Loading...
pln20120046-Niebruegge Cost Est.pdfSite Improvement Bond Quantity Worksheet S15 Web date: 02/22l2013 LQ King County 4.1ki �hl Ulf- �j Department of Permitting & Environmental Review .�kcc, 35030 SE Douglas Street, Suite 210 Pp14� 4: Snoqualmie, Washington 98065-9266 For alternate formats, call 206-296-6600;- 206-296-6600 TTY Relay 711 Project Name: Location: Niebrue.we Short Plat 22301 95th Place West Clearing greater than or equal to 5,000 board feet of timber? yes no If yes, Forest Practice Permit Number: (RCW 76.09) '(C,5C, = '0 �, o-Z2 Page 1 of 9 ftka 1 Bond Quantity Worksheet 3 Date: Project No.: Activity No.: 10/18/2013 PLN20120046 Note: All prices include labor, equipment, materials, overhead and profit. Prices are from RS Means data adjusted for the Seattle area or from local sources if not included in the RS Means database. Unit prices updated: 02/12/02 Version: 11 /26/2008 Report Date: 10/18/2013 v � � � 1 � / �, S15 Web date: 02/22/2013 So-".e [,mprovement Bond Qtuafft Vorksheet - - Reference # Ur,i P-ice I Jr is Quantity # of Applications 3cst EROSION/SEDIMENT CONTROL 7Fumber Backfill & compaction -embankment ESC-1 $ 5.62 CY ,Check dams, 4'' minus rock ESC-2 SWDM 5.4.6.3 $ 67.51 Each Crushed surfacing 1 1/4" minus ESC-3 WSDOT 9-03.9(3) $ 85.45 CY Ditching iExcavation-bulk Fence, silt ESC-4 ESC-5 ESC-6 SWDM 5.4.3.1 $ 8.08 $ 1.50 $ 1.38 CY CY LF 150 170 11 1 225, 235' Fence, Temporary (NGPE) ESC-7 $ 1.38 LF Hydroseeding ESC-8 SWDM 5.4.2.4 $ 0.59 SY Jute Mesh Mulch, by hand, straw, 3" deep IESC-10 JJjMulch, by machine, straw, 2" deep jPiping, temporary, CPP, 6" Piping, temporary, CPP, 8" ;Piping, temporary, CPP, 12" ESC-9 ESC-11 ESC-12 ESC-13 ESC-14 SWDM 5.4.2.2 SWDM 5.4.2.1 SWDM 5.4.2.1 $ 1.45 $ 2.01 $ 0.53 $ 10.70 $ 16.10 $ 20.70 SY SY SY LF LF LF Plastic covering, 6mm thick, sandbagged ESC-15 SWDM 5.4.2.3 $ 2.30 SY [Rip machine placed; slopes Rock Construction Entrance, 50'x15'x1' ESC-16 ESC-17 WSDOT 9-13.1(2) SWDM 5.4.4.1 $ 39.08 $ 1,464.34 CY Each 1 1 1464 Rock Construction Entrance, 100'x15'x1' ESC-18 SWDM 5.4.4.1 $ 2,928.68 Each Sediment pond riser assembly ESC-19 SWDM 5.4.5.2 $ 1,949.38 Each Sediment trap, 5' high berm i ESC-20 SWDM 5.4.5.1 $ 17.91 LF Sed. trap, 5' high, riprapped spillway berm section ESC-21 SWDM 5.4.5.1 $ 68.54 LF Seeding, by hand Sodding, 1" deep, level ground ESC-22 SWDM 5.4.2.4 $ 0.51 SY ESC-23 SWDM 5.4.2.5 $ 8.03 SY Sodding, 1" deep, sloped ground TESC Supervisor ESC-24 ESC-25 SWDM 5.4.2.5 $ 7.45 $ 74.75 SY HR 8 11 598 Water truck, dust control ESC-26 SWDM 5.4.7 $ 97.75 HR WRITE -IN -ITEMS **** (see ne e Each Page 2 of 9 Bond Quantity Worksheet 3 ESC SUBTOTAL: 30% CONTINGENCY & MOBILIZATION: ESC TOTAL: COLUMN: X 120°l0 S 2,521.94 $ 756.58 $ 3,278.52 A Unit prices updated: 02/12/02 Version: 11 /26/2008 Report Date: 10/18/2013 Web date: 12/02/2008 Existing Right -of -Way Future Public Right of Way & Drainage Facilities Private Improvements Quantity Completed (Bond Reduction)* Quant. Unit Price Unit Quant. Cost Quant, Cost Q,,nt L Cost