pln20080014-Henson SP-Approved Cost Est.pdfSite Improvement Bond Quantity Worksheet S15 Web date: 02/22/2013 L9 King Count FILE COPY y ENGINEERING Department of Permitting & Environmental Review 35030 SE Douglas Street, Suite 210 Snoqualmie, Washington 98065-9266 For alternate formats, call 206-296-6600. 206-296-6600 M Relay 711 Project Name: Henson Short Plat Date: 2/2/2015, Revised 04/20/15 Location: 23912 84th Ave W. Edmonds. WA 98026 Project No.: S-2008-014 Activity No.: Clearing greater than or equal to 5,000 board feet of timber? yes X no If yes, Forest Practice Permit Number: (RCW 76.09) AVVYW4 t� � � l 1 Y 1+� vli V °CJ� Y 17��i1,� � iD► �� i 2 Page 1 of 9 King County Bond Form 2008 Note: All prices include labor, equipment, materials, overhead and profit. Prices are from RS Means data adjusted for the Seattle area or from local sources if not included in the RS Means database. � ,101D lvope.c4 flee s = � 1 aA . 5 � APPROVED AS NOTED IN Unit prices updated: 02/12/02 Version: 11 /26/2008 Report Date: 4/20/2015 Site Improvement Bond Quantity Worksheet S15 Web date: 02/22/2013 Reference # Unit Price Unit Quantity # of Applications Cost EROSION/SEDIMENT CONTROL lNumber Backfill & compaction -embankment JESC-1 $ 5.62 CY Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 $ 67.51 Each Crushed surfacing 1 1/4" minus ESC-3 WSDOT 9-03.9(3) $ 85.45 CY Ditching ESC-4 $ 8.08 CY Excavation -bulk ESC-5 $ 1.50 CY Fence, silt ESC-6 SWDM 5.4.3.1 $ 1.38 LF 340 1 469 Fence, Temporary (NGPE) ESC-7 $ 1.38 LF Hydroseeding ESC-8 SWDM 5.4.2.4 $ 0.59 SY 1 1060 1 625 Jute Mesh IESC-10 ESC-9 SWDM 5.4.2.2 $ 1.45 SY Mulch, by hand, straw, 3" deep SWDM 5.4.2.1 $ 2.01 SY Mulch, by machine, straw, 2" deep ESC-11 SWDM 5.4.2.1 $ 0.53 SY Piping, temporary, CPP, 6" ESC-12 $ 10.70 LF Piping, temporary, CPP, 8" ESC-13 $ 16.10 LF Piping, temporary, CPP, 12" ESC-14 $ 20.70 LF Plastic covering, 6mm thick, sandbagged ESC-15 SWDM 5.4.2.3 $ 2.30 SY 92 1 212 Rip Rap, machine placed; slopes ESC-16 WSDOT 9-13.1(2) $ 39.08 CY Rock Construction Entrance, 50'xl5'x1' ESC-17 SWDM 5.4.4.1 $ 1,464.34 Each 1 1 1464 Rock Construction Entrance, 100'x15'x1' ESC-18 SWDM 5.4.4.1 $ 2,928.68 Each Sediment pond riser assembly ESCA9 SWDM 5.4.5.2 $ 1,949.38 Each Sediment trap, 5' high berm ESC-20 SWDM 5.4.5.1 $ 17.91 LF Sed, trap, 5' high, riprapped spillway berm section ESC-21 SWDM 5.4.5.1 $ 68.54 LF Seeding, by hand Sodding, 1" deep, level ground ESC-22 SWDM 5.4.2.4 $ 0.51 SY ESC-23 SWDM 5.4.2.5 $ 6.03 SY Sodding, 1" deep, sloped ground ESC-24 SWDM 5.4.2.5 $ 7.45 SY TESC Supervisor ESC-25 $ 74.75 HR Water truck, dust control ESC-26 SWDM 5.4.7 $ 97.75 HR WRITE -IN -ITEMS "" (seepage 9) Catch Basin Inserts $75 Each 31 1 225 ESC SUBTOTAL: 30% CONTINGENCY & MOBILIZATION: ESC TOTAL: COLUMN: Page 2 of 9 King County Bond Form 2008 $ 2,995.54 $ 898.66 $ 3,894.20 A