Loading...
PLN20160015_SelectHomes-1 bond corrections.pdfSite Improvement Bond Quantity Worksheet S15 Webdate: 04/03/201E La King County Department of Permitting & Environmental Review 35030 SE Douglas Street, Suite 210 Snoqualmie, Washington 98065-9266 For alternate formats, call 206-296-6600. 206-296-6600 TW Relay 711 Project Name: Select 8721 218th St SW 2-Lot Short Plat Date: 10/11 /2016 Location: 8721 218th St SW Clearing greater than or equal to 5,000 board feet of timber? yes no If yes, Forest Practice Permit Number: (RCW 76.09) Page 1 of 9 Project No.: Activity No.: PLN 2016 0015 Note: All prices include labor, equipment, materials, overhead and profit. Prices are from RS Means data adjusted for the Seattle area or from local sources if not included in the RS Means database. TESC + ROW = 8,052..60 I 7� Private = $68,269.50 01 toq All = $86,322.00 cq--71 -5- A. q5 Bond to Construct: $18,052.50 x 120% = $21,663-00- Bond to Record: $86, 22:00 x 120% = $103,M6.40 Q Inspection Fees: $861322.d x 3.3% = $27848:6-3 15-032 8721 218th East SP - Bond Quantity Worksheet �1-71 Le-a4RECE 7q 1vED OCT 11 2016 ENGINEERING DMEiON Unit prices updated: 3/2/2015 Version: 3/2/2015 Report Date: 10/10/2016 Site Improvement Bond Quantity Worksheet S15 Webdate: 04/03/201: Reference # Unit Price Unit Quantity # of Applications Cost EROSION/SEDIMENT CONTROL Number Backfill & corn paction-embankment ESC-1 S 6.00 CY Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 $ 80.00 Each Crushed surfacing 1 1/4" minus ESC-3 WSDOT 9-03.9(3) $ 95.00 CY Ditching ESC-4 $ 9.00 CY Excavation -bulk ESC-5 $ 2.00 CY Fence, silt ESC-6 SWDM 5.4.3.1 $ 1.50 LF 250 1 375 Fence, Temporary (NGPE) ESC-7 $ 1.50 LF 71 Hydroseeding ESC-8 SWDM 5.4.2.4 $ 0.80 SY 1000 1 800 Jute Mesh ESC-9 SWDM 5.4.2.2 $ 3.50 SY Mulch, by hand, straw, 3" deep ESC-10 SWDM 5.4.2.1 $ 2.50 SY Mulch, by machine, straw, 2" deep ESC-11 SWDM 5.4.2.1 $ 2.00 SY Piping, temporary. CPP, 6" ESC-12 $ 12.00 LF Piping, temporary. CPP, 8" ESC-13 $ 14.00 LF Piping, temporary, CPP, 12" ESC-14 $ 18.00 LF Plastic covering, 6mm thick, sandbagged ESC-15 SWDM 5.4.2.3 $ 4.00 SY Rip Rap, machine placed; slopes ESC-16 WSDOT 9-13.1(2) $ 45.00 CY Rock Construction Entrance, 50'x15'x1' ESC-17 SWDM 5.4.4.1 $ 1.800.00 Each 1 1 1800 Rock Construction Entrance, 100'x15'x1' ESC-18 SWDM 5.4.4.1 $ 3.200.00 Each Sediment pond riser assembly ESC-19 SWDM 5.4.5.2 $ 2,200.00 Each Sediment trap, 5' high berm ESC-20 SWDM 5.4.5.1 $ 19.00 LF Sed. trap, 5' high, riprapped spillway berm section ESC-21 SWDM 5.4.5.1 $ 70.00 LF Seeding, by hand Sodding, 1" deep, level ground ESC-22 SWDM 5.4.2.4 $ 1.00 SY ESC-23 SWDM 5.4.2.5 $ 8.00 SY Sodding, 1" deep, sloped ground ESC-24 SWDM 5.4.2.5 $ 10.00 SY TESC Supervisor ESC-25 $ 110.00 HR 10 1 1100 Water truck, dust control ESC-26 SWDM 5.4.7 $ 140.00 HR 5 1 700 WRITE -IN -ITEMS **** (see