pln20070020-Stonebridge-Engr-Req-07.17.07.pdfCITY OF EDMONDS
ENGINEERING REQUIREMENTS FOR PLATS/PRDS
Name:—STRONEBRIDGE File No.: PRD-07-20/P-07-21 (pIn20070021)
Reviewed by: A.L.Chrisman I J McConnell July 17, 2007 Vicinity: 7723 220tt' ST SW
Engineering Division date
REQ'D
REQ'D
BOND
COMPLETE
PRIOR TO
W/BLDG
POSTED
RECORDING
PERMIT
1. RIGHTS OF WAY FOR PUBLIC STREETS:
The proposed street within the plat shall be classified, paved
X
and dedicated to the City of Edmonds as a public street. The
right-of-way width shall be a minimum of 40.00 feet, and the
cul-de-sac right of way width shall be a minimum of 90.00 feet.
.............. ............
The proposed street signaled as: 78
................. . . . ..... ....................................
X .............. . . --I......-
.. .. .. .. . ............. ... . . ......... .
............... .. . ..........
..... ............................... . .....
... .. . ............ .....................
............. . . ..... .. . . .....................
.... ............. .... ... ...... ...... .. .. ... ....
2. EASEMENTS (CITY UTILITIES, PRIVATE ACCESS,
OTHER UTILITIES).
Provide all public and private easements as required.
X
.................... ". . . . .. .................................... .. .. .. ......... ............... . . . .
Provide a 10.00 foot wide City storm easement between lots 5
------- - - - - - -------
X
------------ 1.1-1 .. .................
............... ....................... . ...
..... . ....... . . ......... ..................
and 6 for an 18" storm line. ... ............................. ....... . ... . . ..................
. ...... .................. ..... . .. . .........
. . . . ............. .............. . ....
..................................... . ...........
............................ _ ........ ..
3. STREET IMPROVEMENTS (ACP WITH CURBIGUTTER):
78TH PL W shall be paved a minimum of 22.0'feet wide and a
X
minimum of 35.0' for the cul-de-sac. ....... ........... . ......
. ..............................................................
......... I ............. ... . . ........
........... ............... .............
............ .... ... ....... ........
I ........ ...... .............. ... .........................
For on street parking one side, add an additional 5.0' of right -of-
X
way and eliminate sidewalk 1 side. Crown of street shall be 12'
from the face of the curb of the non sidewalk side.
No on street parking permitted within the cul-de-sac.
X
--------- .......... .... ... ....... ........................................
concrete curb and gutter throughout the plat.
............'.'.. ................. . . .
X
. . ........ ........... .I .......
...... ..I .. . ...............I ...........
....... . . . ....... .........................
............ . . . . ................. . .
nstruct 18" concrete curb and gutter along 220t plat frontage
... I . ..........
X
....... .................. ... ......
............ . . ..... ...... . ....
...... . ---------------
replace
. ..... ... . . as required and or directed .by the City Engineer,.,............_..
. ......... ....... ... . . ............... . ..........
... . ......... ...... ..... ........
..................... . . . ... .........
....... . . .. .. . ........
Maximum street travel lane cross slope shall be 2%.
X
. .......... I ............. 1 1111.1.11 1 1 ........ .... . ..
gradeStreet shall not exceed 12%.
. ... . ... ..... . ..... . ............... . ....... ....
X
... ....... . ....... ...............
.......... ......... ............. ..... I .
....... ........... . . .....
....................... ....... . ...... ... . ........ . . . . .............
Entrance radius improvements to 78 Wih_aill meet
.. . ....... -'---'-'-----'......'-...' ....
X
.............................. . .. ... ... ... ...
......... ............... ....... ........
. ..... ..... . ......... .....................
... . .......... 2nnetrics and 30
. . ........
.............. . . . . ... . ...................
.......... . ....... . . . ... . .........
Lots 3A, and 5 shall share a driveway entrance.
X
X
.. . ........ . ..................... ..... . ................. .. . ................. . ........................ . . . ......
all share a driveway entrance.