Complete Cost GENERAL ITEMS No. Backfill & Compaction- embankment GI-1 $ 5,62 CY Backfill & Compaction- trench GI -2 $ 8,53 CY Clear/Remove Brush, by hand GI-3 $ 0.36 SY Clearing/Grubbing/Tree Removal GI-4 $ 8,876.16 Acre Excavation - bulk GI - 5 $ 1.50 CY Excavation - Trench GI-61 $ 4.06 CY 15 60.90 Fencing, cedar, 6' high GI - 7 $ 18.55 LF Fencing, chain link, vinyl coated, 6' high GI - 8 $ 13.44 LF Fencing, chain link, gate, vinyl coated, 2 GI - 9 $ 1,271,81 Each Fencing, split rail, 3' high GI - 10 $ 12,12 LF Fill & compact - common barrow GI - 11 $ 22.57 CY Fill & compact - gravel base GI - 12 $ 25.48 CY Fill & compact - screened topsoil GI - 13 $ 37.85 CY Gabion, 12" deep, stone filled mesh GI - 14 $ 54.31 SY Gabion, 18" deep, stone filled mesh GI - 15 $ 74.85 SY Gabion, 36" deep, stone filled mesh GI - 16 $ 132.48 SY Grading, fine, by hand GI - 17 $ 2.02 SY Grading, fine, with grader GI - 18 $ 0.95 SY 200 190.00 Monuments, 3' long GI - 19 S 135.13 Each Sensitive Areas Sign Sodding, V deep, sloped ground Surveying, line & grade GI - 20 GI - 21 GI - 22 $ 2.88 $ 7.46 $ 788.26 Each SY Day Surveying, lot location/lines GI - 23 $ 1,556.64 Acre Traffic control crew ( 2 flaggers) GI - 24 $ 85.18 HR 16 1,362.88 Trail, 4" chipped wood GI - 25 $ 7.59 SY Trail, 4" crushed cinder GI - 26 $ 8.33 SY Trail, 4" top course GI - 27 S 8.19 SY Wall, retaining, concrete GI - 28 $ 44.16 SF Wall, rockery GI - 29 $ 9A9 1SF Page 3 of 9 SUBTOTAL 1,613.78 Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 11/26/08 Bond Quantity Worksheet 3 Report Date: 10/18/2013 Web date: 12/02/2008 Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Bond Reduction' Quant. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Complete Cost ROAD IMPROVEMENT No. AC Grinding, 4' wide machine < 1000sy RI - 1 $ 28.00 SY AC Grinding, 4' wide machine 1000-200 RI - 2 $ 15.00 SY AC Grinding, 4' wide machine > 2000sy RI -3 $ 7.00 BY AC Removal/Disposal/Repair RI - 4 $ 67.50 SY Barricade, type I RI - 5 $ 30.03 LF Barricade, type III ( Permanent) RI - 6 $ 45.05 LF Curb & Gutter, rolled RI - 7 $ 17.00 LF Curb & Gutter, vertical RI - 8 $ 12.50 LF 88 1,100.00 Curb and Gutter, demolition and disposa RI - 9 $ 18.00 LF Curb, extruded asphalt RI - 10 $ 5.50 LF 150 825.00 Curb, extruded concrete RI - 11 $ 7.00 LF Sawcut, asphalt, 3" depth RI - 12 $ 1.85 LF 215 397.75 Sawcut, concrete, per 1"depth RI - 13 $ 1.69 LF Sealant, asphalt RI - 14 $ 1.25 LF 215 268.75 Shoulder, AC, ( see AC road unit price) Ri - 15 $ - SY Shoulder, gravel, 4" thick Rl - 16 $ 15.00 SY Sidewalk, 4" thick RI - 17 $ 35.00 SY Sidewalk, 4" thick, demolition and dispos Rl - 18 $ 29.50 SY Sidewalk, S" thick RE - 19 $ 38.50 SY Sidewalk, 5" thick, demolition and dispos RI - 20 $ 37.50 SY Sign, handicap RI - 21 $ 85.28 Each Striping, per stall RI - 22 $ 5.82 Each Striping, thermoplastic, ( for crosswalk) RI - 23 $ 2.38 SF Striping, 4" refiectorized line RI - 24 $ 0.25 LF Page 4 of 9 SUBTOTAL 1.766.50 825.00 Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 11/26/08 Bond Quantity