pln20130004-approved cost estimate.pdfSite Improvement Bond Quantity Worksheet S15 Web date: 02/22/2013
x. King County
Department of Permitting & Environmental Review
35030 SE Douglas Street, Suite 210
Snoqualmie, Washington 98065-9266 For alternate formats, call 206-296-6600.
206-296-6600 TTY Relay 711
Project Name: Pineview Place Date: 10/22/2013
Location: 1020 2nd Ave. So., Edmonds, WA 98020 Project No.: 12-164 pLnj2®g0004
Activity No.:
Clearing greater than or equal to 5,000 board feet of timber?
yes
If yes,
Forest Practice Permit Number:
,RCW 76.09)
-1i se, _ -4 2Q, 713- & q
)IKL, o-rt+45re. _
l A WVOo YE�KTI
Page 1 of 9
1 /
� � 150► ���.2� t
!` 1
Pineview-cost-quantities_V_2.0.xls
X no
NA
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
22°l0 1�1s€��G-CwdJ ��5,�
-43,30 (. 2Z
BonJD
,aJZzlW13
Unit prices updated: 02/12/02
Version: 11 /26/2008
Report Date: 10/22/2013
Site Improvement Bond Quantity Worksheet S15 Web date: 02/22/2013
Reference #
Unit
Price
Unit
Quantity
# of
Applications
Cost
EROSION/SEDIMENT CONTROL
Number
Backfill & compaction -embankment
ESC-1
$ 5.62
CY
80
1
450
Check dams, 4" minus rock
ESC-2
SWDM 5.4.6.3
$ 67.51
Each
8
1
540
Crushed surfacing 1 1/4" minus
ESC-3
WSDOT 9-03.9(3)
$ 85.45
CY
Ditching
ESC-4
$ 8.08
CY
300
1
2424
Excavation -bulk
ESC-5
$ 1.50
CY
600
1
900
Fence, silt
ESC-6
SWDM 5.4.3.1
$ 1.38
LF
520
1
718
Fence, Temporary (NGPE)
ESC-7
$ 1.38
LF
126
1
174
Hydroseeding
ESC-8
SWDM 5.4.2.4
$ 0.59
SY
2420
1
1428
Jute Mesh
ESC-9
SWDM 5.4.2.2
$ 1.45
SY
67
Mulch, by hand, straw, 3" deep
ESC-10
SWDM 5.4.2.1
$ 2.01
SY
Mulch, by machine, straw, 2" deep
ESC-11
SWDM 5.4.2.1
$ 0.53
SY
Piping, temporary, CPP, 6"
ESC-12
$ 10.70
LF
Piping, temporary, CPP, 8"
ESC-13
$ 16.10
LF
Piping, temporary, CPP, 12"
ESC-14
$ 20.70
LF
Plastic covering, 6mm thick, sandbagged
ESC-15
SWDM 5.4.2.3
$ 2.30
SY
556
1
1279
Rip Rap, machine placed; slopes
ESC-16
WSDOT 9-13.1(2)
$ 39.08
CY
2
1
78
Rock Construction Entrance, 50'x15'x1'
ESC-17
SWDM 5.4.4.1
$ 1,464.34
Each
1
1
1464
Rock Construction Entrance, 100'x15'x1'
ESC-18
SWDM 5.4.4.1
$ 2,928.68
Each
Sediment pond riser assembly
ESC-19
SWDM 5.4.5.2
$ 1,949.38
Each
Sediment trap, 5' high berm
ESC-20
SWDM 5.4.5.1
$ 17.91
LF
Sed. trap, 5' high, riprapped spillway berm section
ESC-21
SWDM 5.4.5.1
$ 68.54
LF
Seeding, by hand
Sodding, 1" deep, level ground
ESC-22
SWDM 5.4.2.4
$ 0.51
SY
ESC-23
SWDM 5.4.2.5
$ 6.03
SY
Sodding, 1" deep, sloped ground
ESC-24
SWDM 5.4.2.5
$ 7.45
SY
TESC Supervisor
ESC-25
$ 74.75
HR
1
25
1869
Water truck, dust control
ESC-26
SWDM 5.4.7
$ 97.75
HR
1
20
1955
WRITE -IN -ITEMS **** (see page 91
1L"C SO LS
t 7G.w�
Each
yv
ESC SUBTOTAL:
30% CONTINGENCY & MOBILIZATION:
ESC TOTAL:
COLUMN:
Page 2 of 9
Pineview-cost-quantities_V_2.0.xis
$ 13,278.01
$ 3,983.40
$ 17,261.41 )( IU86
A
Unit prices updated: 02/12/02
Version: 11 /26/2008
Report Date: 10/22/2013
Site Improvement Bond Quantity Worksheet
Web date: 12/02/2008
Existing
Right -of -Way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Quantity Completed
(Bond Reduction)`
Quant.
