Loading...
PLN20120021-Ritter SP-Deferral of Improvements email.pdf From:McConnell, Jeanie To:Matt Bolin (mbolin@usacmtg.com);Joseph Smeby <joe@omega-eng.com> (joe@omega-eng.com) Cc:Machuga, Jen Subject:PLN20120021 - Ritter Short Plat - Deferral of Improvements Date:Thursday, March 16, 2017 12:55:47 PM Good morning, This email is being sent in follow-up to your request to defer construction of the access for Lots A & B to the time of building permit issuance. The following Edmonds Community Development Code (ECDC) sections apply to your request - ECDC 20.75.120.A Review of Improvement Plans – Timing ECDC 20.75.130.D Installation of Improvements – Short Subdivision – Deferred Installation ECDC 20.75.120.A states “Timing. If improvements are required as a condition of preliminary approval of a subdivision, the applicant shall submit the improvement plan to the director of public works for review and approval, allowing sufficient time for proper review before expiration of the preliminary plat approval.” ECDC 20.75.130.D states “Short Subdivision – Deferred Installation. If the community development director determines that installation of improvements will not be needed at the time of the approval of the final plat of the short subdivision, the improvements shall be installed or guaranteed by bond before issuance of any development permit for any lot shown on the preliminary plat. This condition shall be stated on the final plat, and shall be binding on all later owners of lots created by the subdivision.” After further review of your request, it has been determined that if deferral is to be allowed for the subject project then deferral of all improvements would make the most sense, versus just deferral of the access. Deferral of only the access is problematic in that the installation of the detention system requires significant cuts to the existing steep slope and exposes the site to an increased risk for erosion hazards. Should you decide to move forward with deferring the improvements the following will be required: 1)A letter to the City clearly explaining why you are requesting to defer installation of all the improvements for the subject property. 2)A complete set of civil construction plans, including all elements that need to be constructed as conditions of short plat approval. This would include design of the retaining wall as construction of the access road could not occur without a retaining wall. 3)Acknowledgement/Agreement by the applicant that a condition will be placed on the face of the short plat recording documents stating that all required improvements shall be installed as a condition of building permit approval for Lot A. A performance bond will need to be posted for all required improvements prior to the issuance of said building permit. A building permit for Lot B shall not be issued until all required improvements have been constructed. 4)A similar statement shall also be recorded as a separate document against each of the properties – Lot A and Lot B. Please let me know if you have any questions. Regards, Jeanie *¤ ­¨¤ -¢#®­­¤«« - %­¦¨­¤¤±¨­¦ 0±®¦± ¬ - ­ ¦¤± jeanie.mcconnell@edmondswa.gov ΓΑΔȃΖΖΐȃΏΑΑΏǾ ¤·³ ΐΒΒΗ 7¤¡ - ¯Ȁ ¶¶¶ȁ¬ ¯²ȁ¤£¬®­£²¶ ȁ¦®µ 0¤±¬¨³ #¤­³¤± (®´±²Ȁ -Ǿ 4Ǿ 4§Ǿ & ȟ ΗȀΏΏ ¬ ȟ ΓȀΒΏ¯¬ 7¤£­¤²£ ¸² ȟ8:30-noon