PLN20160025_StaffReportwithAttachments.pdfCITY OF EDMONDS tzl sth Avenue North, Edmonds WA 98020 Pho ne : 425.77 ]'0220 . Fax: 425.77 1.0221 . Web : www.ed mondswa.Rov DEVELOPMENT SERVICES DEPARTMENT . PLANNING DIVISION c. 18 PLANNING DIVISION PRELIMINARY SHORT PLAT REVIEW FINDINGS, CONCLUSIONS, & DECISION 218tr'street SW Two-Lot Short Subdivision PLN20160025 Project: File Number: Date of Report: Reviewed By: I. ber 22,2016 Owner/Applicant: Select Homes INTRODUCTION The applicant is proposing to subdivide a 24,572 square foot property located at 8820 - 218th Street SW into two lots (Attachments I- 4). The site is located within a Single- Family Residential (RS-8) zone. The proposed lot layout is shown on the preliminary subdivision map (Attachment 3). A. Application 1. Owner/Applicant: Select Homes 2. Contact: Kayla Clark 3. Site Location: 8820 -2l8th Street SW, Edmonds Tax Parcel 27 04300020 I 700 4. Request: To divide one lot with a total area of 24,572 square feet into two lots in a Single-Family Residential (RS-8) zone. 5. Review Process: Short plats are Type II decisions pursuant to ECDC 20.01.003. Following a public comment period, the Director (or designee) makes an administrative decision. B. Application Materials: The subject application was submitted on May 24,2016 (Attachments 1 - 2). The application was determined to be complete on June 21, 2016 pursuant to ECDC 20.02.002. However, additional information was found to be necessary in order for staff to complete its review, and a request for additional information was included in the letter of completeness issued on June 21,2016. In response to the request for additional information, the applicant submitted a revised preliminary short plat map (Attachment 3), preliminary development plans (Attachment 4), and preliminary storm drainage report (Attachment 5). The initial application the Edmonds Utilities Consortium form (Attachment 6). il. FINDINGS OF FACT AND CONCLUSIONS A. Setting: The site is located within a single-family residential neighborhood in central Edmonds. Refer to Attachment 7 for azoning and vicinity map indicating the zoning of surrounding properties. The subject property and the surrounding area are zoned RS-8 (single-family residential; 8,000 square foot minimum lot size). Two deteriorated existing residences on the property will be demolished. The neighborhood surrounding the site is developed with single family residences. B. Topography and Vegetation: The property is relatively level. The properties vegetation is in a somewhat unmaintained state and the survey for the project identifies approximately twenty-four trees on the subject property (Attachment 3). Trees must be retained to the maximum extent practical and only those trees that must be removed for the civil improvements associated with the subdivision may be removed prior to the construction of the new homes. The preliminary development plan indicates most of the trees will eventually be removed. C. Environmental Assessment 1. Critical Area: The subject property was réviewed and inspected for critical areas as defined by ECDC 23.40 under CR420160056, and it was determined that there are no critical areas on or adjacent to the subject property and awaiver was issued (Attachment 8). 2. Shoreline: The subject property is not located within shoreline jurisdiction. 3. SEPA: Review under the State Environmental Policy Act (SEPA) is not required for a short plat pursuant to WAC 197-11-800 (6Xd) - Land use decisions. D. Comments 1. Departmental Review: This project was reviewed by Snohomish County Fire District No. 1 and the City of Edmonds' Engineering Division. Snohomish County Fire District No. 1 did not have any comments on the proposed short plat (Attachment 9). The Engineering Division has found the information provided indicates general engineering feasibility; project-specific design, including final utility system design and location, as well as Title 18 Edmonds Community Development Code compliance, will be reviewed during the civil construction phase of this project. 218û Street SW Two-Lot Short Plat File No. PLN20160025 Page2 of 12 The proposed subdivision is subject to the Engineering Requirements for the short plat included in Attachment 10. 