Complete
Cost
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
GENERAL ITEMS
No.
Backfill & Compaction- embankment
GI - 1
$ 5.62
CY
Backfill & Compaction- trench
GI-2
$ 8.53
CY
Clear/Remove Brush, by hand
GI-3
$ 0.36
SY
Clearing/Grubbing/Tree Removal
GI-4
$ 8,876.16
Acre
0.00826
73.36
0.5
4,438.08
Excavation - bulk
GI-51
$ 1.50
CY
Excavation - Trench
GI-6
$ 4.06
CY
Fencing, cedar, 6' high
GI-7
$ 18.55
LF
Fencing, chain link, vinyl coated, 6' high
GI-8
$ 13.44
LF
Fencing, chain link, gate, vinyl coated, 21
GI-9
$ 1,271.81
Each
Fencing, split rail, 3' high
GI - 10
$ 12.12
LF
Fill & compact - common barrow
GI - 11
$ 22.57
CY
Fill & compact - gravel base
GI - 12
S 25.48
CY
Fill & compact - screened topsoil
GI - 13
S 37.85
CY
570
21,574.50
Gabion, 12" deep, stone filled mesh
GI - 14
S 54.31
SY
Gabion, 18" deep, stone filled mesh
GI - 15
S 74.85
SY
Gabion, 36" deep, stone filled mesh
GI - 16
$ 132.48
SY
Grading, fine, by hand
GI - 17
$ 2.02
SY
Grading, fine, with grader
GI - 18
$ 0.95
SY
Monuments, T long
GI - 19
$ 135.13
Each
Sensitive Areas Sign
GI - 20
$ 2.88
Each
Sodding, 1" deep, sloped ground
GI - 21
$ 7.46
SY
Surveying, line & grade
GI -22
$ 788.26
Day
2
1,576.52
Surveying, lot location/lines
GI - 23
$ 1,556.64
Acre
1
1,556.64
Traffic control crew ( 2 flaggers)
GI - 24
$ 85.18
HR
Trail, 4" chipped wood
GI - 25
$ 7.59
SY
Trail, 4" crushed cinder
GI - 26
$ 8.33
SY
Trail, 4" top course
GI - 27
$ 8.19
SY
Wall, retaining, concrete
GI - 28
$ 44.16
SF
Wall, rockery
IGI - 29
$ 9.49
SF
1 9451
8,968.05
Page 3 of 9
SUBTOTAL
I J.J�7
4to•S0
38,113.79
Unit prices updated: 02/12/02
`KCC 27A authorizes only one bond reduction. Version: 11/26/08
Pineview-cost-quantities_V_2.0.xls Report Date: 10/22/2013
Site Improvement Bond Quantity Worksheet
Web date: 12/02/2008
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Bond Reduction*
Quant.
Completel
Cost
Unit Price
Unil
Quant. Cost
Quant. Cost QuGni. Qost
ROAD IMPROVEMENT
No.
