PLN20150031 Request for Additional Info 10-13-16.pdfCITY OF EDMONDS 121 Sch Avenue North, Edmonds WA 98020 Phone: 42S.771.0220 • Fax: 42S.771.0221 • Web: www.edmondswa DEVELOPMENT SERVICES DEPARTMENT • PLANNING DIVISION fhC. 10" October 13, 2016 Mr. Terrance Wilson Via email: Terry@WilsonNeal.com SUBJECT: REQUEST FOR ADDITIONAL INFORMATION FOR SHORT PLAT APPLICATION LOCATED AT 18227 — 80Tu AVE. W. FILE NOS. PLN20150031 & PLN20160038 Dear Mr. Wilson: Upon review of your application for a modification request and the additional materials you submitted in support of your land use application for a three lot short plat located at 18227 — 80th Ave. W, it was found that further information/clarification is required. Please submit the following items at your earliest convenience including a response letter indicating how each item was addressed so that staff can continue processing your application: 1. Please revise your preliminary plans as necessary and provide a cover letter and supporting documents responding to the enclosed comments from the Engineering Division dated September 12, 2016. If you have any questions on the Engineering Division's comments, you may contact JoAnne Zulauf at (425) 771-0220 or JoAnne.Zulau@edmondswa.gov. Please submit the above information to the Planning Division as soon as possible so that staff may continue processing your application. Please keep in mind that a complete response to this information request must he received within 90 days or the application will lapse for lack of information (ECDC 20.02.003.D). Thus, your application will expire if the requested information is not received by January 11, 2017. If you have any questions, please do not hesitate to contact me via phone at (425) 771-0220 or via email at Jen.Machugagedmondswa.gov. Sincerely, Development Services Department - Planning Division Jen Mach uga Associate Planner Enclosure: Memorandum from JoAnne Zulauf dated September 12, 2016 Cc: File No. PLN20150031 Page 1 of 1 L�J Date: To: From: Subject 11l 101►I us] 7_1►11ULVA I December 21, 2015 — 2"d Submittal, — September 12, 2016 --3ra Submittal Mike Clugston, Associate Planner JoAnne Zulauf, Engineering Technician PLN20130031, Clear Vision 3 lot short plat 18227 801" Ave W The comments provided below are based upon review of the preliminary civil plans & documents for the subject short plat. Additional information is requested from the applicant at this time in order to continue review of the application and provide preliminary approval of the short plat. Please ask the applicant to provide a written response to each of the outstanding comments below and revise and resubmit plans accordingly. Please also note, after receiving preliminary short plat approval from the Planning Division, the applicant will be required to submit civil engineering plans to the City for review and approval after receiving preliminary short plat approval from the Planning Division. 12121115 In several of the responses it is stated that no sfrs are being proposed on the lot with this subdivision. During the preliminary process the goal is confirm that these will be buildable lots. Information gathered during this stage is to determine whether all site improvments are possible on each lot and that there will be no confilicts that render any of the proposed lots unbuildable. This review stage is also intended to provide the owner with a reasonable idea of what will be necessary to fully construct the improvements. Short plat construction will include the frontage improvements, driveway approaches, and the drainage system for the driveway approaches, and utility stubs to each lot. Hopefully this provides a little bit of clarity regarding our requests for information. Thank you. 1) Completed. 2) Completed. 3) Completed. 4) Completed. 5) Completed. 6) Completed. 7) 9/12/16 The comment is referencing the sewer connection. The plans have not been revised to include a manhole at the connection to the sewer main. 12/21/15 At the connection to the public sewer system a manhole will be required. Please show on plan. To show feasibility of the sewer system, provide rim and invert elevations from proposed structures on each lot to a clean out at City of Edmonds the property line and then on to a connection to the public sewer main. Please include length and size of all pipe to verify a minimum of 2% slope can be attained. 8) 9/12/16 See comments below regarding stormwater issues. 12121115 Please see the stormwater engineer's comments below. Please provide an infiltration stormwater report including testing information using one of the approved testing methods found in the City of Edmonds Stormwater Supplement Appendix C. The Supplement can be found on our website under Handouts. 9) 9/12/16 See Transportation Engineer comments below. 12111115 Please see transportation engineers comments below. The intention and arrangement of the access road(s) is unclear. a. Completed. b. Completed. c. Completed. 10) Completed. 12/21/15 Comments: Traffic Report Review: Bertrand Hauss, Transportation Engineer: I have concerns regardi ng access f rom / to LOT #1 onto 80th Ave. W (especi al I y f or dri vers backi ng out of driveway to access 80th Ave. W). #1) 1 n order to provide a safer access, the driveway from LOT #1 shoul d j of n the other (2) dri veways further to the east, so dri vers onl y have to turn thei r heads @ 90 degree angl a to see vehi cl es comi ng f rom the south (i nstead of much more / very uncomfortabl e unsafe position under current layout). Can that movement be completed safely / show AUTOTURN I ayouts? #2) 1 n order to f urther i mprove access f rom L OT 1 and 2 (for dri vers backi ng out), a turnaround wi thi n the property shout d be provi ded so they are faci ng 80th Ave. W. when coming out of the driveway. R ease see City Standard Detai I E2.6 for on -site turnaround requi rements. 9/12/16 Transportation Engineer Response: The resubmitted have not addressed the issues discussed in the comment above. See highlighted sections. The plans show no change to the Lot 1 entrance and its proximity to the property line. Also there is no turnaround area provided on Lot 1. Stormwater Review: Jerry Shuster, Stormwater En igneer 9/12/16 Stormwater Consultant Review Comments -See Below. The stormwater report information submitted is incomplete and therefore a full review was not possible. Infiltration is feasible on this site based on the soil descriptions in the geotech letter dated 3/11/2015. The figure in that report with the sieve analysis (plate 4) was difficult to read making it impossible to confirm any of the body of the report. Project is >10,000 sf of impervious is proposed and it is near a steep slope, I would require a pilot infiltration test (Appendix C of the Stormwater Supplement) for this site and not solely rely on sieve analyses. The drainage report appears to be using the pre -sizing tables to design the dry well. The project impervious is >10,000 therefore exceeds the maximum for using pre -sized calculations. The infiltration BMPS must be modeled. The modeling results included have no record of the input parameters so it is impossible to verify findings. The spreadsheet with impervious calculations is cut off. 9/12/2016 Comment: The Preliminary Stormwater Report indicates that the new + replaced impervious surface area is less than 10,000 s.f. The existing structure appears to drain towards the infiltration facility, which increases the tributary impervious surface area tributary to the proposed infiltration facility > 10,000 s.f The thresholds for the minimum requirements are based on the new + replaced impervious surface, but when designing infiltration facilities, all tributary surfaces must be taken into account. A pilot infiltration test (PIT) in the location of the proposed infiltration facility. Detail 3 on Sheet 3.1 indicates 3.0' (min) separation between the glacial till and/or groundwater and the bottom of the drywell aggregate. This elevation should be investigated and documented during the PIT. Note: The Infiltration Sizing Calculations Spreadsheet was cutoff, and therefore not reviewed fully (copy of cut off page attached). Because the total impervious surface area draining to the infiltration facility is > 10,000 s.f., a continuous flow model shall be used to size the facility. 9/12/16 Completed.The site will have >5000 sf pollution generating impervious surface. The proposal is an "oil water separator elbow" for this. They must include a treatment system per the Ecology 2005 manual. Please revise report and resubmit. Thank you.