Worksheet 3 Report Date: 10/18/2013 Web date: 12/02/2008 Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Bond Reduction* Quant. Unit Price Unit Quant. Cost Quant. I Cost Quant. Cost Complete Cost ROAD SURFACING (4" Rock = 2.5 base & 1.5" top course) For'93 KCRS ( 6.5" Rock= 5" base & 1.5" top course) For KCRS '93, (additional 2.5" base) add RS - 1 $ 3.60 SY AC Overlay, 1.5" AC RS - 2 $ 11.25 SY AC Overlay, 2" AC RS - 3 $ 15.00 SY AC Road, 2°, 4" rock, First 2500 SY RS - 4 $ 21.00 SY 160 3,360.00 AC Road, 2", 4" rock, Qty. over 2500SY RS - 5 $ 19.00 SY AC Road, 3°, 4" rock, First 2500 SY RS - 6 $ 23.30 SY AC Road, 3", 4" rock, Qty. over 2500 SY RS - 7 $ 21,00 SY AC Road, 5", First 2500 SY RS - 8 $ 27.60 SY AC Road, 5", Qty. Over 2500 SY RS - 9 $ 25.00 SY AC Road, 6", First 2500 SY RS- 1 $ 33.10 SY AC Road, 6", Qty. Over 2500 SY RS - 11 $ 30.00 SY Asphalt Treated Base, 4" thick RS- 1 $ 20.00 SY Gravel Road, 4" rock, First 2500 SY RS - 1 $ 15.00 SY Gravel Road, 4" rock, Qty. over 2500 SY RS - 14 $ 8.50 SY PCC Road, 5", no base, over 2500 SY RS-1 $ 27.00 SY PCC Road, 6", no base, over 2500 SY RS - 1 $ 25.50 SY Thickened Edge RS 1 $ 8.60 LF Page 5of9 SUBTOTAL 3,360.00 Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 11/26/08 Bond Quantity Worksheet 3 Report Date: 10/18/2013 Web date: 12/02/2008 Existing Right-of-way Future Public Right of Way Drainage Facilities Private Improvements Bond Reduction* Quant. Complete Cost Unit Price Unit Quant. Cost Quant. Cost Quant. Cost DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe. Access Road, R/D D - 1 $ 21.00 1 SY Bollards - fixed D - 2 $ 240.74 Each Bollards - removable D - 3 $ 452.34 Each * (CBs include frame and lid) CB Type I D - 4 $ 1,257.64 Each 1 1,257.64 CB Type IL 0-5 $ 1,433.59 Each CB Type ll, 48" diameter D - 6 $ 2,033.57 Each for additional depth over 4' D - 7 $ 436.52 FT CB Type II, 54" diameter D - 8 S 2,192.54 Each for additional depth over 4' D - 9 $ 486.53 FT CB Type II, 60" diameter D - 10 $ 2,361.52 Each for additional depth over 4' D - 11 $ 536.54 FT CB Type II, 72" diameter D - 12 $ 3,212.64 Each for additional depth over 4' D - 13 $ 692.21 FT Through -curb Inlet Framework (Add) D - 14 $ 366.09 Each Cleanout, PVC, 4" D - 15 $ 130.55 Each Cleanout, PVC, 6" D - 16 $ 174.90 Each Cleanout, PVC, 8" D - 17 $ 224.19 Each Culvert, PVC, 4" D - 18 $ 8.64 LF Culvert, PVC, 6" D - 19 $ 12.60 LF Culvert, PVC, 8" D - 20 $ 13.33 LF Culvert, PVC, 12" D - 21 $ 21.77 LF Culvert, CMP, 8" D - 22 $ 17.25 LF Culvert, CMP, 12" D - 23 $ 26.45 LF Culvert, CMP, 15" D - 24 $ 32.73 LF Culvert, CMP, 18" D - 25 $ 37.74 LF Culvert, CMP, 24" D - 26 $ 53.33 LF Culvert, CMP, 30" D - 27 $ 71.45 LF Culvert, CMP, 36" D - 28 $ 112.11 LF Culvert, CMP, 48" D - 29 $ 14C.83 LF Culvert, CMP, 60" D - 30 $ 235.45 LF Culvert, CMP, 72" D - 31 $ 302.58 LF Page 6 of 9 SUBTOTAL 1,257.64 Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 11/26/08 Bond Quantity Worksheet 3 Report Date: 10/18/2013 Web date: 12/02/2008 DRAINAGE CONTINUED Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Bond