AC Grinding, 4' wide machine < 1000sy
RI-1
$ 28.00
SY
AC Grinding, 4' wide machine 1000-200
RI-2
$ 15.00
SY
AC Grinding, 4' wide machine > 2000sy
RI-3
$ 7.00
SY
AC Removal/Disposal/Repair
RI-4
$ 67.50
SY
wo
17930
Barricade, type I
RI - 5
1 $ 30.03
LF
Barricade, type III ( Permanent)
RI - 6
$ 45.05
LF
Curb & Gutter, rolled
RI - 7
$ 17.00
LF
Curb & Gutter, vertical
RI - 8
$ 12.50
LF
135
1,687.50
Curb and Gutter, demolition and disposa
RI - 9
$ 18.00
LF
Curb, extruded asphalt
RI - 10
$ 5.50
LF
Curb, extruded concrete
RI - 11
$ 7.00
LF
110
770.00
Sawcut, asphalt, 3" depth
RI - 12
$ 1.85
LF
213
394.05
Sawcut, concrete, per 1" depth
RI - 13
$ 1.69
LF
Sealant, asphalt
RI - 14
$ 1.25
LF
213
266.25
Shoulder, AC, ( see AC road unit price )
RI - 15
$ -
SY
Shoulder, gravel, 4" thick
RI - 16
$ 15.00
SY
Sidewalk, 4" thick
RI - 17
$ 35.00
SY
Sidewalk, 4" thick, demolition and dispos
RI - 18
$ 29.50
SY
Sidewalk, 5" thick
RI - 19
$ 38.50
SY
Sidewalk, 5" thick, demolition and dispos
RI - 20
$ 37.50
SY
Sign, handicap
RI - 21
$ 85.28
Each
Striping, per stall
RI - 22
$ 5.82
Each
Striping, thermoplastic, ( for crosswalk)
RI - 23
$ 2.38
SF
Striping, 4" reflectorized line
I RI - 24
$ 0.25
LF
Page 4 of 9
SUBTQTAL 2,347.80
770.00
Unit prices updated: 02/12/02
*KCC 27A authorizes only one bond reduction. Version: 11 /26/08
Pineview-cost-quantities_V_2.0.xls Report Date: 10/22/2013
Site Improvement Bond Quantity Worksheet
Web date: 12/02/2008
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Bond Reduction*
Quant.
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
Complete
Cost
ROAD SURFACING (4" Rock = 2.5 base & 1.5" top course) For'93 KCRS ( 6.5" Rock= 5" base & 1.5" top course)
For KCRS '93, (additional 2.5" base) add
RS - 1
$ 3.60
SY
AC Overlay, 1.5" AC
RS - 2
S 11.25
SY
AC Overlay, 2" AC
RS - 3
$ 15.00
SY
AC Road, 2", 4" rock, First 2500 SY
RS - 4
$ 21.00
SY
177
3,717.00
160
3,360.00
AC Road, 2", 4" rock, Qty. over 2500SY
RS - 5
S 19.00
SY
AC Road, 3", 4" rock, First 2500 SY
RS - 6
$ 23.30
SY
AC Road, 3", 4" rock, Qty. over 2500 SY
RS - 7
$ 21.00
SY
AC Road, 5", First 2500 SY
RS - 8
$ 27.60
SY
AC Road, 5", Qty. Over 2500 SY
RS - 9
$ 25,00
SY
AC Road, 6", First 2500 SY
RS - 1
$ 33.10
SY
AC Road, 6", Qty. Over 2500 SY
RS - 11
$ 30.00
SY
Asphalt Treated Base, 4" thick
RS - 1
$ 20.00
SY
Gravel Road, 4" rock, First 2500 SY
RS - 1
$ 15.00
SY
Gravel Road, 4" rock, Qty. over 2500 SY
RS - 1
$ 8.50
SY
PCC Road, 5", no base, over 2500 SY
RS - A
$ 27.00
SY
PCC Road, 6", no base, over 2500 SY
RS - 1
$ 25.50
SY
Thickened Edge
RS - Ij
S 8.60
LF
16
137.60
Page 5 of 9
61111:31rel IF-1"
3.717.00
.60
Unit prices updated: 02/12/02
*KCC 27A authorizes only one bond reduction. Version: 11/26/08
Pineview-cost-quantities V_2.0.xls Report Date: 10/22/2013
Site Improvement Bond Quantity Worksheet
Web date: 12/02/2008
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Bond Reduction;
Quant.
