Loading...
pln20130020-Soundview Lane-Civil Comments 4.pdfCITY OF EDMONDS CIVIL PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE: April 3, 2015 TO: Rob Michel rwmichel@nwlink.com FROM: Jeanie McConnell, Engineering Program Manager jeanie.mcconnell@edmondswa.gov RE: Subdivision File #: PLN20130020 Project: Soundview Lane — 3 lot SP Project Address: 7231 Soundview Lane During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to an Engineering Technician. City of Edmonds handouts and standard details can be referenced on the City website under Permit Assistance. Comments 1- August 11, 2014 Comments 2 — October 21, 2014 Comments 3 — February 6, 2015 Comments 4 — April 3, 2015 GENERAL 1. April 3, 2015 — Thank you for submitting a cost estimate. Please revise as follows: a. Add clearing/grubbing/tree removal b. Add Rockery c. Confirm SY for AC Road. The quantity provided is lower than my calculations. d. Revise line item Cleanout, PVC, 8" to call out any cleanouts on private property. Line item currently indicates pipe quantity in the ROW instead of cleanout quantity. e. Add storm pipe lineal footage in the ROW f. Verify lineal footage and size of storm pipe called out on private property. All storm pipe to be shown - detention subdrain, rockery/wall drains, etc. g. Add water service lines h. Add sewer pipe and cleanouts i. Add stop sign. Regarding street sign — post to be provided by contractor, street sign will be provided by City. Page 1 of 5 j_ Include an addendum that addresses implementation of the vegetation management plan as stated below. 2/6/2015 comment Response letter states the cost estimate worksheet will be provided once the plan review by the City is complete. Please note, as it is not clearly state below, the cost estimate shall also include an estimate for plants & labor associated with implementation of the vegetation management plan. The estimate will be used to calculate a performance bond and/or maintenance bond. 10/21/2014 comment — Please submit when civils are near final review. 8/11/2014 comment - Please provide an itemized engineers cost estimate, including units and unit prices, for both on -site and off -site (right-of-way) improvements, including all utilities, traffic control. Please use the King County Site Improvement Bond Quantity Worksheet and utilize the "write-in" sections where appropriate. • A bond is required to be placed for all erosion control measures, right-of-way and stormwater management improvements. Posting a bond for stormwater systems applies to subdivisions that involve 7,000 square feet or more of land disturbing activity and as well as on projects in a critical area or buffer including ESLHA. The amount of the bond will be based on 120% of the City approved estimate. The City will inform you of the appropriate bond amount after review of the cost estimate. Please obtain the appropriate subdivision improvement bond forms from the City. • If you intend to post a bond in order to record the subdivision, the bond amount will be based on the entire scope of the project. • Inspection fees for this project will be calculated at 3.3% of the 120% City approved estimate for all improvements. 2. April 3 2015 — Comment partially addressed. I will redline additional notes on the plans. 2/6/2015 comment — Thank you for including a traffic control plan. All required si ng age, however, has not been shown. Please refer to City handout E81 and update plans accordingly. 10/21/ 2014 comment — A note was added to the plans indicating a flagger would be provided at the intersection of Soundview Lane and Soundview Drive. Please include a TCP in the plan set that addresses placement of signage, cones, location of flaggers, etc. Soundview Lane is to be widened beyond its existing limits, which will create a greater impact at the intersection than just periodic placement of a flagger. 8/11/2014 comment - Please submit a traffic control and haul route plan for review and approval. 3. ok 4. ok April 3, 2015 — Special inspection form provided to applicant with these review comments. 2/6/2015 - Applicant has acknowledged this requirement and added a note on the plans. 10/21/2014 comment — The City can provide you with the appropriate special inspection form when the civils are near final plan approval. 8/11/2014 comment - Please note, special inspections will be required for public road compaction and construction of all elements of the private access road and drainage installation (related slope stability & foundation support). Page 2 of 5 STORMWATER ENGINEER REVIEW October 21, 2014 - The following comments are provided by Jerry Shuster, Stormwater Engineer. Please contact Jerry directly at 425-771-0220 or by email at ierry.shuster(a edmondswa.2ov with any specific questions you may have regarding these comments. 