Unit prices updated: 02/12/02 Version: 11 /26/2008 Report Date: 4/20/2015 Site Improvement Bond Quantity Worksheet Web date: 12/02/2008 Existing Right -of -Way Future Public Right of Way & Drainage Facilities Private Improvements Quantity Completed (Bond Reduction)* Quant. Unit Price Unil LQuant7j Cost Quant. Cost Quant. Cost Complete Cost GENERAL ITEMS No. Backfill & Compaction- embankment GI-1 $ 5.62 CY Backfill & Compaction- trench GI-2 $ 8.53 CY 25 213.25 1801 1,535.40 Clear/Remove Brush. by hand GI - 3 $ 0.36 SY Clearing/Grubbing/Tree Removal GI-4 $ 8.876.16 Acre Excavation - bulk GI - 5 $ 1.50 CY 100 150.00 100 150.00 Excavation - Trench GI - 6 $ 4.06 CY 25 101.501 1801 730.80 Fencing, cedar, 6' high GI - 7 $ 18.55 LF Fencing, chain link, vinyl coated, 6' high GI - 8 $ 13.44 LF Fencing, chain link, gate, vinyl coated, 2 GI - 9 1 $ 1,271.81 Each Fencing, split rail, Thigh GI - 101 $ 12.12 LF Fill & compact - common barrow GI -11 $ 22.57 CY 11 248.27 1 1 425 9,592.251 Fill & compact - gravel base GI -12 $ 25.48 CY Fill & compact - screened topsoil GI -13 $ 37.85 CY Gabion, 12" deep, stone filled mesh GI - 14 $ 54.31 SY Gabion, 18" deep, stone filled mesh GI -15 $ 74.85 SY Gabion, 36" deep, stone filled mesh GI -16 $ 132.48 SY Grading, fine, by hand GI -1-1 $ 2.02 SY Grading, fine, with grader GI - 0.95 SY 1060 1.007.00 Monuments, 3' long 135.13 Each Sensitive Areas Sign E2tCI$ 2.88 F Each Sodding, V deep, sloped ground 7.46 SY Surveying, line & grade GI - 22 $ 788.26 Day Surveying, lot location/lines GI - 231 $ 1,556.64 Acre Traffic control crew ( 2 flaggers) GI - 24 $ 85.18 HR 81 681.44 Trail, 4" chipped wood GI - 25 $ 7.59 SY Trail, 4" crushed cinder GI - 26 $ 8.33 SY Trail, 4" top course GI - 27 $ 8.19 SY Wall, retaining. concrete GI - 28 $ 44.16 SF Wall, rockery IGI - 29 $ 9.49 SF Page 3 of 9 SUBTOTAL 1,394.46 13.015.45 Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 11/26/08 King County Bond Form 2008 Report Date: 4/20/2015 Site Improvement Bond Quantity Worksheet Web date: 12/02/2008 Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Bond Reduction* Quant. Unit Price Unit Quant. L Cost Quant. Cost Quant. Cost Complete Cost ROADIMPROVEMENT No.I AC Grinding. 4' wide machine < 1000sy RI -1 $ 28.00 SY AC Grinding, 4' wide machine 1000-200( RI - 2 $ 15.00 SY AC Grinding, 4' wide machine > 2000sy RI - 3 $ 7.00 SY AC Removal/Disposal/Repair RI - 4 $ 67.50 SY 25 1.687.501 251 1,687.50 Barricade, type I RI - 5 $ 30.03 LF Barricade, type III ( Permanent) RI - 6 $ 45.05 LF Curb & Gutter, rolled RI - 71 $ 17.00 LF Curb & Gutter, vertical RI - 81 $ 12.50 LF 79 987,50 Curb and Gutter, demolition and disposa RI - 91 $ 18.00 LF 51 90.00 Curb, extruded asphalt RI -10 $ 5.50 LF Curb. extruded concrete RI -11 $ 7.00 LF Sawcut, asphalt, 3" depth RI - 12 $ 1.85 1 LF 85 157.25 Sawcut, concrete, per 1" depth RI - 13 $ 1.69 LF Sealant, asphalt I RI - 14 $ 1.25 LF Shoulder, AC, ( see AC road unit price) RI - 15 $ - SY Shoulder, gravel, 4" thick RI - 16 $ 15.00 SY Sidewalk. 