Complete
Cost
Unit Price
Unit
Quant. F cost
Quant. Cost
Quant. Cost
13RAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.
Access Road, R/D
D -1
$ 21.00
SY
Bollards - fixed
D - 2
$ 240.74
Each
Bollards - removable
D - 3
$ 452.34
Each
(CBs include frame and lid)
CB Type I
D - 4
$ 1,257.64
Each
2
2,515.28
7
8,803.48
CB Type IL
D - 5
$ 1,433.59
Each
CB Type II, 48" diameter
D - 6
$ 2,033.57
Each
for additional depth over 4'
D - 7
$ 436.52
FT
CB Type II, 54" diameter
D - 8
$ 2,192.54
Each
for additional depth over 4'
D - 9
$ 486.53
FT
CB Type II, 60" diameter
D - 10
$ 2,351,52
Each
for additional depth over 4'
D - 11
$ 536.54
FT
CB Type II, 72" diameter
D - 12
$ 3,212.64
Each
for additional depth over 4'
D - 13
$ 692.21
FT
Through -curb Inlet Framework (Add)
D - 14
$ 366.09
Each
Cleanout, PVC, 4"
D - 15
$ 130.55
Each
Cleanout, PVC, 6"
D - 16
$ 174.90
Each
Cleanout, PVC, 8"
D - 17
$ 224.19
Each
Culvert, PVC, 4"
D - 18
$ 8.64
LF
Culvert, PVC, 6"
D - 19
$ 12.60
LF
240
3,024.00
Culvert, PVC, 8"
D - 20
$ 13.33
LF
Culvert, PVC, 12"
D - 21
$ 21.77
LF
Culvert, CMP, 8"
D - 22
$ 17.25
LF
Culvert, CMP, 12"
D - 23
$ 26.45
LF
Culvert, CMP, 15"
D - 24
$ 32.73
LF
Culvert, CMP, 18"
D - 25
$ 37.74
LF
Culvert, CMP, 24"
D - 26
$ 53.33
LF
Culvert, CMP, 30"
D - 27
$ 71.45
LF
Culvert, CMP, 36"
D - 28
$ 112.11
LF
Culvert, CMP, 48"
D - 29
$ 140.83
LF
Culvert, CMP, 60"
D - 30
$ 235.45
LF
Culvert, CMP, 72"
D - 31
$ 302.58
LF
Page 6 of 9
SUBTOTAL 2,51528
11,827.48
Unit prices updated: 02/12/02
x'KCC 27A authorizes only one bond reduction. Version: 11/26/08
Pineview-cast-quantities_V_2.0.xls Report Date: 10/22/2013
Site Improvement Bond Quantity Worksheet
Web date: 1210212008
DRAINAGE CONTINUED
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
improvements
Bond Reduction*
Quant.
Complete
Cost
No.
