Loading...
PLN200500056 Staff Report.pdfIhc.18o)0 Date: CITY OF EDMONDS 121 5TH AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 • FAX (425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Letter of Transmittal August 5, 2005 To: Marilyn Irwin 210 5th Ave. S. Suite 102 Edmonds, WA 98020 Subject: S-05-56 Transmitting Findings, Conclusions, and Decision For Your Information: X As you requested: For your file: Comment: Note attachments: X Cc: Rodger Reinig Sincerely, GARY HAAKENSON MAYOR Diane Cunningham, Administrative Assistant • Incorporated August 11, 1890 • CITY OF EDMONDS 121 - 5TH AVENUE NORTH, EDMONDS, WA 98020 PLANNING DIVISION FINDINGS, CONCLUSIONS, AND DECISION To: File S-2005-56 From: Star Campbell, Planner Date: August 5, 2005 File: S-2005-56 Applicant: Marilyn Irwin for Roger Reinig TABLE OF CONTENTS Section Page I. INTRODUCTION...............................................................................................................2 A. Application...............................................................................................................................................2 B. Decision................................................................................................................................................... 2 II. FINDINGS OF FACT AND CONCLUSIONS................................................................... 3 A. Introduction.............................................................................................................................................. 2 B. Compliance with the Subdivision Ordinance........................................................................................... 3 C. Compliance with the Comprehensive Plan...............................................................................................4 D. Compliance with the Zoning Code........................................................................................................... 4 E. Compliance with the Flood Plain Management Provisions...................................................................... 5 F. Environmental Assessment: ..................................................................................................................... 5 G. Critical Areas Review: ............................................................................................................................. 5 H. Comments: ............................................................................................................................................... 5 III. RECONSIDERATIONS AND APPEALS..........................................................................6 A. Request for Reconsideration.................................................................................................................... 6 B. Appeals.................................................................................................................................................... 6 C. Time Limits for Reconsideration and Appeals.........................................................................................6 IV. LAPSE OF APPROVAL.....................................................................................................6 V. NOTICE TO COUNTY ASSESSOR..................................................................................6 VI. APPENDICES..................................................................................................................... 6 VII. PARTIES OF RECORD......................................................................................................7 File No. S-2005-56 Page 2 of 7 I. INTRODUCTION The applicant is proposing to subdivide what is currently one lot at 10230 242°d Pl. SW into two lots. See the Zoning and Vicinity Map (Attachment 1). The site is located in a single-family (RS-8) zone that allows lots with a minimum area of 8,000 square feet. The proposed lot layout is shown on the subdivision map (Attachment 2). The existing lot has a total area of 18,377 square feet. Both of the proposed lots are at least 8,000 square feet in area. A. Application 1. Applicant: Marilyn Irwin for Rodger Reinig 2. Site Location: 10230 242°1 P1. SW (see Attachment 1). 3. Request: To divide a lot with a total area of 18,377 square feet into 2 lots in a Single - Family Residential RS-8 zone (see Attachment 2). 4. Review Process: Following the Comment Period, Planning Staff makes an administrative decision. Major Issues: a. Compliance with Edmonds Community Development Code (ECDC) Section 16.20.030, site development standards for the RS-6 zone. b. Compliance with Edmonds Community Development Code (ECDC) Title 18, public works requirements. c. Compliance with Edmonds Community Development Code (ECDC) Section 23.40, Critical Areas. d. Compliance with Edmonds Community Development Code (ECDC) Section 20.75, subdivision requirements. e. Compliance with Edmonds Community Development Code (ECDC) Section 20.95, staff review requirements. D. Decision on Subdivision Based upon the Findings of Fact and Conclusions, and Attachments submitted with the application and during the comment period, the following is the decision of the City of Edmonds Planning Division: The Subdivision should be APPROVED with