.... ..................... . ...... . . I -- ------------ ---------- --- ........ . ..... I ... . ................. ................ . .............. . ..
... . ......... .
X
.... . . ............. .
X
............ . . .........................
....... . ... .
....... . ... ............. ... ....
...... .................. ...............
4. STREET TURNAROUND:
Construct a cul-de-sac within the plat per City Standards
X
5. SIDEWALKS AND OR WALKWAYS:
Construct five-foot wide concrete sidewalk to City standards
X
along ?2qlh.p.!qp . ..... . ............. ... ............................................... . ........................ .
........... . ................. ........... . .. . . ... .
................ . . .............. . ... . .
........... ..... .............. ........
. ............ ......... .
Construct five-foot wide concrete sidewalk to City standards
X
........... ...... . ..... . . . ... . ................ .
. .............. ...... ....... . . . ..... _'_' ..........
........ ...... I .... .... ... . ......
..... ............... - ..........
..............
Construct concrete curb ramps at the entrance to the plat and
X
as required throughout the plat per City standards. Truncated
domes are required at street intersections.
.... ... ..... .............................. ....................................
.. ... . ..... ..... . . ......... ... ................ .
1* ....... ....... .
.... ..... . ........... ....... --I
..... . . . ........ . . ..................
ATTACHMENT 8
CADocurnents and SettingsNtaylor\Local SettingsWernporary Internet Fi1es10LK4Np1n20070021 StonebFidge prd-plt reqnints.doc form revised: I I /15/05
REQ'D
REQ'D
BOND
COMPLETE
PRIOR TO
W/BLDG
POSTED
RECORDING
PERMIT
6. STREET LIGHTS:
Install street lighting within the plat. Spacing shall be
X
determined by a licensed Professional Engineer experienced in
streetlighting: _.__.._.__._._._..-_...______,__......_._..._.........-....... -._........ _.......................... ._._........._...
Light poles shall be PUD's standard 30' fiberglass. Install
X
underground wiring and wire poles for PUD's 110v/120w Cobra
heads.
7. PLANTING STRIP
N/A
8. WATER SYSTEM IMPROVEMENTS
Install 4" ductile iron pipe water main.
X
... .................... .................... .
Relocate existing fire hydrant on 220'._S...........__._...._................ _...._......_.._._._...._......_......._._._........
....... _._._.. _... X
....... __.........._...._......._.__.......__
.._._..............
........ .-.....-_------ ---._...................._..._._......_..._..................................................._..........._............................................ _._....,._...............
Provide water service to each lot
..... .__... ......_._.........._............._........__.....
X
.._...._............._.........._.....................................................
._._.._._. _._......__....
.-- ys----_--____.___.-._--.-.-•_.._-.__._.-.-._
Connectto publicwat t._.__._._._...._._._...__._._._._._._._._...._._._._._.___._____._______._..___....._...,._........___X ...__...............-...._..._..._.......-_......_________..-____._-______•._•___._.._._._._.................._._.....-.
..-....,_...____
,-•-.-•-•---_.___._,_.__.._._._,
.......
9. SANITARY SEWER SYSTEM IMPROVEMENTS
Install 8" sewer main
X
..... _-.........__...
................._...._._._._.-.-.-.-..............._._.._............_..-..........__..-.-.-._....._-.-...............-............-...._...__............_..._............. -
Provide new service laterals for each lof
- - - ._._.........._
X
.._._._...._........_._...............
..�._.-.�.._._�..........._....... ............
.... ...._...._._._._.
... .... ...... ....... ............
_....._.._._.._._......_...._._._._._.........._
---_-------.___.....---_--_--•-_-_-_--._._......-.._..................................._....-..._.............-...._.............................._._._._....._........._
Connect to public sewer system
._... _.._...._.-
X
__._..__.,__._..__,._............
X
10. STORM SYSTEM IMPROVEMENTS
For storm system design of 5000 sq. ft. or greater of impervious
X
area - a Stormwater Management report and plan is required.