2. Public Notice and Comment: ECDC 20.03 provides the City's regulations for public notice of development applications. A "Notice of Application" dated June 29,2016 with a comment period running through July 13, 2016 was published in the Everett Hearing and posted at the subject site, Public Safety Complex, Development Services Department, and Library on June 29, 2016. The notice was also mailed to property owners within 300 feet of the site June 27,2016. Public notice documentation is included as Attachment 11. The City of Edmonds has complied with the public notice requirements of ECDC 20.03 The City of Edmonds received one comment letter from Patrick Gearin during the comment period (Attachment 12). Mr. Gearin's comments related to trees, setbacks, installation of a fence and construction noise. Staff Response: Trees: The City promotes the retention of as many trees as practicable and encourages the location of building areas with the goal of retaining as many of the trees as possible. For the purposes of the subdivision, tree retention will be reviewed with the civil improvement plans with the subdivision. Any tree cutting that is not a hazardous situation and/or not necessary as part of the subdivision improvements will be reviewed at the time of building permit application review. Attachment 4 shows the clearing limits for the subdivision improvements, which indicate the trees in the southwest corner will remain. Setbacks: See section II.E.3 for a discussion of setbacks for the subject property. The two lots will be considered flag lots with all side setback requirements. Side setbacks in the RS-8 zone are 7.5 feet. Attachment 4 shows potential locations for residences on the proposed lots. Compliance with zoning setbacks will be verified with the building permit review for each lot. Fence: The applicant may choose to install fences during construction of the residences; however, there are no provisions in the development code that require fence installation with the subdivision. Construction Noise: Noise in the City of Edmonds is regulated by Chapter 5.33 ECDC. E. ECDC 20.75.080 General Findings A proposed subdivision may only be approved if all the general findings listed in ECDC 20.75.080 can be made for the proposal as approved or as conditionally approved. Staff s findings in regard to ECDC 20.75.080 are detailed below. 218ú Street SV/ Two-Lot Short Plat File No. PLN20160025 Page 3 of 12 1. Subdivision Ordinance. The proposal is consistent the purposes of this chapter (øs listed in ECDC 20.75.020) and meets all requirements of this chapter. The proposed two lot subdivision is consistent with ECDC 20.75.020 and all the requirements of the ECDC 20.75. The proposed subdivision will not negatively impact public health, safety or general welfare, will not negatively impact congestion on streets and highways, will have adequate access to water, utilities, sewerage, storm drainage and will provide proper ingress and egress as well as be uniformly monumented. 2. Comprehensive Plan. The proposal is consistent with the provisions of the Edmonds Comprehensive Plan, or other adopted city policy, and is in the public interest. The subject property is located within the Single Family - Urban I comprehensive plan designation. The Comprehensive Plan has the following stated goals and policies for Residential Development that apply to this project. Resídential Development A. Goal. High quality residential development which is appropriate to the diverse lifestyle of Edmonds residents should be maintained and promoted. The options available to the City to influence the quality of housing for all citizens should be approached realistically in bølancing economic and aesthetic consideration. 4.1. Encourage those building custom homes to design and construct homes with architectural lines which enable them to harmonize with the sunoundings, adding to the community identity and desirability. 4.3. Minimize encroachment on view of existing homes by new construction or additions to existing structures.4.4. Support retention and rehabilitation of older housing within Edmonds whenever it is economicallyfeasible. 4.5. Protect residential areas from incompatible land uses through the careful control of other types of development and expansion based upon the following principles: A.5.b. Trffic not directly accessing residences in ø neighborhood must be discouraged. 