Reduction* Quant. No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Complete Cost Culvert, Concrete, 8" D - 32 $ 21.02 LF Culvert, Concrete, 12" D - 33 $ 30.05 LF Culvert, Concrete, 15" D - 34 S 37.34 LF Culvert, Concrete, 18" D - 35 $ 44.51 LF Culvert, Concrete, 24" D - 36 $ 61.07 LF Culvert, Concrete, 30" D - 37 $ 104.18 LF Culvert, Concrete, 36" D - 38 $ 137,63 LF Culvert, Concrete, 42" D - 39 $ 158.42 LF Culvert: Concrete, 48" D-40 $ 175.94 LF Culvert, CPP, 6" D - 41 $ 10.70 LF Culvert, CPP, 8" D - 42 $ 16.10 LF Culvert, CPP, 12" D - 43 $ 20.70 LF Culvert, CPP, 15" D - 44 $ 23.00 LF Culvert, CPP, 18" D - 45 $ 27.60 LF Culvert, CPP, 24" D - 46 $ 36.80 LF Culvert, CPP, 30" D - 47 $ 48.30 LF Culvert, CPP, 36" D - 48 $ 55.20 LF Ditching D-49 $ 8,08 Cy Flow Dispersal Trench (1,438 base+) D - 50 $ 25,99 LF French Drain (3' depth) D - 51 $ 22.60 LF Geotextile, laid in trench, polypropylene D - 52 $ 2.40 SY Infiltration pond testing D - 53 $ 74.75 HR Mid -tank Access Riser, 48" dia, 6' deep D - 54 $ 1,605.40 Each Pond Overflow Spillway D - 55 $ 14.01 SY Restrictor/Oil Separator, 12" D - 56 $ 1,045.19 Each Restrictor/Oil Separator, 15" D - 57 $ 1,095.56 Each Restrictor/Oil Separator, 18" D - 58 $ 1,146.16 Each Riprap, placed D - 59 $ 39.08 CY 0.25 9.77 Tank End Reducer (36" diameter) D - 60 $ 1,000,50 Each Trash Rack, 12" D - 61 $ 211.97 Each Trash Rack, 15" D - 62 $ 237.27 Each Trash Rack, 18" D - 63 $ 268.89 Each Trash Rack, 21" D - 64 $ 306.84 Each Page 7 of 9 SUBTOTAL 9.77 Unit prices updated: 02/12/02 "KCC 27A authorizes only one bond reduction. Version: 11/26/08 Bond Quantity Worksheet 3 Report Date: 10/1812013 Site Improve-ment Bond Quantity Worksheet Web date: 12/02/2003 Existing Future Public Private Bond Reduction" Right-of-way Right of Way Improvements Quant. & Drainage Facilities Unit Price Unit Quant. Price Quant. Cost Quant. Cost Completel Cost PARKING LOT SURFACING I N o. 2" AC, 2" top course rock & 4" borrow PL-11 S 21.00 SY 2" AC, 1.5" top course & 2.5" base cour PL - 2 $ 28.00 SY I 4" select borrow PL - 3 $ 4.55 SY 1.5" top course rock & 2.5" base course PL - 4 $ 11.41 SY UTILITY POLES & STREET LIGHTfNG Utility pole relocation costs must be accompanied by Franchise Utility's Cost Statement Utility Pole(s) Relocation UP-1 Lump Sum Street Light Poles w/Luminaires UP-2 Each WRITE -IN -ITEMS (Such as detention/water quality vaults.) No. I WI-1 Each Culvert 8" DI I WI - 2 $ 35.00 LF I 32 1120 Pervious Asphalt Drive W/Rock WI - 3 $ 34.00 SY 3021 10,268.00 CTSC WI-4 S 20.00 SY 160� 3200 8" HDPE WI - 5 S 0.54 LF 27 14.58 CATCH BASIN FILTER INSERT WI - 6 $ 5.00 Each 4 20 WI-7 i WI-8 WI-9 WI-10 SUBTOTAL SUBTOTAL (SUM ALL PAGES): 30% CONTINGENCY & MOBILIZATION: GRANDTOTAL: COLUMN: Page 8 of 9 "KCC 27A authorizes only one bond reduction. Bond Quantity Worksheet 3 AI 74•SS ti1,742.2'" 1 ,362 7 16,,07&95 v, , S co4. g 5 C X �Zo�lo=3"I,183•aZ 10,268.00 11,093.00 3,327.90 14.420.90 D Unit prices updated: 02/12/02 Version: 11 /26/08 Report Date: 10/18/2013