1. ok 2. ok 3. ok 4. ok 5. ok 6. ok PLANNING DIVISION COMMENTS: February 6, 2015 & October 21, 2014 - The following comments are provided by Jen Machuga, Associate Planner. Please contact Jen directly at 425-771-0220 or by email at jen.machugagedmondswa.gov with any specific questions you may have regardingthese hese comments. 1. ok 2. ok 3. ok 4. ok 5. ok 6. ok 7. ok Sheet 1 of 6 - SITE DEVELOPMENT PLAN 1. ok 2. ok 3. ok Sheet 2 of 6 — TESC & GRADING PLAN & DEMOLITION PLAN 1. ok 2. ok 3. ok 4. April 3, 2015 — This item was discussed during a phone conference call with the applicant on March loth. On March 251h an arborist letter from Shoffner Consulting was submitted to the City addressing the City's requirement for tree replacement based on the number of trees removed from the site. 29 replacement trees are required based on the number and Dbh of trees removed. The proposal includes 26 replacement trees, all located on private property. The City is agreeable to the planting of 26 trees on private property with the additional 3 trees planted within the City right-of-way. The plans will be redlined to include planting of 3 Dogwood trees within the ROW ... location to be determined in the field during construction. In addition, as noted in the letter, the vegetation management plan indicated planting of 36 trees in total on private property but due to spacing concerns the arborist recommended planting of 26 trees. The plans will be redlined to include Page 3 of 5 relocating the Western Red Cedars as appropriate instead of eliminating them all together. 2/6/2015 comment - The Tree Removal or Trimming within City Ruoff --Way policy was updated and the new policy was gpproved by City Council on November 18, 2014. I have discussed with our City Attorney whether or not this project vests to the old policy and in accordance with RCW 58.17.033, the removal of trees located within the City right -of -wad not fall under a land use control ordinance and therefore does not carry vesting. Thank you for the effort to address the previous plan review comment, however, the new policy no longer has a provision related to reimbursement for marketable timber. The new policy does, however, have a provision for tree replacement that will need to be addressed. I have attached a copy of the new policy at the end of these plan review comments. The plans do not state the caliper of trees being removed so I am not able to state what the replacement requirement would be. The policy states that a consulting arborist can review the recommended tree replacement ratio and make a final determination on appropriate replacement ratio for the site. If all required replacement trees can be planted in an appropriate location in the right-of-way or on the site, then a consulting arborist will not be necessary. The potential that the trees planted in the Native Vegetation Areas may count towards the required replacement was discussed by staff, but the policy does not have a provision that would allow for trees that are otherwise required as part of the development to count towards said replacement requirement. This issue could still be addressed by a consulting arborist with their recommended tree replacement ratio. Please revise plans and resubmit accordingly. 10/21/2014 comment - A note regarding this comment was added to the Native Vegetation Plan, however, that specific plan is intended to deal with vegetation on private property. While it is acceptable to keep the note on this plan, it shall be specifically called out on Sheet 2 (TESC, Grading & Demo Plan). As you had requested in our meeting on 8/19/2014, the policy regarding this requirement was emailed to you. The policy states that the required documentation shall be submitted to the City prior to approval and issuance of the right-of-way construction permit. Please submit at least three quotes/bids from tree removal contractors experienced in removal and sale of marketable timber. 8/11/2014 comment - Several trees proposed for removal are shown to be located within the City right-of-way. Please provide documentation showing these trees will not provide marketable timber. If the timber is marketable, the money provided to the owner/developer for removal of the tree(s) will need to be paid to the City. 5. ok 6. ok 7. ok Sheet 3 of 6 — ROAD, DRAINAGE & UTILITY PLAN 1. ok 2. ok 3. ok 4. ok 5. ok 6. ok 7. ok 8. ok Page 4 of 5 9. ok 10. ok 11. ok Sheet 4 of 6 — PROFILES NOTES & DETAILS 1. ok 2. ok 3. ok 4. ok 5. ok 6. ok Page 5 of 5