4.5.d. Private properîy must be protected fro* adverse environmental impacts of development including noise, drainage, trffic, slides, etc. 4.6. Require that new residential development be compatible with the natural constraints of slopes, soils, geologt, vegetation and drainage. (2015 Comprehensive Plan, page 66) Compliance with the Residential Development goals and policies: The subdivision will allow the construction for two new residences. No views will be impacted by the development. Traffic impact fees consistent with Chapter 18.82 218th Street SW Two-Lot Short Plat File No. PLN20160025 Page 4 of 72 ECDC are collected with building permits for each individual lot to mitigate traffic impacts. The overall proposal should not cause any adverse impacts and appears to be consistent with the residential development goals and policies of the Comprehensive Plan. Therefore, staff finds that the proposal is consistent with the Comprehensive Plan. 3. Zoning Ordinance. The proposal meets all requirements of the zoning ordinance, or a modificqtion has been approved as providedþr in this chapter. The subject property is located in the RS-8 Single-Family Residential zone and is subject to the requirements of ECDC 16.20. Pursuant to ECDC 16.20.030 development standards of the RS-8 zone are as follows: Density means "dwelling units per acre" determined by dividing the total lot area by the density allowed by the underlying zoning; the number of lots or units permitted shall be rounded down to the nearest whole number. Minimum Lot Area: The subject site is 24,572 square feet. The proposed lot areas are as follows Net lot area excludes the area ofany vehicular ingress/egress easements. As proposed, both lots proposed for construction of single-family residences exceed the minimum required net area of 8,000 square feet per lot, which is compliant with the lot area requirements. Density: At 24,572 square feet, a total of 3 dwelling units may be developed on the subject property (0.56 acres * 5.5 dwelling units per acre). The applicant is proposing to develop the site with two single-family dwellings which is compliant with the density requirements. Minimum Lot Width: Pursuant to ECDC 2I.55.050,1ot width is the minimum diameter of a lot width circle that must fit within alot (70 feet in this instance). A 7O-foot diameter lot width circle fits into each of the proposed lots; therefore the proposal is consistent with the lot width requirement. Corner Lots: Neither of the proposed lots will be corner lots. Flag or Interior Lot Determination: Both of the proposed lots will be flag lots. Setbacks: Based on the development standards for the RS-8 zone, setbacks for 218ü Street SW Two-Lot Short Plat File No. PLN20160025 Page 5 of 12 Zone Minimum Lot Area (Sq. Ft.) Maximum Densityr Minimum Lot Width Minimum Street Setback Minimum Side Setback Minimum Rear Setback Maximum Height Maximum Coverage Parking RS-8 8,000 5.5 70'25',7.5 l5'25'35o/o 2 Required Lot Area Proposed Gross Area (sq. ft.) Proposed Net Arear (sq. ft.) I1.093Lot I 8,000 12,327 12,24s I I,l5lLot28,000 the proposed lots should be as follows Lot 1: Side Setback (7.5 feet):From all property lines and the access easement. Lot2: Side Setback (7.5 feet):From all property lines and the access easement. All of the existing structures on the property have been identified for removal. Lot Coverage of Existing Buildings on Proposed Lots: With the removal of the existing structures, there will be no structures on the property, so coverage after the proposed subdivision would be 0%o on all the lots. Compliance with the coverage requirements will be evaluated with future building permits. Parking: Single-family residences are required to provide two off-street parking spaces. Compliance with this standffd will be reviewed with future building permits for the proposed lots. Staff finds the proposal is consistent the zoningrequirements for the RS-8 zone as contained in ECDC 16.20. 4. Flood Plain Management. The proposal meets all requirements of the Edmonds Community Development code relating toflood plain management. The proposed project is not located within a designated flood plain management alea. F. ECDC 20.75.085 - Review Criteria. Pursuant to ECDC 20.75.085, the following criteria shall be used to review proposed subdivisions: l. Environmental. a. Where environmental resources existing, such as trees, streams, ravines or wildlife habitats, the proposal shall be designed to minimize significant adverse impacts to resources. Permanent restrictions may be imposed on the proposal to øvoid impact. The survey for the property identifies approximately twenty-four trees on the subject property. No streams, ravines or other environmental resources are present on the site. The City promotes the retention of as many trees as practicable and encourages the location of building areas with the goal of retaining as many of the trees as possible. For the purposes of the subdivision, tree retention will be reviewed with the civil improvement plans with the subdivision. A proposed condition of preliminary approval is that any tree cutting that is not a hazardous situation and/or not necessary as part of the subdivision improvements shall be reviewed at the time of