Loading...
pln20080006-Lybeck 2.pdfPLN20080006 Lybeck SP, Civil Review City of Edmonds 121 5T" AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Civil Plan Review Comments Subdivision Application #: PLN20080006 Date: January 7, 2009 Project Name/Address: Lybeck / 808 Daley Street 2-lot Short Plat Contact Person/Address, Fax or E-mail: Barry Constant / e-mail: barryc@westernengineers.com Reviewer: Jeanie McConnell Division: Engineering During review of the civil drawings for the proposed subdivision it was found that the following information, corrections, or clarifications will need to be addressed. Please resubmit 3 copies of the revised civil drawings and associated documents with a written response to each item to an Engineering Technician. Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. Review 1 — November 19, 2008 Review 2 — January 7, 2009 GENERAL 1. 1/7/09 — Thank you for submitting a cost estimate. Please revise the estimate to include the following: a. Rock entrance b. Catch basin protection c. Materials and work associated with the installation of the sanitary sewer and water systems. 11/19/08 comment - Please provide an itemized cost estimate for both on -site and off -site (right-of-way) improvements, including traffic control, consistent with the proposed short plat improvements. Please note, the King County cost estimate spreadsheet unit prices were last updated in 2002. Please apply a 28% increase to the unit prices so they are consistent with 2008 costs. o You have an option to place a bond, prior to beginning construction, for all required civil improvements in order to proceed towards recording the subdivision. At a minimum, a bond will be required for all improvements located within the City right-of-way. o The amount of the bond will be based on 120% of the City approved estimate for all improvements. The City will inform you of the appropriate bond amount after review approval of the cost estimate. You may contact Conni Curtis at our office to obtain a copy of the performance bond form. She can be reached by e-mail at curtis@ci.edmonds.wa.us. o Inspection fees for this project will be calculated at 2.2% of the 120% City approved estimate for all improvements. DATE E-MAILED 1/7/09 PAGE(s) 1 of 2 PLN20080006 Lybeck SP, Civil Review 2. 1/7/09 — Thank you for submitting a traffic control and haul route plan. The haul route should not direct trucks to 196th St SW via Puget Drive. Please revise the haul route plan to require trucks to travel 9th Ave to SR-104. 11/19/08 comment - Submit a traffic control and haul route plan for review and approval. 3. ok 4. ok DATE E-MAILED U7/o9 PAGE(s) 2 of 2