4" thick RI - 17 $ 35.00 1 SY Sidewalk. 4" thick, demolition and dispos RI - 18 $ 29.50 SY Sidewalk, 5" thick RI -19 $ 38.50 SY Sidewalk, 5" thick, demolition and dispos I RI - 20 $ 37.50 SY Sign, handicap I RI -21 $ 85.28 Each Striping, per stall RI - 22 $ 5.82 Each Striping. thermoplastic. ( for crosswalk) JR1 - 23 $ 2.38 SF Striping, 4" reflectorized line JR1 - 241 $ 0.25 LF 85 21.25 Page 4 of 9 ONA,- 111ION 2.943.50 1,687.50 Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 11/26/08 King County Bond Form 2008 Report Date: 4/20/2015 Site Improvement Bond Quantity Worksheet Web date: 12102/2008 Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Bond Reduction* Quant. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Complete Cost ROAD SURFACING (4" Rock = 2.5 base & 1.5" top course) For'93 KCRS (6.5" Rock=. 5" base & 1.5" top course) For KCRS '93, (additional 2.5" base) adds RS - 11 $ 3.60 SY AC Overlay. 1.5" AC RS - 2 $ 11.25 SY AC Overlay. 2" AC RS - 3 $ 15.00 SY AC Road, 2", 4" rock, First 2500 SY RS - 4 $ 21.00 SY 19 399.00 93 1.953.00 AC Road, 2", 4" rock, Qty. over 2600SY RS - 5 $ 19.00 SY AC Road, 3", 4" rock, First 2500 SY RS - 6 $ 23.30 SY AC Road, 3", 4" rock, Qty. over 2500 SY RS - 7 $ 21.00 SY AC Road, 5", First 2500 SY RS - 8 $ 27.60 SY AC Road, 5", MY. Over 2500 SY RS - 9 $ 25.00 SY AC Road, 6", First 2500 SY RS - 1( $ 33.10 SY AC Road. 6". Qtv. Over 2500 SY RS - 1'I $ 30.00 SY Asphalt Treated Base, 4" thick RS - 1: $ 20.00 SY Gravel Road, 4" rock, First 2500 SY RS -1: $ 15.00 SY Gravel Road, 4" rock, Qty. over 2500 SY RS -1A: $ 8.50 SY PCC Road, 5", no base, over 2500 SY RS - 1 E $ 27.01SY PCC Road, 6", no base, over 2500 SY RS -1 E $ 25.50 1 SY Thickened Edge IRS -1 $ 8.60 1 LF Page 5 of 9 SUBTOTAL 399.00 1,953.00 Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 11/26/08 King County Bond Form 2008 Report Date: 4/20/2015 Site Improvement Bond Quantity Worksheet Web date: 12102/2008 Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Bond Reduction* quant. Unit Price I Unit Quant. Cost Quant. I Cost Quant. Cost Complete Cost DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe. Access Road, RID D -1 S 21.00 SY Bollards - fixed D - 2 $ 240.74 Each Bollards - removable D - 3 $ 452.34 Each " (CBs include frame and lid) CB Type I D - 4 $ 1,257.64 Each 21 2.515.28 21 2,515.28 CB Tvpe IL D - 5 $ 1,433.59 Each CB Type 11.48" diameter D - 6 $ 2,033.57 Each for additional depth over 4' D - 7 $ 436.52 FT CB Tvpe II, 54" diameter D - 8 $ 2.192.54 Each for additional depth over 4' D - 9 $ 486.53 FT CB Type II, 60" diameter D -10 $ 2,351.52 Each for additional depth over 4' D -11 $ 536.54 1 FT CB Type II, 72" diameter D - 