building permit application review. Any trees retained should be protected during development in accordance with the performance standards in ECDC 18.45.050.H. Any tree cutting on the site is subject to the requirements of ECDC 18.45, or as 218û Street SW Two-Lot Short Plat File No. PLN20160025 Page 6 of 12 amended. A condition to this effect has been added as a condition of approval. Therefore, staff finds that the proposed subdivision is consistent with this criterion. b. The proposal shall be designed to minimize grading by using shared driveways and by relating street, house site and lot placement to the existing topography. The proposal minimizes grading because the two new lots will share a driveway with the existing residences on the north side of the development, the subject site is relatively level and the proposed lots placement on future home sites conform to the exiting topography. Therefore, staff finds that the proposed subdivision is consistent with this criterion. c. Where conditions exist which could be hazardous to the future residents of the land to be divided, or to nearby residents or property, such øs flood plains, steep slopes or unstable soil or geologic conditions, a subdivision of the høzardous land shqll be denied unless the condition can be permanently corrected, consistent with paragraphs A(1) and (2) of this section (Section II.F.1.a and II.F.1.b of this staff report). No known hazardous conditions, such as flood plains, steep slopes, or unstable soil or geologic conditions exist at this site. Therefore, staff finds that the proposed subdivision is consistent with this criterion. d. The proposal shall be designed to minimize offsite impacts on drainage, views and so forth. The proposed development must be designed to meet current code and minimize stormwater impacts. All new impervious surfaces must be connected to an onsite storm system as required by the Engineering Requirements (Attachment 10). The maximum height for a new house in the RS-8 zone is 25 feet from average original grade, which serves to minimize the negative impact to existing views in the vicinity. Aside from the height limits, the Edmonds Community Development Code does not contain specific regulations regarding private view protection within single-family zones. Therefore, staff finds that the proposed subdivision is consistent with this criterion. 2. Lot andStreet Layout. o. Lots shall be designed to contain q usable building area. If the building area would be dfficult to develop, the lot shall be redesigned or eliminated, unless special conditions can be imposed on the approval which will ensure that the lot is developed properly. 218ft Street SW Two-Lot Short Plat File No. PLN20160025 PageT of12 Both of proposed lots have been designed to accommodate single-family residences within the required setbacks for the RS-8 zone. The subject property is relatively level and should not be difficult to develop. Based on a review of the project and the analysis in this section, staff agrees that a two-lot short plat may be developed consistent with this requirement. Therefore, staff finds that the proposed subdivision is consistent with this criterion. b. Lots shall not front on highways, arterials or collector streets unless there is no otherfeasible qccess. Special access provisions, such as shared driveways, turnarounds or frontage streets moy be required to minimize trffic hazards The proposed lots take access off of 218th Street SW which is not identified as an arterial or collector street in the streets Transportation Plan. Therefore, staff finds that the proposed subdivision is consistent with this criterion. c. Esch lot shall meet the applicable dimensional requirements of the zoning ordinance. The subject property is located within the RS-8 zone. See Section II.E.3 for a discussion of compliance with the zoning standards. All proposed lots contain at least 8,000 square feet and are at least 70 feet in width and thus compliant with the dimensional requirements of the RS-8 zone. Therefore, staff finds that the proposed subdivision is consistent with thus criterion. d. Pedestrian walks or bicycle paths shall be provided to serve schools, parks, publicfacilities, shorelines and streams where street access is not adequate. The subject site is primarily served by three area public schools: Chase Lake Elementary School, College Place Middle School, and Edmonds-Woodway High School. Chase Lake Elementary is a little under % mile to the northeast and is therefore within walking distance of the project. There are some stretches of sidewalk along that portion of 218th Street but it is