page 9) Catchbasin Protection S 100.00 Each 5 1 500 ESC SUBTOTAL: 30% CONTINGENCY & MOBILIZATION: ESC TOTAL: COLUMN: Page 2 of 9 15-032 8721 218th East SP - Bond Quantity Worksheet 7 $ 5,275.00' $ 1.1582.50 $ 6,857.50 A Unit prices updated: 3/2/2015 Version: 3/2/2015 Report Date: 10/10/2016 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Existing Right -of -Way Future Public Right of Way & Drainage Facilities Private Improvements Unit Price Unit Quant. Cost Quant. Cost Quant F Cost GENERAL ITEMS No. Backfill & Compaction- embankment GI - 1 $ 6.00 CY 500 3.000.00 Backfill & Compaction- trench GI - 2 $ 9.00 CY Clear/Remove Brush, by hand GI - 3 $ 1.00 SY Clearing/Grubbing/Tree Removal GI - 4 $10,000.00 Acre 0.2 2,000.00 Excavation - bulk GI - 5 $ 2.00 CY 500 1,000.00 Excavation - Trench GI - 6 $ 5.00 CY Fencing, cedar, 6' high GI - 7 $ 20.00 LF Fencing. chain link. vinyl coated. 6' high GI-8 $ 20.00 LF Fencing, chain link, gate, vinyl coated, 2 GI-9 $ 1,400.00 Each Fencing, split rail, 3' high GI - 10 $ 15.00 LF Fill & compact - common barrow GI - 11 $ 25.00 CY Fill & compact - gravel base GI - 12 $ 27.00 CY Fill & compact - screened topsoil GI - 13 $ 39.00 CY Gabion. 12" deep, stone filled mesh GI - 14 $ 65.00 SY Gabion. 18" deep. stone filled mesh GI - 15 $ 90.00 SY Gabion, 36" deep, stone filled mesh GI - 16 $ 150.00 SY Grading. fine, by hand GI - 17 $ 2.50 SY Grading. fine. with grader GI - 18 $ 2.00 SY Monuments, 3' long GI - 19 $ 250.00 Each Sensitive Areas Sin GI - 20 $ 7.00 Each Sodding. 1" deep. sloped around GI - 21 $ 8.00 SY Surveying, line & grade GI - 22 $ 850.00 Da Surveying. lot location/lines GI - 23 $ 1,800.00 Acre Traffic control crew ( 2 fla gers 1 GI - 24 $ 120.00 HR Trail, 4" chipped wood GI - 25 $ 8.00 SY Trail, 4" crushed cinder GI - 26 $ 9.00 SY Trail. 4" top course GI - 27 $ 12.00 SY Wall, retaining, concrete GI - 28 $ 55.00 SF 'Wall, rockery GI - 29 $ 15.00 SF Page 3 of 9 SUBTOTAL 6,000.00 Unit prices updated: 03/02/2015 *KCC 27A authorizes only one bond reduction. Version: 03/02/2015 15-032 8721 218th East SP - Bond Quantity Worksheet Report Date: 10/10/2016 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Unit Price Unit Quant. Cost Quant. Cost Quant, Cost ROAD IMPROVEMENT No. AC Grinding. 4' wide machine < 1000sv RI - 1 $ 30.00 SY AC Grindina. 4' wide machine 1000-2000 RI - 2 $ 16.00 SY AC Grinding, 4' wide machine > 2000s RI - 3 $ 10.00 SY AC Removal/Disposal RI - 4 $ 35.00 SY 40 1,400.00 190 6.650.00 Barricade. tvoe III ( Permanent 1 RI - 6 $ 56.00 LF Curb & Gutter, rolled RI - 7 $ 17.00 LF Curb & Gutter, vertical RI - 8 $ 12.50 LF Curb and Gutter. demolition and disposal RI-9 $ 18.00 LF Curb, extruded asphalt RI - 10 $ 5.50 LF Curb, extruded concrete RI - 11 $ 7.00 LF Sawcut, asphalt. 