Loading...
pln20140022_tiersma-final doc decision.pdfCITY OF EDMONDS ENGINEERING DIVISION Date: December 2, 2015 To: Jeri Machuga, Planner From: JoAnne Zulauf, Engineering Technician Subject: PLN20140022, Tiersma - Final Plat 22318 92°d Ave W — 2 lot Short Plat The Engineering Division has found that the subject 2-lot short plat meets the requirements established for civil subdivision improvements in accordance with Edmonds Community Development Code (ECDC) 20.75. Preliminary plat approval was issued by the Planning Division on December 19, 2014 and included engineering conditions of approval in Attachment 4 of the staff report. Civil construction plans were submitted to the Engineering Division on April 30, 2015 consistent with the conditions of approval and ECDC 20.75.120. The plans were approved for construction on September 23, 2015. The improvements shown on the approved plans have not yet been constructed. Consistent with ECDC 20.75.130, a performance bond has been posted as surety that these improvements will be completed within 12 months following recording of the plat. A performance bond was submitted by the developer and accepted by the City on 10/30/15 reflecting the total cost to construct all required improvements in the amount of $35,148.19. Thank you. City of Edmonds