PLN20090041 - Comments on Draft Recording Documents.pdfCITY OF EDMONDS • 121 5" AVENUE NORTH • EDMONDS, WA 98020
PHONE: 425.771.0220 • FAX: 425.771.0221 • WEB: www.edmondswa.gov
DEVELOPMENT SERVICES DEPARTMENT: PLANNING • ENGINEERING • BUILDING
DATE: July 3, 2013
TO: Rick Bynum
rick@mastonproperties.com
FROM: Mike Clugston, Associate Planner — Development Services Department
Jeanie McConnell, Engineering Program Manager — Public Works Department
RE: COMMENTS ON 1ST DRAFT RECORDING DOCUMENTS
FOR REDWOOD SHORT PLAT, FILE NO. PLN20090041
Dear Rick:
The Engineering and Planning Divisions have reviewed the final short plat documents submitted
on June 6 and it was found that the following information, corrections, or clarifications will need
to be addressed before review of the final short plat can continue:
1. Note that the City cannot sign off on the final recording documents until the civil plans
have been issued and either a bond is posted for the required subdivision improvements or
the improvements are completed and the final inspection is conducted approving the civil
improvements. The following needs to occur prior to civil plan issuance:
a. Please make the following revisions to the cost estimate. Once the estimate is
approved the bond amount and inspection fees can be determined.
i. Distinguish between ROW and private improvements on the worksheet.
ii. Curb and gutter shall be shown as vertical not extruded.
iii. Sidewalk thickness shall be 5 1/z" thick and through driveway approach
shall be 6" thick.
iv. Please verify quantities for asphalt sawcut and sidewalk.
v. Include paving of private driveway.
vi. Verify basin types and quantities as well as pipe type and quantities. What
has been shown on the worksheet is not consistent with the approved
plans.
vii. Include pipe to be installed in the right-of-way.
viii. Include water system improvements, sewer system improvements,
mailboxes and detention control tee.
b. Inspection fees will need to be paid.
c. A ROW construction permit application shall be submitted and permit fees paid.
d. A performance bond will need to be posted.
2. Please add a note to the face to the short plat map showing the addresses which have been
assigned to each of the new lots: Lot 1 — 7631 201st Street SW, Lot 2 — 7629 201st Street
SW.
Page 1 of 2
3. Under the "Approvals" heading on Sheet 1, please revise the following:
a. Replace the statement "City of Edmonds Planning Division" with the following
statement: "The subject final plat conforms to the approved preliminary plat and all
conditions of the preliminary approval and is approved and authorized for recording by
the City of Edmonds Planning Division by:"
b. Replace the statement "City of Edmonds Engineering Division" with the following
statement: "The survey date, layout of streets, alleys and other rights -of -way, design of
bridges, sewage and water system and other structures are approved, and the subject
final plat is authorized for recording by the City of Edmonds Engineering Division by:"
4. Please add a "Stormwater Detention Provisions" section that states: "A stormwater
detention facility is to be constructed on Lot 2 for the benefit of Lots 1 and 2, as approved
by the City of Edmonds. The approved plans are on file with the City of Edmonds under
file number PLN20090041. Consistent with this approval, Lot 1 has been allotted 1810sf
of new impervious surface area for future site improvements and Lot 2 has been allotted
4750sf of new impervious surface area for the house, patio, walkway and driveway."
5. Please clarify the third paragraph under Restrictions. The City requires all new utilities
shall be placed underground. It is unclear the intent of this paragraph.
Please make the above changes and submit your updated recording documents, Monday through
Friday, between 8:00 AM and 4:30 PM (8:00 AM to 12:00 PM only on Wednesdays). If you
have any questions, please let us know by phone at 425-771-0220 or by e-mail at
michael.clu sg tongedmondswa.gov or Jeanie.mcconnellgedmondswa.gov.
Page 2 of 2