3" depth RI - 12 $ 1.85 LF 70 129.50 Sawcut, concrete, per 1" depth RI - 13 $ 3.00 LF Sealant, asphalt RI - 14 $ 2.00 LF 70 140.00 Shoulder. AC. ( see AC road unit price) RI - 15 $ - SY Shoulder. aravel. 4" thick RI - 16 $ 15.00 SY Sidewalk, 4" thick RI - 17 $ 38.00 SY Sidewalk. 4" thick, demolition and dispos RI - 18 $ 32.00 SY Sidewalk. 5" thick RI - 19 $ 41.00 SY Sidewalk, 5" thick, demolition and dispos RI - 20 $ 40.00 SY Sian, handicap RI - 21 $ 85.00 Each Striping, per stall RI - 22 $ 7.00 Each Striping, thermoplastic, ( for crosswalk ) RI - 23 $ 3.00 SF Strioina. 4" reflectorized line I RI - 24 $ 0.50 LF Page 4 of 9 SUBTOTAL 1,669.50 6,650.00 Unit prices updated: 03/02/2015 *KCC 27A authorizes only one bond reduction. Version: 03/02/2015 15-032 8721 218th East SP - Bond Quantity Worksheet Report Date: 10/10/2016 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Unit Price Unit Quant, Cost Quant. Cost Quant. Cost ROAD SURFACING No. (4" Rock = 2.5 base & 1.5" top course) 9 1/2" Rock= 8" base & 1.5" top course) Additional 2.5' Crushed Surfacing RS - 1 $ 3.60 SY HMA 1/2" Overlay. 1.5" RS-2 $ 14.00 SY HMA 1/2" Overlay 2" RS - 3 $ 18.00 SY HMA Road, 2", 4" rock, First 2500 SY RS-4 $ 28.00 SY HMA Road. 2". 4" rock. Qty. over 2500 S RS - 5 $ 21.00 SY HMA Road. 3". 9 1/2" Rock, First 2500 S RS - 6 $ 35.00 SY ( ;ab ' 7_7, 0 325 00 —150 1O251).O6 HMA Road, 3", 9 1/2" Rock, Qty Over 25 RS-7 $ 42.00 SY Not Used RS - 8 Not Used RS - 9 HMA Road, 6" Depth, First 2500 SY RS - 10 $ 33.10 SY HMA Road. 6" Depth. Qty. Over 2500 Sy RS - 11 $ 30.00 SY HMA 3/4" or V. 4" Depth RS - 12 $ 20.00 SY Gravel Road, 4" rock, First 2500 SY RS - 13 $ 15.00 SY Gravel Road. 4" rock, Qty. over 2500 SY RS - 14 $ 10.00 SY PCC Road (Add Under Write -Ins w/Desi iRS - 15 Thickened Edge IRS - 17 $ 8.60 LF QJSL4 h '588:00 Page 5 of 9 SUBTOTAL 7* 10 .3325:Ir l2� I1 A s.aamc I Unit prices updated: 03/02/2015 *KCC 27A authorizes only one bond reduction. Version: 03/02/2015 15-032 8721 218th East SP - Bond Quantity Worksheet Report Date: 10/10/2016 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Unit Price Unit Quant. Cost Quant.T Cost Quant. Cost DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices. Average of 4' cover was assumed. Assumeperforated PVC is same price as solid Di e. .Access Road, R/D D - 1 $ 21.00 SY Bollards - fixed D - 2 $ 240.74 Each Bollards - removable D - 3 $ 452.34 Each ' (CBs include frame and lid) CB TVDe I D - 4 $ 1.500.00 Each CB Type IL D - 5 $ 1,750.00 Each CB Type II, 48" diameter D - 6 $ 2.300.00 Each 4.6e0:00' for additional depth over 4' D - 7 $ 480.00 FT .4.