Loading...
pln20140075_Final Docs.Comment-2.doc th C ITY OF E DMONDS • 121 5 A VENUE N ORTH • E DMONDS, WA 98020 P HONE: 425.771.0220 • F AX: 425.771.0221 • W EB: www.edmondswa.gov D EVELOPMENT S ERVICES D EPARTMENT: P LANNING • B UILDING P UBLIC WORKS DEPARTMENT: ENGINEERING nd DATE: May 31, 2017 June 27, 2017 2 review TO: Mike Clugston, Associate Planner – Development Services Department FROM: JoAnne Zulauf, Engineering Technician – Public Works Department ST RE: COMMENTS ON 1 DRAFT RECORDING DOCUMENTS FOR MIONE SHORT PLAT, FILE NO. PLN20140075 The Engineering Division has reviewed the first draft of the recording documents, and it was found that the following information, corrections, or clarifications will need to be addressed before review can continue: Sheet 1: 1. Done. 2. Done. 3. Done. 4. Done. 5. Done. 6. 6/27/17 Please label as Private Easement on sheet 1 and add “private” to the utility easement call out on Lot B. Is this the 20 ft easement? Please add the easement width to the description on sheet 1 and to call out. The utility easement includes utilities benefitting both Lot A and Lot B. In the easement provisions, only Lot A is identified as using and maintaining the easement. Please revise to reflect the shared portion of the easement. An option may be to create two easements, one would be from the property frontage to just past the sewer stub out to Lot B and the other from past the sewer stub out to the Lot A/B property line. The shared easement should state something to the effect of no owner shall be responsible for utilities upstream of their connection. 7. 6/27/17 Please label as Public Easement on sheet 1 and add “public” to the utility easement call out on Lot B. For public utilities, cable, phone, gas etc. there is usually a separate easement. Usually this easement is located along the exterior 10 ft parallel with the adjoining street frontage of lot. For example: 8. Done. 9. Done. 10. Done. 11. Done. 12. Done. Sheet 2: Done. 6/27/17 New Comment Please remove the old property line crossing through the south area of the new parcel B. If the line is intended to depict something else, please clearly label.