Loading...
pln20080006-Lybeck-recording-E1.pdfDate: To: From: Subject: MEMORANDUM January 19, 2012 Jen Machuga, Planner Jeanie McConnell, Engineering Program Manager PLN20080006, Lybeck 2-lot Short Plat 808 Daley Street During review of the final short plat documents it was found that the following information, corrections, or clarifications are needed. Please ask the applicant to revise and resubmit plans addressing each of the comments below. Sheet 1 — Recording Documents Under the declarations of short subdivision, covenants, conditions and restrictions: please revise item number 1 to read "Conditions of approval for the short subdivision ...". 2. Please add a Stormwater Improvements section and include verbiage similar to the following: The stormwater manangement detention system installed on Lot 1, as a condition of short plat approval, was designed to accept stormwater flows from no more than 2250 square feet of on -site impervious surface area. Final Site Development Plan/Asbuilt An asbuilt has been received and minor changes are required. The applicant is currently working on these changes and shall submit to the City when complete. Performance Bond 1. All site improvements required as a condition of short plat approval shall be constructed prior to recording or a performance bond shall be posted for any remaining improvements. The developer has indicated interest in posting a performance bond for the construction of the driveway (the last improvement to be constructed) and the City is currently awaiting submittal of a cost estimate in order to determine the required bond amount. Thank you. City of Edmonds