-7 CB Type II, 54" diameter D - 8 $ 2.500.00 Each Z 60 for additional depth over 4' D - 9 $ 495.00 FT -Z CB Type II. 60" diameter D - 10 $ 2.800.00 Each for additional depth over 4' D - 11 $ 600.00 FT CB Type II, 72" diameter D - 12 $ 3.600.00 Each for additional depth over 4' D - 13 $ 850.00 FT Through -curb Inlet Framework (Add) D - 14 $ 400.00 Each Cleanout, PVC, 4" D - 15 $ 150.00 Each 1 150.00 Cleanout, PVC. 6" D - 16 $ 170.00 Each If 170:00 Cleanout. PVC. 8" D - 17 $ 200.00 Each Culvert, PVC, 4" D - 18 $ 10.00 LF 35 350.00 Culvert, PVC, 6" D - 19 $ 13.00 LF 19 247.00 34 442.00 Culvert. PVC. 8" D - 20 $ 15.00 LF Culvert, PVC, 12" D - 21 $ 23.00 LF Culvert, CMP, 8" D - 22 $ 19.00 LF Culvert. CMP. 12" D - 23 $ 29.00 LF Culvert, CMP, 15" D - 24 $ 35.00 LF Culvert, CMP, 18" D - 25 $ 41.00 LF Culvert. CMP. 24" D - 26 $ 56.00 LF Culvert, CMP, 30" D - 27 $ 78.00 LF Culvert, CMP, 36" D - 28 $ 130.00 LF Culvert. CMP. 48" D - 29 $ 190.00 LF Culvert, CMP, 60" D - 30 $ 270.00 LF Culvert, CMP, 72" D - 31 $ 350.00 LF Page 6 of 9 SUBTOTAL 247.00 C106�7 5,7-12 Unit prices updated: 03/02/2015 'KCC 27A authorizes only one bond reduction. Version: 03/02/2015 15-032 8721 218th East SP - Bond Quantity Worksheet Report Date: 10/10/2016 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 DRAINAGE CONTINUED Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements No. Unit Price Unit Quant. Cost Quant. T Cost I Qu—an—t.T Cost Culvert, Concrete, 8" D - 32 $ 25.00 LF Culvert, Concrete, 12" D - 33 $ 36.00 LF Culvert. Concrete. 15" D - 34 $ 42.00 LF Culvert, Concrete, 18" D - 35 $ 48.00 LF Culvert, Concrete, 24" D - 36 $ 78.00 LF Culvert. Concrete. 30" D - 37 $ 125.00 LF ,Culvert, Concrete, 36" D - 38 $ 150.00 LF 'Culvert, Concrete, 42" D - 39 $ 175.00 LF Culvert. Concrete. 48" D - 40 $ 205.00 LF Culvert, CPP, 6" D - 41 $ 14.00 LF Culvert, CPP, 8" D - 42 $ 16.00 LF Culvert. CPP. 12" D - 43 $ 24.00 LF Culvert. CPP. 15" D - 44 $ 35.00 LF Culvert, CPP, 18" D - 45 $ 41.00 LF Culvert, CPP, 24" D - 46 $ 56.00 LF Culvert. CPP. 30" D - 47 $ 78.00 LF Culvert, CPP, 36" D - 48 $ 130.00 LF Ditching D - 49 $ 9.50 CY Flow Disoersal Trench (1.436 base+) D - 50 $ 28.00 LF French Drain (3' depth) D - 51 $ 26.00 LF Geotextile, laid in trench, polypropylene D - 52 $ 3.00 SY Mid -tank Access Riser. 48" dia. 6' deep D - 54 $ 2.000.00 Each Pond Overflow Spillway D - 55 $ 16.00 SY Restrictor/Oil Separator, 12" D - 56 $ 1,150.00 Each Restrictor/Oil Separator. 15" D - 57 $ 1.350.00 Each Restrictor/Oil Separator, 18" D - 58 $ 1,700.00 Each Riprap, placed D - 59 $ 42.00 CY Tank End Reducer (36" diameter) D - 60 $ 1,200.00 Each Trash Rack, 12" D - 61 $ 350.00 Each Trash Rack, 15" D - 62 $ 410.00 Each Trash Rack. 18" D - 63 $ 480.00 Each Trash Rack, 21" 1 D - 64 $ 550.00 Each Page 7 of 9 SUBTOTAL Unit prices updated: 03/02/2015 'KCC 27A authorizes only one bond reduction. Version: 03/02/2015 15-032 8721 218th East SP - Bond Quantity Worksheet Report Date: 10/10/2016 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Unit Price Unit Quant. Price Quant. T Cost Quant. Cost PARKING LOT SURFACING Not To Be Used For Roads Or Shoulders No. 2" AC. 2" top course rock & 4" borrow PL - 1 $ 21.00 