X
capacity for proposed single family dwellings and access
improvements in accordance with ECDC 18.30.
Connect to Public Storm system X
Connect all new impervious surfaces to detention system. X
Required for all new services X X
Submit a grading plan as part of engineered site plan. X
Grading for foundations to be included with the building
permit only.
All signs shall be vinyl letters and to City Stds. No silk screen X
signs will be permitted
Provide Fire and aid address sign X
Provide “ Private Access Ends” X
N/A
Required for all utility construction. X
a) Plat showing lots, easements, legals, survey information X X
b) Legal documents for each lot X
c) Field stake lot corners (by professional surveyor) X
d) Field stake utility stubs at property lines. X
e) Clustered mailbox location per Postmaster X
f) Maintenance agreements X
C:\\Users\\mcadmin\\AppData\\Local\\Temp\\PLN-06-144 Hinkle-Miles plt.doc_153897\\PLN-06-144 Hinkle-Miles plt.doc
revised: 11/15/05
a) Storm System Development charge (access only) N/A
b) Storm System Development charge (sfr) X
$428/lot
c) Sewer LID fees to be paid in full X
d) Sewer Connection fee (new lots only) X
$730/lot
e) Water meter fee (based on ¾”) X
$550/meter
f) Water Connection fee (new lots only) X
$908/lot
$ X
g) Traffic Impact Fee $840.72/lot
$860X
h) Plan Review fee
i) Plat inspection fee (2.2% of improvement costs) N/A
Lyle Chrisman
12-11-2006
ENGINEERING PROGRAM MANAGER, CITY OF EDMONDS DATE
The Engineering requirements have been completed and the subdivision can be recorded.
Authorized for recording by: Date:
C:\\Users\\mcadmin\\AppData\\Local\\Temp\\PLN-06-144 Hinkle-Miles plt.doc_153897\\PLN-06-144 Hinkle-Miles plt.doc
revised: 11/15/05