pln20070080 Klemm-620 Glen St-ADB.pdfDate:
To:
From:
Subject:
MEMORANDUM
October 10, 2007
Mike Clugston, Planner
Jeanie McConnell, Engineering Program Manager
PLN20070080 (ADB) — Rick Klemm — 620 Glen Street,
4-Unit Condo
Engineering has reviewed the subject application and provides the following comments for the
applicant.
Please provide a more complete preliminary storm drainage plan. The plan submitted
indicates a storm detention system will be located under the driveway with an outfall towards
Glen Street. Please revise the plan to show the existing City storm system and the point of
connection for the detention outfall to the City's system.
Please also note, storm detention systems sized for over 5000sf of impervious area need to be
designed and stamped by a licensed engineer. You may refer to public handout #E72 Storm
Water Management for more information. Handouts are available on the City website at
www.ci.edmonds.wa.us
Thank you,
Jeanie McConnell
City of Edmonds