Loading...
pln20070076 Thuesen SP Req's.pdfCITY OF EDMONDS ENGINEERING REQUIREMENTS FOR SHORT PLATS Name: Thuesen Custom Homes File No.: PLN20070076 Reviewed by: Jeanie McConnell Sept. 28, 2007 Address: 509 9th Ave N Engineering Division Date REQ'D PRIOR TO RECORDING REQ'D w/BLDG PERMIT COMPLETE 1. Right -of Way Dedication for Public Streets X 2. Easements (City utilities, private access, other utilities): moo a) Provide all easements as needed b) Lot 1 shall take access off 9th Ave N c) Provide one common shared access driveway for lots 2 & 3, taking access from 8th Ave N. Access easement shall be 15' in width. X X X 3. Public Street Improvements (ACP, curb, gutter and sidewalks): X 4. Private Access Improvements: a) Private access road serving lots 2 & 3 shall be paved to 12.0' in width, plus 18" asphalt thickened edge or 6" concrete extruded curb may be used. X b) Slope of private access road and driveways shall not exceed 14% and shall be noted as such on the civils. X c) Cross slope of private access road shall not exceed 2% X 5. Street Turnaround: a) Provide on -site turnaround to City Standards. X 6. Street Lights: N/A 7. Planting Strip: N/A 8. Water System Improvements a) Provide new water service to each lot. b) Connect to public water system. X X X 9. Sanitary Sewer System Improvements a) Provide new 6" service lateral to development with 6" cleanout at property line. X b) Provide new 4" side sewer to each lot X c) Connect to public sewer system. X X 10. Storm Sewer System Improvements: pIn20070076 Thuesen SP Req's.xls 1 of 2 REQID PRIOR TO RECORDING REQ'D W/BLDG PERMIT COMPLETE a) Provide a Stormwater Management report and plan. Compliance with ECDC 18.30 and 1992 Department of Ecology Stormwater Manual is required. X X b) Provide storm sewer service to all proposed lots. X c) Connect to public storm system; Shell Creek Diversion Pipeline. X 11. On -site Drainage Ian per Ord. 3013 : a) Connect all new impervious surfaces to public storm system; Shell Creek Diversion Pipeline. X X :Kw 12. Underground Wiring (per Ord. 1387): a) Required for all new services. X X 13. Excavation and Grading (per IBC a) Submit a grading plan as part of engineered site plan. X X b) Submit grading plan for foundations with building permit. X 14. Si na a(per City Engineer): a) Provide fire and aid address signage. X 15. Survey Monumentation(per Ord. Sect. 12.10.120 : N/A 16. As -built Drawin s(per City Engineer): a) Required for all street and utility improvements. Provide an AutoCAD electronic copy and a hard copy to City. X X 17. Other Requirements: a) Plat showing lots, easements, legals, survey information X X b) Legal documents for each lot X c) Field stake lot corners (by professional surveyor) X d) Field stake utility stubs at property lines X e) Clustered mailbox location per Postmaster X f) Maintenance agreements X g) Traffic Impact Analysis X 18. Engineering Fees: a) Storm development charge (access tract) N/A X b) Storm system development charge $428.00 X c) Sewer connection fee $730.00 X d) Water connection fee $908.00 X e) Water meter fee - 3/4" meter $550.00 X f) Traffic mitigation fee $840.72 X g) Short Plat review fee $860.00 X h) Inspection fee (2.2% of improvement costs) TBD X Atrni-"""aeff Engineering Program Manager, CITY OF EDMONDS delde ffdw, a,28, 2007 Date pIn20070076 Thuesen SP Req's.xls 2 of 2