the following conditions: 1. Prior to recording the applicant must complete the following requirements: a) Civil plans must be approved prior to recording. In completing the civil plans you must address the following: (1) Complete the Engineering Division conditions listed "Required prior to Recording" on Attachment 3. b) The shed on Lot 2 must be removed prior to obtaining final subdivision approval. c) Submit copies of the recording documents to the City for approval. These documents shall have the following revisions made / information included: (1) Add to the face of the Plat "Conditions of approval must be met and can be found in the final approval for the short subdivision located in File S-2005- 56." (2) Remove all references to setbacks on the plat or correct the setbacks so that they are accurate for each lot and include the following statement: Setbacks are not vested by subdivisions but are determined by current development regulations. (3) Include on the plat all required information, including owner's certification, hold harmless agreement, and staffs approval block. File No. S-2005-56 Page 3 of 7 (Applicants are now responsible for recording their own documents once they have been approved.) 2. After recording the plat, the applicant must complete the following: a) Provide the City Planning Division with two copies of the recorded plat, with the recording number written on them. b) Complete the Engineering Division conditions listed "Required with Building Permit' on Attachment 3. II. FINDINGS OF FACT AND CONCLUSIONS A. Compliance with the Subdivision Ordinance 1. Introduction a. Setting: The subject property at 10230 242°d P1. SW. is in the Single -Family Residential (RS-8) zone (Attachment 1). The surrounding properties are zoned RS-8 and developed with single-family residences. b. Topography and Vegetation: The lot slopes up gradually toward the southeast corner of the lot and flattens off near this corner. There is also a steeper, localized drop near the southwest corner of the lot. Vegetation on the lot consists mostly of typical residential landscaping. Lot Layout: The proposed lot layout is shown on the subdivision map (Attachment 2). 2. Lot and Street Layout The subdivision ordinance contains criteria related to lot and street layout. These criteria require staff to find that the proposed subdivision is consistent with the dimensional requirements of the zoning ordinance including lot area and width or a modification must be approved and that the lots will each contain usable building areas. Based on a review of the project and the analysis in this section staff agrees that a two lot short -plat is a reasonable use of the property. Based on this, lot area for the proposed lots should be as follows: Lot Area: Required Proposed Proposed Lot Area Gross sq. ft Net sq. ft Lot 1 8,000 8,803 same Lot 2 8,000 9,534 *8,000 *The net square footage provided for Lot 2 substracts the area of the panhandle for the lot. This is not technically required to be subtracted from the gross square footage of the lot unless it serves as an access easement for another lot. The existing house on Lot 1 will continue to use its existing driveway and not require the panhandle for access. However, if lot one is redeveloped in the future, the panhandle may be utilized as an easement. In this case, it is appropriate to know that the net area of the lot would meet the 8,000 square feet minimum. Lot Width: The required lot width in the RS-8 zone is 70 feet. The proposed lots meet this requirement. File No. 5-2005-56 Page 4 of 7 3. Setbacks and Lot Coverage: a. In order to approve a subdivision, the proposal must meet all requirements of the zoning ordinance, or a modification must be approved. Based on the development standards for the RS-8 zone, setbacks for the lots should be as follows: Lot 1: Street Setback (25 feet): From the portion of the north property line adjacent to the 242°d Pl. SW ROW Side Setbacks (7.5 feet): From the west and east property lines. Rear Setback (15 feet): From the south property line. Lot 2: Side Setbacks (7.5 feet): From all property lines with the exception of the portion of the north property line that is directly adjacent to the 242"d Pl. SW ROW. b. Existing Structures: The house on the property is proposed to be retained and meets the required setbacks from the Lot 1 property lines. Note that there is an at -grade concrete patio that is allowed to encroach 4' into the 15' rear setback. There is an existing shed on Lot 2. Since accessory structures are not allowed to be located on a lot without a primary structure, such as a residence, this shed will need to be removed prior to the recording of the short plat. C. Corner Lots: Neither lot is considered to be a corner lot. d. Flag or Interior lot determination: Lot 2 is considered to be a flag lot. C. Lot Coverage of Existing Buildings on Proposed Lots: 1.) 35% maximum lot coverage is allowed in the RS-8 zone. 2.) The existing house and garage on lot one cover less than 35% of the lot. Any future buildings or structures on Lot 2 will be allowed to cover no more than 35% of the lot. 4. Improvements a. See Engineering Requirements (Attachment 3). 