Loading...
pln20080014-applicant response.pdfWestern Engineers Inc. SURVEYORS • PLANNERS • ENGINEERS February 20, 2015 City of Edmonds 121 5th Avenue North Edmonds, WA 98020 13000 Highway 99 South • Everett, Washington 98204 (425) 356-2700 Subject: Civil Plan Review Comments, P1LN20080014 Dear Ms. McConnell: FAX (425) 356-2708 As you requested, this cover letter addresses your comments to Henson Short Plat. Based on your comment letter dated January 27, 2015, we are addressing your comments in order. General 1. Filled out bond quantity worksheet. 2. Traffic control plan is now included. A haul route plan is not required, as the site grading has been redesigned for a rough balanced between cut and fill. Import and export of soil is not expected other than general import of trenching and driveway subgrade material. 3. Note added to the grading plan. 4. Note added to the grading plan. 5. Approval block has been revised. 6. Created separate OVWSD approval sheet with signature block. 7. Acknowledged. Future SFR on lot 2 is not planned have more than 3,000 feet habitable space at this time. Sheet 1 of 3 — Gradina and TESC Plan and Notes . 1. General notes and construction sequence updated per city website. 2. Sheet index has been added to the grading plan. 3. Utility purveyors now listed in margin 4. Drip line protection fencing shown for trees to be retained near clearing area. 5. Existing sanitary sewer labeled as TBR 6. Notes added to clarify looped portion of driveway removal and new access configuration. 7. Note added to maintain hard surface approach at construction entrance 8. Electrical pole w/street light is located near SE corner of site along with electric vault. Please specify the amount of additional annotation required. 9. Note added to remove 151f of existing wooden fence LAND USE CONSULTANTS • CIVIL ENGINEERS • LAND SURVEYORS • ENGINEERING CORPORATION Sheet 2 of 3 — Site Development Plan 1. Proposed dry utility line location shown. Existing dry utilities to be located by Locate Services prior to start of construction to verify any crossing conflicts. 2. Sewer inverts now on plan with notation of approximate new sewer stub extension crossing on storm system profile. 3. Sewer and drainage separation now shown on profile view. 4. No new asphalt is proposed in the vicinity of the existing power pole at the SE corner of the site. The power pole is located approximately 3 feet from existing asphalt and 4 feet from the proposed back of sidewalk. The symbol east of the power pole represents a streetlight secured to the power pole. 5. Existing centerline and fog lines now shown on plans. 6. Repainting note added to plan 7. Station notes for curb, gutter, and sidewalk added to plan 8. Curb and gutter alignment corrected. 9. Added note to remove non -conforming curb and sidewalk. 10.2-foot wide asphalt restoration now shown as hatch along proposed frontage. 11. 2:1 max fill slope noted north of ramp. 12. Rip -rap symbol and note added 13. I.E. revised on plan view. 14. Title revised, material callout added. 15. Title revised, material callout added. 16. Finished grade profile updated 17. Stub elevation added. 18. End of driveway station included on plan 19. Turn around area clarified 20. Removal of ex. landscaping noted 21. Conceptual designs for a future SFR and driveway on Lot 2 (not depicted on current plans) include a future turnaround area. Currently proposed and yet to be proposed impervious areas will total less than 5,000 sF Added an additional note under the detention pipe detail to specify no more than 3,563 s£ of new driveway, roof and/or patio/walkways to be installed on lot 2. Sheet 3 of 3 -- Notes and Details 1. City detail included 2. Center line and fogline shown. 2' minimum saw -cut noted on plan and road section. 3. Mailbox location now shown on plan view. Approved mailbox detail on detail sheet. 4. Access details: a. Pavement widths clarified. b. Easement width clarified. c. Callouts moved to new asphalt section. d. Slope indicated as 2% 1 : / 2012 / 07882A / Engineering / I" SP Comment Response.doe Planning Division Comments 1. Acknowledged 2. Tree Protection Notes added. If you have any questions about the revised drawings please call me. Sincerely, Western Engineers, Inc. Jesse Jarrell, P.E. Project Manager E: / 2012 / 07882A / Engineering / 0 SP Cormnent Response.doc