Compliance with ECDC 18.30 and 1992 Department of Ecology
Stormwater Manual is required._ Per, Ord. 3013
Construct privately owned and maintained storm detention
X
system sized to provide adequate capacity for proposed single
family dwellings and private access improvements in
accordance with ECDC 18,30. Storm detention system shall be
................... ._......... .......... --•--...............................__........._._._............_...,.....,__...,.,_......._..._....,._.._..._..,.__......_.._...._...._................................................................................._.._........__.._.....•__................_.
located on private property,
Connect all new impervious surfaces to detention system.
X
X
......................................__........................................._._....._._._._.................•..__......_......._........._...._........._............_.......... ........... ......... ....... __._................_.___-__.�.--.,................_............,...,..........._..........._.._,_
Provide storm sewer service to all proposed lots.
X
........ _....._..
._,__.___.-.._............._......_-•-----------_.
........... ..... _........... _....................
.................. ... ... ... .... _...............
..... ......._._........ ...... ........_.....
..................................._.................................._._............_................ _ ._._......._..............................................__.........._.............---..........................
Connect to Public Storm system
__........ w-..._.,..,............
X
,._',
X
11. UNDERGROUND WIRING PER ORD. 1387
Required for all new services
X
X
12. EXCAVATION AND GRADING (PER IBC APPENDIX J,
2003 EDITION
Submit a grading plan as part of engineered site plan.
X
X
13. SIGNAGE PER CITY ENGINEER
All signs shall be vinyl letters and to City Standards. No silk
X
screened signs will be permitted.
•
Provide high intensity stop sign on 78�' PI W at the intecti rseon
X
of220" St SW
_...._.__._......_...._._._._._._._._.__._._............_._.___......_._._...___.___._
._........._...___._._.__._.__..•__
C:\Documents and SettingAtayloALocal SettingsWemporary Internet Files\0LK4\p]n20070021 Stonebridge prd-plt regmnts.doc form revised: 11/15/05
REQ'D REQ'D BOND COMPLETE
PRIOR TO WIBLDG POSTED
RECORDING PERMIT
Provide "Street Ends" at the beginning of the plat. X
.... ................. .......... ....... _............ .............. ......................... ..... ._...................._-...............................__...............................,..... ........... _..... ..... .............................. .......-......
Provide "No parking anytime" along both sides of plat road. X
_ _..................._......_........._.....-........._........_._._.._.............._....................... ...........................,..,..,..,..,..,..,.......,..,.........................,.... .......,th................,......_..............._._...................._...._.................._..........__._.__............................
............._...____.........,._,._,...,,.....,..,..,...........,..,..,.....,.._._.._..._.......•..........................
Provide Street signs designating the intersection of 220 St SW X
& 78t" PI W
............................._---- _,_._................... .................. ........ -...._._......._......... ............... -..................... _.__..........._............................................. _..._.......... .............. ._._............... ..................... .._...... ........ --... ... ----_... -..... -.................... ._._ .._....... _....... _..... .._
Provide fire and aid address signage as required. X
14. SURVEY MONUMENTATION:
Provide concrete monument and case at the right-of-way X
intersection of proposed plat (781" PL W) and 220tt' St SW and
within the slat as reauired.
15. AS -BUILT DRAWINGS PER CITY ENGINEER
Required for all street and utility improvements. Provide an X X
AutoCAD electronic copv and a hard copv to Citv.
16. OTHER REQUIREMENTS:
a. Plat showing lots, easements, legals, survey information
X
......... -......................_._._._._._._............._.__.._......-......._......_....._......._._._._._._._._._._._..._...._._......._._......_._._._..._._...._................__..._..................
b. Legal documents for each lot
....... ............................ ... .................
X
....... _... .............. _.-........
.............. .---- ------
----- -
-__...... ......... ....... .... .................... .... ._................... _............................. _._._._................................. _._...•--•-... -.............. ................................... .........._._._...._._..._.
c. Field stake lot corners (by Professional Surveyor)
.................... ..............._._._..._._..._._......................
X
_...... ...................
................. ----..... - ... --
...... ......... _... --..... -.............