5. Flood Plain Management This project is not in a FEMA designated Flood Plain. B. Conformance to the Comprehensive Plan 1. Comprehensive Plan Goals and Policies: The Comprehensive Plan has the following stated goals and policies for Residential Development that apply to this project. B. Goal. High quality residential development which is appropriate to the diverse lifestyle of Edmonds residents should be maintained and promoted. The options available to the City to influence the quality of housing for all citizens should be approached realistically in balancing economic and aesthetic consideration, in accordance with the following policies: B. 1. Encourage those building custom homes to design and construct homes with architectural lines which enable them to harmonize with the surroundings, adding to the community identity and desirability. File No. S-2005-56 Page 5 of 7 B.4. Support retention and rehabilitation of older housing within Edmonds whenever it is economically feasible. B.5. Protect residential areas from incompatible land uses through the careful control of other types of development and expansion based upon the following principles: B.5.d. Private property must be protected from adverse environmental impacts of development including noise, drainage, traffic, slides, etc. B.6. Require that new residential development be compatible with the natural constraints of slopes, soils, geology, vegetation and drainage. 2. Compliance with the Residential Development goals and policies: High quality homes that fit into the neighborhood should ultimately be constructed on the property. The overall proposal should not cause any adverse impacts and appears to be consistent with the residential development goals and policies. C. Compliance with the Zoning Code 1. Staff finds this project to comply with the provisions of the Zoning Code, particularly the Subdivision regulations, and the development standards of the zone as detailed in section II.A.2.b. D. Compliance with the Flood Plain Management Provisions 1. The proposed project is not in a Flood Plain. E. Environmental Assessment: 1. Is this site within a shoreline area (within 200 feet of the ordinary high water mark of the Puget Sound)? No. 2. Is an Environmental Checklist Required for this application? If more than 500 cubic yards of grading will be required, an Environmental Checklist is required. At this point in time, the total amount of grading for the subdivision improvements is not anticipated to exceed 500 cubic yards. If through the review of the civil plans, it is determined that more than 500 cubic yards of grading will be required, the City will require an Environmental Checklist to be submitted and issue an Environmental Determination. F. Critical Areas Review: 1. Critical Areas Review Number: CA-2005-16 Results of Critical Areas Review: The review determined that there are no critical areas. G. Comments: As required by the staff review process for short subdivisions, a two -week public comment period that provided notice of the application was held. No comment letters were received. File No. S-2005-56 Page 6 of 7 The following is a summary of the deadlines and procedures for filing reconsiderations and appeals. Any person wishing to file or respond to a recommendation or appeal should contact the Planning Department for further procedural information. A. Request for Reconsideration Section 20.100.010.E allows for City staff to reconsider their decision if a written request is filed within ten (10) working days of the posting of the notice required by this section. The reconsideration request must cite specific references to the findings and/or the criteria contained in the ordinances governing the type of application being reviewed. B. Appeals Section 20.105.040 and 20.105.020 describes how appeals of a staff decision shall be made. The appeal shall be made in writing, and shall include the decision being appealed along with the name of the project and the date of the decision, the name of the individual or group appealing the decision, their interest in the matter, and reasons why the appellant believes the decision to be wrong. The appeal must be filed with the Community Development Director within fourteen (14) calendar days after the date of the decision being appealed. C. Time Limits for Reconsideration and Appeals The time limits for Reconsiderations and Appeals run concurrently. If a request for a reconsideration is filed before the time limit for filing an appeal has expired, the time "clock" for filing an appeal is stopped until a decision on the reconsideration request is completed. Once the staff has issued his/her decision on the reconsideration request, the time clock for filing an appeal continued from the point it was stopped. For example, if a request is filed on day 5 of the appeal period, an individual would have 9 more days in which to file an appeal after the staff issues their decision on the reconsideration request. Section 20.075.100 states, "Approval of a preliminary plat or preliminary short plat shall expire and have no further validity at the end of five years, unless the applicant has acquired final plat or final short plat approval within the five-year period." V. NOTICE TO COUNTY ASSESSOR The property owner may, as a result of the decision rendered by the