SY NA NA 2" AC, 1.5" top course & 2.5" base cour PL - 2 $ 28.00 SY NA NA 4" select borrow PL - 3 $ 5.00 SY NA NA 1.5" top course rock & 2.5" base course PL - 4 $ 14.00 SY NA NA UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied b Franchise Utility's Cost Estimate Utilitv Pole(s) Relocation UP-1 Lump Sum Street Light Poles w/Luminaires UP-2 Each WRITE -IN -ITEMS (Such as detention/water quality vaults.) No. Traffic Control WI - 1 $ 2,000.00 Lump 1 2000 Detention Tank and Control Tee WI - 2 $25.000.00 Lump 1 25.000.00 Sewer- 6" Cleanout WI - 3 $ 170.00 Ea. 1 170 2 340.00 Sewer- 6" PVC WI - 4 $ 25.00 LF 115 2,875.00 Water Service WI - 5 $ 600.00 Ea. 2 1200 SUBTOTAL _qq 3,370.00 SUBTOTAL (SUM ALL PAGES): �5/ �.+-8;611.50" 30% CONTINGENCY & MOBILIZATION: 77; 79. 15 2,583.45 GRANDTOTAL: "!�j'15.1611,194.95 COLUMN: B Page 8 of 9 C 28,215.00 D—iD 52,515.05 15,754.50 68,269.50 D Unit prices updated: 03/02/2015 'KCC 27A authorizes only one bond reduction. Version: 03/02/2015 15-032 8721 218th East SP - Bond Quantity Worksheet Report Date: 10/10/2016 Site Improvement Bond Quantity Worksheet Original bond computations prepared by: Name: Rob Long, PE PE Registration Number: 36508 Firm Name: RAM Engineering, Inc. Address: 16531 13th Ave W, Suite A108 Lynnwood WA 98037 Stabilization/Erosion Sediment Control (ESC) Existing Right -of -Way Improvements Future Public Right of Way & Drainage Facilities Private Improvements Calculated Quantity Completed Total Right -of Way and/or Site Restoration Bond*/** (First $7,500 of bond* shall be cash. Performance Bond* Amount (A+B+C+D) = TOTAL Maintenance/Defect Bond* Total Web date: 04/03/2015 Date: 10/11 /2016 Tel. #: (425) 678-6960 Project No: PLN 2016 0015 FINANCIAL GUARANTEE REQUIREMENTS PERFORMANCE BOND* AMOUNT (A) $ :1 :;o Lo 6071 (B) $ 1140!Zi5d1 - (C) $ (A+B) $ 17, 1 S 1 • T 5mA&� (T) $ '?? 6P.1%,322.0 Minimum is $2000. MINIMUM BOND* AMOUNT REQUIRED FOR RECORDING OR TEMPORARY OCCUPANCY AT SUBSTANTIAL COMPLETION *** T x 0.30 $ 2"9e-.0— Minimum is $2000. PUBLIC ROAD & DRAINAGE MAINTENANCE/DEFECT BOND* (B+C) x 0.25 = $ 2.798.7 Minimum is $2000. NAME OF PERSON PREPARING BOND* REDUCTION: Rob Long, PE Date: 10/11/2016 * NOTE: The word "bond" as used in this document means a financial guarantee acceptable to King County. ** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required. The restoration requirement shall include the total cost for all TE�SC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included. Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity. *** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes. REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY Page 9 of 9 Unit prices updated: 03/02/2015 Check out the DDES Web site at www.kinpcounty.poy/permits Version: 03/02/2015 15-032 8721 218th East SP - Bond Quantity Worksheet Report Date: 10/10/2016