not a complete system. There is a crosswalk at 218th and 84th Avenue which provides pedestrian access to the elementary school to the north. The high school is slightly further to the northeast, also within walking distance. A bus serves College Place Middle, which is still further to the northeast, with a stop at Bowdoin Way and Pioneer V/ay. There are no sidewalks from the project site along 86th Avenue to get to the bus stop but the road is broad and well paved. No sidewalks are required with this project and there are currently no projects along this length of 218th Street identified in the City's Capital Facilities Plan. Staff finds that the proposed subdivision is consistent with this criterion. 3. Dedications a. The city council may require dedication of land in the proposed subdivision for public use. 2 I 8ü Street ä" iî: r'Jiiäläräli Page 8 of 12 b. Only the city council may approve a dedication of park land to satisfy the requirements of ECDC 20.75.090. The council may request a review and written recommendationfrom the planning advisory board. c. Any approval of a subdivision shall be conditioned on oppropriate dedication of lønd for streets, including those on the fficial street map and the preliminary plat. Per the City Engineering Division requirements (Attachment 10), no dedications are required. See Section II.G below regarding the dedication of park land. 4. Improvements. a. Improvements which may be required, but are not limited to, streets, curbs, pedestrian wallcs and bicycle poths, sidewallæ, street landscaping, water lines, sewage systems, drainage systems and underground utilities. b. The person or body approving a subdivision shøll determine the improvements necessary to meet the purposes and requirements of this chapter, and the requirements of: i. ECDC Title 18, Public Worl¡s Requirements; ii. Chapter 19.75, Fire Code, as tofire hydrants, water supply and access. This determination shøll be based on the recommendations of the community development director, the public worl<s director, and the fire chief. The subject project was reviewed by Snohomish County Fire District 1 and the Engineering Division. Improvements required in conjunction with the subject proposal are included in Attachment 10. Therefore, staff finds that the proposed subdivision is consistent with this criterion. c. The use of septic systems may be approved if all of the þllowing conditions are met: i. It is more than 200 feet, multiplied by the number of lots in the proposed subdivision,.from the neørest public sewer main to the nesrest boundary of the land to be divided. ii. The land to be divided is zoned RS-20. iii. The public worl<s director and city health fficer determine that soil, drainage and slope conditions are satisfactory for septic use and that all requirements of WAC 248-96-090 are met. There are no septic systems included as part of the proposed project. 5. Flood Plain Management. All subdivisions shall comply with the criteria set forth in the Edmonds community Development code þr flood plain management. The subject property is not located within a Flood Plain Management area. 218û Street SW Two-Lot Short Plat File No. PLN20160025 Page9 of 12 G. ECDC 20.75.090 - Park Land Dedication. According to ECDC 20.75.090, before or concurrent with the approval of the final plat of any subdivision, the subdivider shall dedicate land, pay a fee in-lieu of dedication, or do a combination of both, for park and recreational purposes. With the adoption of Ordinance 3934 in 2013, park impacts are now addressed through the assessment of park impact fees in accordance with Edmonds City Code (ECC) Chapter 3.36. No park dedication or fees are required with the subdivision. Park impact fees will be assessed with issuance of the future building permits on the new lots consistent with ECC 3.36. III. DECISION ON SUBDIVISION Based upon the Findings of Fact, Conclusions, and Attachments to this staff report, the application for a two-lot short plat on the property located at 8820 - 218th Street SW is APPROVED subject to the following conditions: 1. This application is subject to all applicable requirements contained in the Edmonds Community Development Code (ECDC). It is the responsibility of the applicant to ensure compliance with all applicable requirements. 2. The applicant is responsible for obtaining all local, state, and/or federal permits or approvals applicable to the proposal. 