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
Culvert, Concrete, 8"
D - 32
$ 21.02
LF
Culvert, Concrete, 12"
D - 33
$ 30.05
LF
Culvert, Concrete, 15"
D - 34
$ 37.34
LF
Culvert, Concrete, 18"
D - 35
$ 44,51
LF
Culvert, Concrete, 24"
D - 36
$ 61.07
LF
Culvert, Concrete, 30"
D - 37
$ 104.18
LF
Culvert, Concrete, 36"
D - 38
$ 137.63
LF
Culvert, Concrete, 42"
D - 39
$ 158.42
LF
Culvert, Concrete, 48"
D - 40
$ 175.94
LF
Culvert, CPP, 6"
D - 41
$ 10.70
LF
Culvert, CPP, 8"
D - 42
$ 16.10
LF
Culvert, CPP, 12"
D - 431
$ 20.70
LF
Culvert, CPP, 15"
D - 44
$ 23.00
LF
Culvert, CPP, 18"
D - 45
$ 27.60
LF
Culvert, CPP, 24"
D - 46
$ 36.80
LF
Culvert, CPP, 30"
D - 47
$ 48.30
LF
Culvert, CPP, 36"
D-48
$ 55.20
LF
Ditching
D-49
$ 8.08
CY
Flow Dispersal Trench (1,436 base+)
D - 50
$ 25.99
LF
French Drain (3' depth)
D - 51
$ 22.60
LF
310
7006
Geotextile, laid in trench, polypropylene
D - 52
$ 2.40
SY
80
192
Infiltration pond testing
D - 53
$ 74.75
HR
Mid -tank Access Riser, 48" dia, 6' deep
D - 54
$ 1,605.40
Each
Pond Overflow Spillway
D - 55
$ 14.01
SY
Restrictor/Oil Separator, 12"
D - 56
$ 1,045.19
Each
Restrictor/Oil Separator, 15"
D - 57
$ 1,095.56
Each
Restrictor/Oil Separator, 18"
D - 58
$ 1,146.16
Each
Riprap, placed
D - 59
$ 39.08
CY
Tank End Reducer (36" diameter)
D - 60
$ 1,000.50
Each
Trash Rack, 12"
1 D - 611
$ 211.97
1 Each
Trash Rack, 15"
D - 62
$ 237.27
Each
Trash Rack, 18"
D - 63
$ 268.89
Each
Trash Rack, 21"
D - 641
$ 306.84
Each
Page 7 of 9
SUBTOTAL
7198
Unit prices updated: 02/12/02
*KCC 27A authorizes only one bond reduction. Version: 11/26/08
Pineview-cost-quantities_V 2.0.xls Report Date: 10/22/2013
Site Improvement Bond Quantity Worksheet
Web date: 12/02/2008
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Bond Reduction*
Quant.
Unit Price
Unit
Quant. Price
Quant. Cost
Quant. Cost
Complete
Cori
PARKING LOT SURFACING
N o.
2" AC, 2" top course rock & 4" borrow
PL - 1
$ 21.00
SY
2" AC, 1.5" top course & 2.5" base cour
PL - 2
$ 28.00
SY
4" select borrow
PL - 3
$ 4.55
SY
1.5" top course rock & 2.5base course
PL-4
S 11.41
SY
i
UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied by Franchise Utility's Cost Statement
Utility Pole(s) Relocation
UP-1
Lump Sum
Street Light Poles w/Luminaires
UP-2
Each
WRITE -IN -ITEMS
(Such as detention/water quality vaults.)
No.
Water Service (1" IPS Poly 200 PSI)
WI - 1
$ 2.50
LF
120
300
1
2701 675.00
12"Ductile Iron Pipe
WI - 2
S 50.00
LF
53
2650
San.Force Main (2" 20OPS I IPS Poly)
WI - 3
S 3.00
LF
300
900.00
Pervious Pavement & Subgrade Prep
WI - 4
1 $ 50.00
SY
180
9,000.00
Rip Rap Pad
Wl - 5
$ 150.00
SF
2
300.00
Fire / Aid Address Signage
WI - 6
$ 25.00
EA
3
75.00
Sanitary Manhole / connections
WI-7
S 4,000.00
EA
1
4,000.00
6" San PVC (SDR 35)
WI-8
S 24.00
LF
24
576
SUBTOTAL
SUBTOTAL (SUM ALL PAGES):
30% CONTINGENCY & MOBILIZATION:
GRANDTOTAL:
COLUMN:
Page 8 of 9
*KCC 27A authorizes only one bond reduction.
Pineview-cost-quantities_V_2.0.xis
3,526.00
11,17T44
1 OtA —10"
iSW83
15;8-33:27
B �y
14,950.00
76,356.87
22,907.06
99.263.93
C _D
)( 120 "/,,
S% Unit prices updated: 02/12/02
Version: 11 /26/08
Report Date: 10/22/2013