pln20140022_tiersma-final doc decision.pdfCITY OF EDMONDS
ENGINEERING DIVISION
Date: December 2, 2015
To: Jeri Machuga, Planner
From: JoAnne Zulauf, Engineering Technician
Subject: PLN20140022, Tiersma - Final Plat
22318 92°d Ave W — 2 lot Short Plat
The Engineering Division has found that the subject 2-lot short plat meets the requirements
established for civil subdivision improvements in accordance with Edmonds Community
Development Code (ECDC) 20.75.
Preliminary plat approval was issued by the Planning Division on December 19, 2014 and
included engineering conditions of approval in Attachment 4 of the staff report.
Civil construction plans were submitted to the Engineering Division on April 30, 2015
consistent with the conditions of approval and ECDC 20.75.120. The plans were approved
for construction on September 23, 2015. The improvements shown on the approved plans
have not yet been constructed. Consistent with ECDC 20.75.130, a performance bond has
been posted as surety that these improvements will be completed within 12 months following
recording of the plat. A performance bond was submitted by the developer and accepted by
the City on 10/30/15 reflecting the total cost to construct all required improvements in the
amount of $35,148.19.
Thank you.