3. Prior to recording, the applicant must complete the following requirements: a. Civil plans must be approved prior to recording. In completing the civil plans, the following must be addressed: i. Complete the Engineering Division conditions listed "Required as a Condition of Subdivision" on Attachment 10. ii. A tree cutting plan shall be submitted and approved with the civil plans for removal of trees impacted by the subdivision improvements. Any tree cutting proposed on the site that is not a hazardous situation and/or not necessary as part of the subdivision improvements shall be reviewed at the time of building permit application or through the appropriate land use permit application and review process. All trees that are to be retained during the development process must be protected according to the performance standards found in ECDC 18.45.050.H. If during construction it is realized that certain trees that were planned to be retained will be damaged due to the construction activities, replacement may be required per ECDC 18.45.050.F. b. Make the following revisions to the plat: i. Add to the face of the plat: "Conditions of approval must be met and can be found in the approval for the short subdivision located in File No. PLN20160025 inthe City of Edmonds Planning Division." ii. Indicate the locations of all new easements, and provide easement descriptions and maintenance provisions for all new easements. iii. If setbacks are to be included on the plat, confirm that setbacks are shown consistently with Section II.E.3 of this report and add the following 218tr Street SV/ Two-Lot Short Plat File No. PLN20160025 Page 10 of12 statement to the face of the plat: "Setbacks shown are for reference only and vest no right." iv. Indicate the gross and net areas ofeach lot on the final plat. v. Include on the plat all required information, including owner's certification, hold harmless agreement, Development Services and Public Works director's approval blocks. c. The existing houses on the subject property must be demolished prior to the short subdivision being finaled. d. Make sure all documents to be recorded meet the Snohomish County Auditor's requirements for recording. 4. Submit an updated copy of the title report (short plat certificate) with the documents proposed to be recorded. The title report must be prepared within 30 days of submittal for final review. 5. Submit two copies of the documents to be recorded for the Planning Division and Engineering Division's approval. Once approved, the documents must be recorded with the Snohomish County Auditor's office. 6. After recording the plat, the applicant must complete the following: a. Complete the Engineering Division conditions listed "Required as a Condition of Building Permit" in Attachment 10. IV. APPEAL Pursuant to ECDC 20.07 .004, a party of record may submit a written appeal of a Type II decision within 14 days after the date of issuance of the decision. The appeal would be heard at an open record public hearing before the Hearing Examiner according to the requirements of ECDC Chapter 20.06 and Section 20.07.004. v.LAPSE OF APPROVAL Section 20.75.100.8 states, "Approval of a short plat shall expire and have no further validity at the end of seven years if preliminary short plat approval is issued on or before December 31,2013, and five years if preliminary short plat approval is issued on or after January 1,2014, unless the applicant has acquired final short plat approval within the specified time period." Since preliminary approval has been after January 1, 2014, this preliminary short plat approval shall be valid for five years from the date of this staff report. VI. NOTICE TO COUNTY ASSESSOR The property owner may, as a result of the decision rendered by the staff, request a change in the valuation of the property by the Snohomish County Assessor's Office. 218û Street SV/ Two-Lot Short Plat File No. PLN20160025 Page ll of12 Vil. PARTIES OF RECORI) Citv of Edmonds 12í -5th Avenue North Edmonds, WA 98020 vrII. Select Homes Kavla Clark 16*113th Avenue West, Suite Al07 Lynnwood, WA 98037 Patrick Gearin 8830 - 218th Street SW Edmonds, WA 98026 ATTACHMENTS l. Land Use Application 2. Applicant Cover Letter 3. Preliminary Short Plat Map 4. Preliminary Development Plans 5. Preliminary Drainage Report 6. Edmonds Utility Consortium Form 7. Zoning and Vicinity Map 8. Critical Area Determination CR420160056 9. Snohomish County Fire District No. 1 Comments 1 0. Engineering Requirements 11. Public Notice Documentation l2.Patrick Gearin July 6, 2016Letter 218ü Street SW Two-Lot Short Plat File No. PLN20160025 Page 12 of 12 City of Edmonds Land Use Application oarc .Ç/zv/r; REc'oBv {l.¿^ pps .