Loading...
pln20070076 Thuesen 3-Lot SP civil review-5.pdfPLN20070076 Thuesen SP, Civil Review City of Edmonds % 121 5TH AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Civil Plan Review Comments Subdivision Application #: PLN20070076 Date: August 6, 2009 Project Name/Address: Thuesen 3-lot SP / 509 9th Ave N Contact Person/Address, Fax or E-mail: Eric Thuesen / ericthuesen@verizon.net Reviewer: Jeanie McConnell Division: Engineering Review comments previously sent: April 9, 2008 August 14, 2008 December 12, 2008 July 14, 2009 Revised Plans and cost estimate submitted 7/23/09. Plan review comments are as follows: GENERAL 1. 8/6/09 - Please find attached a follow up letter from the City regarding processing of the 3-lot subdivision. Review and approval of the civils will not be delayed. 7/14/09 comment - Please note, City of Edmonds Public Works Director Noel F. Miller, P.E., sent a letter on April 6, 2009 stating the City would not be able to grant final approval of the three -lot short subdivision or associated civil construction drawings until the adverse possession claim is resolved. In the interim, the City will continue to process the three -lot subdivision application and review of the civils. 2. 8/6/09 — a. Thank you for providing a cost estimate specific to the 3-lot short plat improvements. The bond amount required prior to issuance of the 3-lot short plat civils is $882.10. Inspection fees are due in the amount of $444.07. Please refer to item "c" below for a summary of the 2-lot and 3-lot bond requirements. DATE E-MAILED 7/14/09 PAGE(s) 1 of 2 PLN20070076 Thuesen SP, Civil Review b. Per your request, I have reviewed the original 2-lot cost estimate to determine the appropriate bond amount related to ROW improvements. As discussed, you only need to provide a maintenance bond in the amount of 15 % of the cost estimate for ROW improvements. • I am not able to revise the individual unit prices found within the original estimate, but if the actual quantities for any of the improvements changed then adjustments could be made to accurately account for that. • I have noted that only 3 catch basin filter socks would be required within the ROW. It appears as though the sawcut lineal footage as provided in the cost estimate may also be inaccurate. Please feel free to provide actual lineal footage of cuts required to install improvements. • Based on the numbers provided within the original cost estimate (taking into account a reduction in the number of filter socks from 13 to 3), I have calculated the total estimate for ROW improvements to be $29,630.20. 15 % of that amount would be $4,444.53. Please refer to item "c" below for a summary of the 2-lot and 3-lot bond requirements. At present, City records indicate there is a balance of $45,260.73 in frozen fund account # 0101801223, for the 2-lot short plat. A maintenance bond in the amount of $4,444.53 is needed for the 2-lot short and a performance bond in the amount of $882.10 is needed for the 3-lot short plat. If you'd like, you can provide two separate bonds reflecting these amounts or you can request additional release of funds from the existing frozen fund account as long as the account balance remains at $5326.63. Even if you choose to maintain the existing frozen fund account, a new bond form would need to be completed to update the project names and re-establish a date for completion to be within 12 months of the posting date. 7/14/09 comment - Please provide clarification on the cost estimate submittal as follows: a. The bond amount for the ROW improvements appears to include improvement costs for elements of the project that were completed with the 2-lot short plat. Please revise the ROW cost estimate to only include those items that will be constructed with the 3-lot short plat. b. The following items are to be included in the cost estimate: paving of the access road, utility adjustments, temporary rockery, etc. DATE E-MAILED 7/14/09 PAGE(s) 2 of 2