Loading...
PLN-2007-0013 Murray splt.doc CITY OF EDMONDS ENGINEERING REQUIREMENTS FOR SHORT PLATS Name: MURRAY File No.: PLN 2007- 0013 TH Reviewed by: A. L. Chrisman Vicinity: 1570 9 AVE N Engineering Division date Req’d prior Req’d Bond Complete to recording w/bldg. posted Permit 1. Rights-of-way for public streets: No street dedication is required. X 2. Easements (City utilities, private access, other utilities): Provide a 7’ x 10’ utility easement to the City of Edmonds for X the existing fire hydrant. Provide all easements as required. X th Lots 1 and 2 shall have separate accessess from 9 Ave N X Lot 2: No driveway pavement allowed within preservation area. X 3. Street improvements (ACP with curb and gutter): Construct 18” curb & gutter along entire property frontage 12’ X from the painted centerline . Slope of private access road/driveway shall not exceed 14% X 4. Street turnaround: Provide on-site turn around on private access road to City Stds. X 5. Sidewalks and/or walkways:. Construct 5’ wide sidewalk along property frontage. X 6. Street lights: N/A X 7. Planting strip: N/A X 8. Water system improvements Install a 4” storz adapter on the existing fire hydrant. X Provide new water service to each lot. X Connect to public water system. X X C:\\Users\\mcadmin\\AppData\\Local\\Temp\\PLN-2007-0013 Murray splt.doc_153229\\PLN-2007-0013 Murray splt.doc form revised: 11/15/05 Req’d prior Req’d Bond Complete to recording w/bldg. posted Permit 9. Sanitary sewer system Improvements Provide new sewer service to each lot X Connect to public sewer system X X 10. Storm sewer system improvements Provide new storm sewer service to the proposed lot. X Construct storm detention system sized to provide adequate X capacity for all proposed single family dwellings and access improvements in accordance with ECDC 18.30. Connect to Public Storm system X 11. On-site drainage (plan per Ord. 3013): Connect all new impervious surfaces to detention system. X X 12. Underground wiring (per Ord. 1387): Required for all new services X X 13. Excavation and grading (per IBC, appendix j (2003 edition)) Submit a grading plan as part of engineered site plan. X X Grading for foundations to be included with building permit X only 14. Signage (per City Engineer): Provide fire and aid address signage X 15. Survey monumentation (per Ord., Section 12.10.120): N/A X 16. As-built drawings (per City Engineer): Required for all utility construction. X X 17. Other requirements: a) Plat showing lots, easements, legals, survey information X X b) Legal documents for each lot X c) Field stake lot corners (by professional surveyor) X d) Field stake utility stubs at property lines. X e) Clustered mailbox location per Postmaster X f) Maintenance agreements X C:\\Users\\mcadmin\\AppData\\Local\\Temp\\PLN-2007-0013 Murray splt.doc_153229\\PLN-2007-0013 Murray splt.doc form revised: 11/15/05 Req’d prior Req’d Bond Complete to recording w/bldg. posted Permit 18. Engineering fees: $ X a) Storm development charge (access only) $428/lot X b) Storm drainage connection fee (sfr) c) Sewer connection fee: X d) Water connection fee: X e) Water meter fee – ¾” meter: X $840.72/ new lot $ X f) Traffic mitigation fee $860 X g) Plat review fee ($860 per short plat) $ TBD X h) Short plat inspection fee(2.2% of improvement costs) A.L. Chrisman 20 Mar. 2007 ENGINEERING PROGRAM MANAGER, CITY OF EDMONDS DATE The Engineering requirements have been completed and the subdivision can be recorded. Authorized for recording by: Date: C:\\Users\\mcadmin\\AppData\\Local\\Temp\\PLN-2007-0013 Murray splt.doc_153229\\PLN-2007-0013 Murray splt.doc form revised: 11/15/05