ß 2.Gaô * RECEIPT# D HE pSrenr D PB E ADB tr CC HEARING DATE FILE# PLA/IOIGÕOQ5ZONE ! ARCHITECTURAL DESIGN REVIEW tr COMPREHENSIVEPLANAMENDMENT ! CONDITIONAL USE PERMIT ! HOMEOCCUPATION I FORMAL Su¡plvrsroN tr SHORT SUBDIVISION N LOTLTNEADJUSTMENT ! PLANNEDRESIDENTIALDEVELOPMENT ! OFFICIAL STREET MAP AMENDMENT ! STRTETVACATION ! RXZONE ! SHORELINE PERMIT tr VARIANCE / REASONABLE USE EXCEPTION D OTHER: . PLEASE NOTE THAT ALL INFORMATION CONTAINED WITHIN THE APPLICATION IS A PUBLIC RECORD ' pRopERryADDRESSoRLocrrroN sT?¡ a*Å 18zz ztt* sL. sr^r ãd^o^Ås lltlZÇ PROJECT NAME (IF APPLICABLE) PROPERTY OWNER Pnoxe# Y.L3.+L+L - Lo¿t4 ADDRESS 3+ FAX#qLç - +Ll?.. çorL TAXACCOUNT * 1ÃOq406O t 4ôc,sec.30 rwr.% p*o 01 DESCRIPTION OF PROJECT OR PROPOSED USE (A COVER LETTER AS NECESSARY) HOW THE PROJECT ABLE (ATTACH COVER LETTER AS NECESSAR APPLICANT PHONE#4z<-7lz-Loqq ADDRESS E-MAIL l¿-a¿Ía. Cla,zk (Q o'*tøak. ea,*,FAX# 4t-Ç, - +qZ- So fz CONTACT PERSON/.dGENT * 7nu'7c,3'39.9 ADDRESS lt^(31 L"h þilt ù').81c. AlO4 Lu hvtdood htt 1 g,o3 +I rrx* t{LS.*{L. Sof TE-MAIL The undersigned applicant, and his/her/its heirs, and assigns, in consideration on the processing of the application agrees to release, indemniflr, defend and hold the City of Edmonds harmless from any and all damages, including reasonable attomey's fees, arising from any action or infraction based in whole or part upon false, misleading, inaccurate or incomplete information fumished by the applicant, his/her/its agents or employees. By my signature, I certifu that the information and exhibits herewith submitted are true and correct to the best of my knowledge and that I am authorized to file this application on the behalfofthe owner as listed below. SIGNATURE OF APPLICANT/AGENT DATE P Owner's L CL <în¿f certify under the penalty of perjury under the laws of the State of that'thd ls a rrue correct statement: I have authorized the above ApplicanlAgent to apply for the sr-rbject use application, and grant my permission for the public officials and the staffofthe City ofEdrnonds to enter the subject property for the purposes of inspection and posting attendant to this application. SIGNATURE OF OWNER < t zq ltt" Questions? Call (425) 771-0220. DATE Revised on 8'22/12 B - Land Use Application Page I of I Attachment 1 Select Homes &Eeëf þfur;, May ll,2016 itAy 24 PLEMVWç 20t6 DFnr'City of Edmonds rzt 5ú Ave N Edmonds, WA 98020 RE: 8820 and8822 218ú Street SW,2 Lot Short Plat-ProjectNarrative To Whom It May Concern: This narrative and accompanying short plat map and report are being submitted to you to address how our proposed short plat meets the criteria of the Edmonds Community Development Code and Comprehensive Plan. The current owner of this properly is L'r n d a Ge rvte n The project consists oftax parcel 27043000201700. The site addresses for the project consists of: 8820 and 8822 21 8d' St. SW., Edmonds, WA 98026. The property is 24,572 square feet or 0.56 acres. The current zoning of the property is RS-8. The minimum allowable lot width for property with a RS-8 zone is 70 feet. Our proposed development meets this criterion. 8820 and 8822 2l8th Street SW, 2 Lot short plat is being proposed as a 2 lot short subdivision. Lot access will be off of 218ft Street SW. The project will be developed in one phase. Two single family residences and a shed are currently on the property and are to be removed. There are no critical areas within the project boundary. Than you for reviewing this project and please let me know if you have any questions or comments. Sincerely, f^,.//-Wr- Kayla Clark Project Coordinator Select Homes, Inc. kayla. clark@outlook.com Office: 425.742.6044 16b31 l3thAvenueWesl,SuiteAlOZ Lynnwood,Washington 98037 phort:425.742.6044 fü425.7425082 www,selecthornesuí.cornAttachment 2 Attachment 3 Attachment 3 Attachment 4 Attachment 4 Attachment 4 Select Homes 8820 218th St. SW 2-Lotshort Plat 8820 218tn Street SW Edmonds, WA 98026 Storm Drainage Report Prepared for: Select Homes Date: \llay 23,2016 Revised: October 6, 2016 LO/6/201-6 Prepared by: Rob Long, PE RAM EnEineering, lnc. 16531 13th Ave W, Suite A108, Lynnwood WA 98037 (425) 678-6960 RAMengineeringinc.com RHSUffi rict' 0? 2Û1ri tU lLr¡lr\iG Ð EPARTMåN''ClïY Otr ÉÐÀ4Otì¡$S ß of 36508 Job No. 16-011 Attachment 5 Select Homes 8820 278th $. SW 2-Lot Short Plot 8820/8822 218th Street SW Edmonds, WA 98026 lntroduction: This summary report provides site design information for a single family 2-lot short plat by Select Homes. This report includes storm drainage analysis to support permit review and approval. The property is located on the south side of 218th St SW and west of 88th Ave W, in the northwest L/4 of Section 3O,T 27 N, R 4 E, W.M. Applicant:Site Address: 8820/8822 218th Street SW Edmonds, WA 98026 Tox Porcel N umbe r: 27O43O-OO2-017-00 Select Homes L6513 1-3th Ave W, Suite 4108, Lynnwood WA 98037 Contact: Kayla Clark (42s)742-6044 PAGES TABLE OF CONTENTS SECTION A. Project Summary B. Parcel(Vicinity)Map C. Site Development Plans.. D. Aerial Photo E. Stormwater Control System Summary and Calculations F. Drainage Basin Description and Maps G. Grading & Erosion Control Summary and Soils Map '. H. Operation and Maintenance Guidelines............'