pln20120011-Mione-LLA-Engineering_approval.pdf
MEMORANDUM
August 12, 2012
Date:
Mike Clugston, Planner
To:
Jeanie McConnell, Engineering Program Manager
From:
Subject:
PLN20120011,Mione Lot Line Adjustment
19011 Olympic View Drive
The original application submittal included a shift inthe southerly line of Lot 2 (also the
th
northern edge of 190Pl SW platted right-of-way)to a location that would align more
th
accurately with the built 190Pl SW street.This request could not be processed as submitted
th
as it wouldrequire a street vacation on the north side of 190Pl SW as well as a street
th
dedication on the south side of 190Pl SW.
After much communication between City staff, the applicants’and their representatives,a
revised lot line adjustment plat map was submitted showing no change to the southerly line of
Lot 2.No adjustments to the platted right-of-way are being requested.
Engineering has reviewed and approves thesubmittal received on July 25, 2012.
Thank you.
City of Edmonds