Loading...
pln20070076 Thuesen 3-Lot SP civil review-2.pdfPLN20070076 Thuesen SP, Civil Review City of Edmonds % 121 5TH AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Civil Plan Review Comments Subdivision Application #: PLN20070076 Date: August 14, 2008 Project Name/Address: Thuesen 3-lot SP / 509 9th Ave N Contact Person/Address, Fax or E-mail: Eric Thuesen / ericthuesen@verizon.net Reviewer: Jeanie McConnell Division: Engineering During review of the civil drawings for the proposed subdivision it was found that the following information, corrections, or clarifications will need to be addressed. Please resubmit 3 copies of the revised civil drawings and associated documents with a written response to each item to an Engineering Technician. Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. Review 1 — April 9, 2008 Review 2 — August 14, 2008 GENERAL Please submit a cost estimate that includes those items bonded for under your original bond, plus any additional items that have been added specific to the development of the 3-lot short plat. Please remember to provide an itemized cost estimate for both on -site and off -site (right-of-way) improvements, including traffic control. o Please provide a cost estimate that includes the water meter & service, new driveway approach to Lot 3, additional retaining wall (the proposed wall with this short plat is significantly longer than the orginal wall) and removal of the shed. Please also refer to comment #6 below with regards to the retaining wall. SHEET 1 of 3 — DEVELOPMENT PLAN 1. ok 2. ok 3. ok 4. ok DATE E-MAILED 8/14/08 PAGE(s) 1 of 2 PLN20070076 Thuesen SP, Civil Review 5. ok 6. The civils approved on August 10, 2007 for the two lot short plat at this site show a retaining wall along the southerly edge of the access road. The wall is still called out on Sheet 2 of this submittal, but has not been shown on this sheet. Please either show the wall as new or existing on this plan sheet and provide top and bottom of wall elevations. It is my understanding that the wall has not yet been constructed. o The City has an application in for vacation of the alley right-of-way adjacent to the south property line of your project. The civils submitted on July 28, 2008 propose a retaining wall in the alley. Until City Council makes a decision on the alley vacation application, the retaining wall cannot be approved as shown. If you do not wish to wait for a Council decision you would need to relocate the retaining wall to private property. o Also, the Encroachment Permit submitted with the original 2-lot subdivision was withdrawn. If you'll recall, the wall was relocated to private property and ultimately, the civil plans were approved showing the wall on private property. A new encroachment permit application will be required for your current proposal to construct the wall within the alley right-of-way. However, the City cannot accept application until City Council has made a decision on the alley street vacation application. DATE E-MAILED 8/14/08 PAGE(s) 2 of 2