- ......................................................_..._......__._._...._._...._._...._................._._............._........._............._................................_............._...._.-_.
d. Mainten....ance.......agreements....._._......_._._._._.
._...._._...._................................. ....... ............._._......
X
..... _.................. _............._......... _.._
....... -....---- - ._....._
.......... _.... _........ _.
---........._..•......._...._...................._._........................_.............._._._._............_............._..._.................. ......._._._._._.....•..._............................._..........._._..._._._._._•_
e. Clustered mailbox location per Postmaster
-._._.._._._....................
X
._......_._..................... _..........
..... ......... _._......................
........................ ----------- ----- --
_._._._...._-...._....__._._....__................................................__.._............................................___.--_-._._._...._._._.
f. Lot driveway slopes must be identified on the development
X
....•.
_ ........ _.
..............._....----------
----
plans as. -not exceed 14%:_...._._.__._._._._._._._._..._......_._._._._......_......_.
g. Traffic Impact Analysis required .... .
X
__._._._........... ..._..._........._..._._._._._._._._._._._._._._...._.._._._.__._......_._.....__......_..._._.__.___._..._....._.._.__._._.__.._._._..._._........._..._._._._•...._._
_..... .
h. Place thermoplastic crosswalk and stop bar at entrance to
X
.
..................._..........._._._._._._._
.........................._...
_Pat per City. Standard dgtails._._._._......._..._._____........... _..... _______...._... ..... ... ....................
........... _............. _.... _..._-_-.__..._............
_..... __..............
.............. ................. _... .._....
17. ENGINEERING FEES:
a) Storm System Development charge (street only) $1365.32
X
____........._...._.................._._._._._..._._.......................... _................... ..........................................._._._._._...__.....__..__...._.___.__._._._._._._.-._........._.........
b) Storm System Development charge (sfr) $428/lot
X
c) Sewer LID fees to be paid in full
X
.................................._...._._._................................._....... ---._._.........._._..---_-_-.._.__..__......_........................................._.-.-...-.-.-._..-•--•-•----.._...._._...._.........._._-._....._......_..._......-.............
d) Sewer Connection fee (new lots only) $7301lot
................... .... ._....
X
-........ ... ......... ...... ....... _.
... ......_.-._..__-........ ........ ...... ........._._.
_...._......._..................._.....-..._........................................-......_.........._.__._._•_..__..• _ ... .... •..._...._...__- .......-.-_.
e) Water meter fee (based on W) $550/meter
--.-•--.--................................................................_._.........................................I._..
X
... -•..... ................. I ..................
......... .............. _.... _............................. .
.Water Connection fee new lots onl $908/l......................'.__._..•_.....__......._._•_._._•_._._._._._._._._._._.._._._._._._._.__._._..
_ ._..... _..._y).__._._._______._._............. - of
fl .......... _.. ___..... _. _. _._.._._. _. (...............
.... _.......
X
....................... _._......._._.._....
.... ... _._._._._........................._.....
--�-----______.__..•..$8�._......................•_..___.._._...__._._._.__._._._._.__._.__._._._._._..__._._._._._..._._._..._._._._._._.._..._._._.._._...._._._._......_._._..__...._._._._._._._._._._._._._.__.._._.__...._.
_.._.. _._.9)..�•- f# Trac IFee only)0 7211ot
_. _..._............. Impact ee (__.._•...._.........._............•.....__.......................
...... . -.
X
_......._._......_...... -.......
........... ................ •-- ... •--
-.................. ._._._.__._..._._._....... .
h) Plan
.... .._..-._.........._.......__..._.__................._...................._.............................__.._......._..........._............_..........._.__.......•_...__....
i) Pfw inspection fee (2.2% of improvement costs)$ TBD
--------------._._._.__......_.....
X
.......... ......._........... .... ......
....... .... ........-___._._........_.......
......... _..._......... .......... _........
A. G. CFirisman /_7 McConnelr _ 7/17/07
ENGINEERING PROGRAM MANAGER, CITY OF EDMONDS DATE
The Engineering requirements have been completed and the subdivision: can be recorded.