12 $ 3.212.64 Each for additional depth over 4' D - 13 $ 692.21 FT Through -curb Inlet Framework (Add) D - 14 $ 366.09 Each Cleanout, PVC. 4" D -15 $ 130.55 Each Cleanout, PVC, 6" D -16 $ 174.90 Each Cleanout, PVC, 8" D - 17 $ 224.19 Each Culvert, PVC, 4" D -18 $ 8.64 LF Culvert, PVC, 6" D -19 $ 12.60 LF Culvert. PVC. 8" D - 20 $ 13.33 LF Culvert, PVC, 12" D - 21 $ 21.77 LF Culvert, CMP, 8" D - 22 $ 17.25 LF Culvert, CMP, 12" D - 23 $ 26.45 LF Culvert, CMP. 15" D - 24 $ 32.73 LF Culvert, CMP, 18" D - 25 $ 37.74 LF Culvert, CMP, 24" D - 26 $ 53.33 LF Culvert, CMP, 30" D - 27 $ 71.45 LF Culvert. CMP. 36" D - 28 $ 112.11 LF Culvert. CMP, 48" D - 29 $ 140.83 LF Culvert, CMP, 60" D - 30 $ 235.45 LF Culvert, CMP, 72" JD - 31 $ 302.58 LF Page 6 of 9 SUBTOTAL 2.515.28 2.515.28 Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 11/26/08 King County Bond Form 2008 Report Date: 4/20/2015 Site Improvement Bond Quantity Worksheet Web date: 12/02/2008 DRAINAGE CONTINUED Existing Right-of-way Future Public Right of Way & Drainage Facilities Private improvements Bond Reduction` Quant. No. Unit Price Unit Quant. Quant. Cost Quant. Cost Complete Cost Culvert, Concrete, 8" D - 32 $ 21.02 LF Culvert, Concrete, 12" D - 33 $ 30.05 LF Culvert, Concrete, 15" D - 34 $ 37.34 LF Culvert, Concrete, 18" D - 35 $ 44.51 LF Culvert, Concrete, 24" D - 36 $ 61.07 LF Culvert, Concrete, 30" D - 37 $ 104.18 LF Culvert, Concrete, 36" D - 38 $ 137.63 LF Culvert, Concrete, 42" D - 39 $ 158.42 LF Culvert, Concrete, 48" D - 40 $ 175.94 LF Culvert, CPP, 6" D - 41 $ 10.70 LF 15 160.5 Culvert, CPP, 8" D - 42 j $ 16.10 LF 16 7 112.7 Culvert, CPP, 12" D - 43 $ 20.70 LF 104 .257.61 2152.81 Culvert, CPP. 15" D - 44 $ 23.00 LF 100 2300 Culvert, CPP, 18" D - 45 $ 27.60 LF Culvert, CPP, 24" D - 46 $ 36.80 LF Culvert, CPP, 30" D - 47 $ 48.30 LF Culvert, CPP, 36" D - 481 $ 55.20 1 LF Ditching D - 49 $ 8.08 Cy Flow Dispersal Trench (1,436 base+) D - 50 $ 25.99 LF French Drain (3' depth) D - 51 $ 22.60 LF Geotextile, laid in trench, polypropylene D - 52 $ 2.40 SY Infiltration pond testing D - 53 $ 74.75 HR Mid -tank Access Riser, 48" dia, 6' deep D - 54 $ 1,605.40 Each Pond Overflow Spillway D - 55 $ 14.01 SY Restrictor/Oil Separator, 12" D - 56 $ 1,045.19 Each Restrictor/Oil Separator, 15" D - 57 $ 1,095.56 Each Restrictor/Oil Separator, 18" D - 58 $ 1.146.16 Each Riprap, placed D - 59 $ 39.08 CY 1 0.51 19.54 Tank End Reducer (36" diameter) D - 60 $ 1,000.50 Each Trash Rack, 12" D - 61 $ 211.97 Each Trash Rack, 15" D - 62 $ 237.27 Each Trash Rack, 18" D - 63 $ 268.89 Each Trash Rack, 21" 1 D - 64 $ 306.84 Each Page 7 of 9 SUBTOTAL 2429.94 2573.2 Unit prices updated: 02/12/02 "KCC 27A authorizes only one bond reduction. Version: 11/26/08 King County Bond Form 2008 Report Date: 412012015 Site Improvement Bond Quantity Worksheet Existing Right-of-way Unit