Loading...
pln20070048 Wichers civil review 3.pdfof ED V CITY OF EDMONDS CIVIL PLAN REVIEW COMMENTS ENGINEERING DIVISION �sr 1g90 (425) 771-0220 City Website: www.ci.edmonds.wa.us DATE: May 7, 2008 TO: Jerry O'Connell, Lovell-Sauerland& Assoc. Inc. Jerryo@Isaengineering.com FROM: Jeanie McConnell, Engineering Program Manager RE: Plan Check #: PLN20070048 Project: Wichers Short Plat Project Address: 21821 92" d Ave W During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit three (3) sets of revised plans/documents with a written response to each of the items below to an Engineering Technician. Our offices are open M-F (closed Wednesdays) from 8am-4:30pm. City of Edmonds handouts and standard details can be referenced on the City website under Development Services Department, Engineering Division. 1st Review — January 30, 2008 2nd Review —April 7, 2008 3rd Review — May 7, 2008 GENERAL 1. Please provide an itemized cost estimate for both on -site and off -site (right-of-way) improvements, including traffic control. • Thank you for providing a cost estimate for the project. Please revise as follows: a. Provide a separate breakdown for on -site and off -site improvements. b. Include the split rail fence c. Provide a separate breakdown for filter fabric fence, filter sock for CB protection, and rock entrance. d. A detention pipe will be installed rather than a tank or vault. Please state the lineal footage & diameter of pipe and associated cost. 2. ok 3. ok Sheet 1— SITE DEVELOPMENT PLAN 1. ok 2. ok PLN20070048 Wichers SP, Civil Review 3. City records indicate 30' of right-of-way from ROW centerline to the east at this location. The Frontage Improvement Section Detail provided on Sheet 3 shows 30', but this sheet only shows 20'. Please provide additional information to the City supporting the right-of-way lines shown on the plans or revise the plans accordingly. • The detail on sheet 3 has been revised to show a total of 40' of right-of-way. City records indicate a total of 50' — 20' on the west side and 30' on the east side. If you have documents and/or information showing right-of-way widths other than this please provide copies to the City. Otherwise, please update the plans accordingly. • My last correspondence with Jeff Treiber, on 4/30/08, indicated he is awaiting response from the title company. 4. ok 5. ok 6. ok 7. ok 8. ok 9. ok 10. ok 11. ok 12. ok 13. ok 14. ok 15. ok 16. ok 17. ok 18. ok Sheet 2 — SWPPP, GRADING AND SEWERIWATER PLAN ok Sheet 3 — NOTES & DETAILS 1. Detail A - Frontage Improvement Section: • Please revise detail A as needed in response to comment #2 (Sheet 1) • Pending determination from Title Company. Please refer to comment #2 (Sheet 1) 2. ok 3. ok STORM WATER ENGINEER COMMENTS ok PLANNING DIVISION COMMENTS ok Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. Page 2 of 2