staff, request a change in the valuation of the property by the Snohomish County Assessor's Office. VI. APPENDICES Attachments: 1. Vicinity / Zoning Map 2. Subdivision Map 3. Engineering Requirements File No. S-2005-56 Page 7 of 7 VII. PARTIES OF RECORD Marilyn Irwin Rodger Reinig 210 5`h Ave. S., Suite 102 10230 242°d Pl. SW Edmonds, WA 98020 Edmonds, WA 98020 Engineering Department Fire Department Parks Department Public Works Department Planning Department Zoning and Vicinity Map PRELIMINARY SHORT SUBDIVISION NO. SE 114, SAT 114 SEC. 36, TWP. 27N, RGE. 3 E. W.M. CITY OF EDMONDS, SNOHOMISH COUNTY, WASHINGTON SCALE 1' - 30' 0 30 60 LEGAL DESCRIPTION .1 A PUT OF FIOEIam AM MISS oAt" NM 2 AS IkDom —AEC a Imm ammS w manoisi caw,, NNSIomm EQUIPMENT & PROCEDURES MID OFSDLIO: SIAISEY Pero o 6r FOD T mmm IEl]I talc nos aEEmNT ETECIRONC mrK satTox INM�ooc Mt of EXT2ID.S Off SWAM W ss2-IJo-0W a � FTa aF recxllaFc FAAIC ILNfS WSW N0. z SHORT PLAT DATA FNOPIT6ED " WD SME FAWY RETOFNO£ MIX sm IAJT7 Sa Fr. TOW. Na OF lots 2 Ears ANY" LOT SM- 9,I66 SF SEN WE DISPOSE: om swKy., swoRr/mIaNES nF6lM./LDIN)IATS SO= A67WP FDILFDS SaT00L Mr.. w IS FIE' O37W.• 0II01E1S FM DEFWTIIOIr UAL Sm T.5' &SAL FN APIEET 25' sS6.L TEAR Td' ONNER/APPLICANT ROM FEND IV= 20W SL SAY. ONO" NL am VERTICAL DATUM NASD W FMW SW N POM ME AT TIE S"MY SW t aL-W SC a<24W FL SI. a&.. 3TS25' NOTES I. T16 Svmtr Iut 64L PIEF = FEW THE EX IASI1E USE OF AIM N•Ec APPEYT FETE011 Mr, AND OM MI' ET m m AM' RNYED DMD PMIES NIINWr WFESS RELYRIEIOITION Br TIE tA1D SLororm 2) 6aN W LEES SNWN AW MUM SET FErNWH DEW IDOIM* 01010 F LM MY MW W aNRWIEE OF ONNOMW 6 O IMM OR IYSED. THIS ST.WEY FE76EF6ED IEFIMIT THE ®ETD a A ITIM IV= MO DOES Nor ROWW W SIM ALL FAS pen RE57RICI01S IESE644IIOIQ AND OCai1TI N NNGI MY ET/Q M TTTTE TV aR ME a W FY70 M.. LEGEND • SET 1/2' x 24' RMAR w/GP SMA ED 1S J75J6� I 0 E=NO REM W/NR AS NOTED 241st PL. S.W. ® FDTMO NIONIRETFT As NOTED ---------- ® PUT NON NOT FdMO Q RNR? OF MY OFIFTETPIEE ® WAM? WM? DAG W47M WMLYF Y FlRE HYDRANT I$ c IlAilsOx I A VICINITY MAP CITY OF D„ • R • • Name: REINIG File No.: S-05-56 Approved by: a / a Vicinity: 10230 242°1 PL SW Engineering Program Manager date Req'd Req'd w/bldg. Bond posted Complete prior to Permit recording 1. Rights -of -way for public streets: N/A- X 2. Easements (City utilities, private access, other utilities): Provide all easements as needed. X 3. Street improvements (ACP with curb and gutter): Access driveway shall be paved a minimum of 12.0' wide plus X 18" asphalt thickened edge. Concrete extruded curb or curb and gutter may also be used. Construct 18" concrete curb and gutter along the property X frontage on 242°d PL SW 4. Street turnaround: Provide an on -site turn around to City Stds. X 5. Sidewalks and/or walkways:. Construct 5' wide asphalt sidewalk along property frontage on X 242°d PL SW. 6. Street lights: N/A X 7. Planting strip: N/A x 8. Water system improvements (pipelines, fire hydrants, etc) OVWSD Provide service to each lot. X Connect to public water system. X Must enter standard developers agreement with OVWSD X 9. Sanitary sewer system improvements (pipelines, pump stations etc)OVWSD Provide new service to each lot X Connect to public sewer system X Must enter standard developers agreement with OVWSD X 10. Storm sewer system improvements (pipelines, DOE, fisheries, etc.): Provide storm sewer service to all proposed lots. X Construct storm detention system sized to provide adequate X capacity for proposed single family dwellings and access improvements in accordance with ECDC 18.30. Connect to Public Storms stem X 11. On -site drainage (plan per Ord. 3013): Connect all new impervious surfaces to detention system. X 12. Underground wiring (per Ord. 1387): Required for all new services X 13. Excavation and grading (per UBC, Chapter 70 : Submit a grading plan as part of engineered site plan. X V:\dvnv\sp\05-56 reinig plt.doc ATTACHMENT 3 Req'd prior to Req'd w/bldg. Bond Complete recordin Permit posted 14. Signage (per City Engineer): All signs shall be vinyl letters and to City Stds. No silk screen X signs will be permitted Install high intensity sign at the entrance X Provide "Private Access road Ends" X Provide fire and aid address Signage X 15. Survey monumentation (per Ord., Section 12.10.120): N/A X 16. As -built drawings (per City Engineer): Required for all utility construction. X X 17. Other requirements: a) Plat showing lots, easements, legals, survey information X X b) Legal documents for each lot X c) Field stake lot corners (by professional engineer) X d) Clustered mailbox location per Postmaster X e Maintenance agreements X 18. Engineering fees: a) Storm drainage connection charge for plat road ( $ ) X b) Storm drainage connection charge per lot ( $ 428 ) X c) Sewer connection fee per SFR ( $ 730) X d) Sewer connection charge/LID fees to be paid in full. X e) Water connection fee per SFR (based on meter size) X d) Plat inspection fee: 2.2% of improvement costs $ X e) Plan review fee: ($ 860.) X f) Traffic mitigation: total for both short plats ($ 840.72) X am ENGINEERING PROGRAM MANAGER, CITY OF EDMONDS DATE The Engineering requirements have been completed and the subdivisioncan be recorded. Authorized for recording by: V:\dvrw\sp\05-56 reinig plt.doc