Price Unit Quant. Price Future Public Right of Way & Drainage Facilities Quant. Cost Private Improvements Quant. Cost Web date: 12/0212008 Bond Reduction* Quant. I PARKING LOT SURFACING No. 2" AC, 2" top course rock & 4" borrow PL - 1 $ 21.00 SY 2" AC, 1.5" top course & 2.5" base cour PL - 2 $ 28.00 SY 4" select borrow PL - 3 $ 4.55 SY 1.5" top course rock & 2.5" base course PL - 4 $ 11.41 SY IU I ILI I Y t'ULt, & b I Ktt I LIUH I INU Utility pole relocation costs must be accompanied by Franchiso Utility's Cost Statemont Utility Pole(s) Relocation UP-1 Lump Sum Street Light Poles w/Luminaires UP-2 Each WRITE -IN -ITEMS (Such as detention/water quality vaults.) No. 5' Asphalt Walkway WI - 1 $ 20.00 SY 411 8201 New Rural and relocate Ex, Mailbox WI - 2 $100 Each 21 2001 WI-3 CY WI - 41 1 LF W1 -51 1 FT WI-6 WI-7 WI-8 WI-9 WI-10 SUBTOTAL SUBTOTAL (SUM ALL PAGES): 30% CONTINGENCY & MOBILIZATION: GRANDTOTAL: COLUMN Page 8 of 9 1.020.00 10.702.18 3.210.65 13,912.83 B C 21,744.43 6.523.33 28.267.76 D E Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 11/26/08 King County Bond Form 2008 Report Date: 4/20/2015 Site Improvement Bond Quantity Worksheet Web date: 12/02/2008 Original bond computations prepared by: Name: Jesse Jarrell Date: 212/2015, Revised 04/20/15 PE Registration Number: 45844 Tel. #: 425-356-2700 Firm Name: Western Engineers & Surveyors, Inc. Address: 13000 Highway 99 S, Everett, WA 98204 Project No: S-2008-014 ROAD IMPROVEMENTS & DRAINAGE FACILITIES FINANCIAL GUARANTEE REQUIREMENTS PERFORMANCE BOND* PUBLIC ROAD & DRAINAGE AMOUNT BOND* AMOUNT MAINTENANCE/DEFECT BOND* Stabilization/Erosion Sediment Control (ESC) Existing Right -of -Way Improvements Future Public Right of Way & Drainage Facilities Private Improvements Calculated Quantity Completed Total Right -of Way and/or Site Restoration Bond*/** (First $7,500 of bond* shall be cash.) Performance Bond* Amount (A+B+C+D) = TOTAL Reduced Performance Bond* Total *** Maintenance/Defect Bond* Total NAME OF PERSON PREPARING BOND* REDUCTION: (A) $ 3,894.2 (B) $ 13,912.8 (C) (D) $ $ 28,267.8 (A+B) $ 17,807.0 (T) $ 46,074.8 Minimum bon amount is 200 . REQUIRED AT RECORDING OR TEMPORARY OCCUPANCY *** (E) $ - T x 0.30 $ �I3,�22.4 OR (T-E) $ 46 Use larger of Tx30% or Date: (B+C) x 0.25 = * NOTE: The word "bond" as used in this document means a financial guarantee acceptable to King County. ** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required. The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included. Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity. *** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes. REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY DDES Page 9 of 9 Unit prices updated: 02/12/02 Check out the DDES Web site at www.kingcounty.goy/permits Version: 11/26/08 King County Bond Form 2008 Report Date: 4/20/2015