.......' 5 1 t ..3 t4 3 5 4 RAM Engineering, lnc. Final Engineering and Drainage Report RAM No. 16-011 Se/ecf Homes 8820 218th Sf. St4/ 2-Lot Sho¡l PIat October 6, 2016 Page i Attachment 5 A. PROJECT SUMMARY: This report provides engineering information for the proposed construction of a 2-lot single family residence short plat; the project is located on the north side of 2l-8th St SW and east of 88th Ave W (8g20/8822 2L8th St SW) in the City of Edmonds. The applicant, Select Homes proposes to remove the existing residences and construct two single family residence on the site. This report provides the evaluation for the proposed 2-lot short plat. ExistÍng Conditions. The total site consists of about 24,572 sf (0.56 acres) and is currently occupied by an existing single family residence with an access drive of 2L8th St SW. The existing houses are surrounded by open grass lawn area and has scattered trees distributed around the site. Access to the site is via a shared access driveway/easement of 218th St SW; the site is completely surrounded by single family residences to the north, east, south and west (see attached aerial photo- section D). The site generally slopes in a northerly direction with slopes ranging lrom 2o/o to 8o/o. A majority of the site's drainage runoff would sheet flow northerly direction and collect in a catch basin and pipe system located within the private shared access driveway to the site. Minor drainage sheet flow from existing residential properties to the south may flow onto the site. No stream or wetlands were discovered on or immediately adjacent to the site. Additional discussion of the local drainage basin and downstream path is discussed in section F of this report. Developed Conditions. The proposed project includes the construction two single residence and associated driveway and utilities. Both lots will utilize the existing private shared driveway off of 218th ST SW for access. All existing structures and impervious surface onsite will be removed/replaced with the site development; landscaping and grass lawn around the new residence will stabilize the site upon building construction. New infrastructure improvements include a stormwater conveyance and a joint stormwater detention system; water; sewer; power; and communications. Due to the existing till soils of the site no infiltration or low impact development technique are proposed to be used to provide storm drainage flow control. All disturbed pervious (lawn and landscape) areas will preserve or restore the health and water-holding capacity of the soils by compost-amending (Per DOE BMP T5.13: Post- Construction Soil Quolity ond Depthl. To control the stormwater runoff a manifold detention pipe system will be installed; all roof drains shall be routed to the proposed detention pipe. Due to the fact a majority of the impervious surface is the roof top area with limited pollution generating driveway area (less than 5,000 sf) no water quality treatment system will be provided. A full overview of the proposed storm drainage control facilities, offsite/downstream analysis and grading and erosion control measures are discussed in the following sections of this report. RAM Engineering, lnc. Final Engineering and Drainage Report RAM No. 16-011 Se/ecf Homes 8820 21Ùth Sf. St4/ 2-Lot Shoft Plat October 6, 2016 Page A-1 Attachment 5 Summary of Minimum Reguirements for Small Site Proiects: 5.7 Small Site MinÍmum Requirement #7 - Preparation ol Stormwøter Site Plan The proposed site development cons¡sts of disturbing about 0.56 acres of land and creating/replacing about 9,000 sf (4,500 sf per lot) of impervious surface. Thus, the project is classified as a Small Site- Category 2 project per the City's classification system (see attached Site Classificotion Worksheef). The civilsite development plans have been prepared and reduced copies of the plans are included in section C of this report. 5.2 Smoll Site Minimum Requirement #2 - Construction Stormwater Pollution Preventíon A construction Stormwater Pollution Prevention Plan (SWPPP) has be incorporated into the site development plans. A summary of the site's erosion control measures that evaluates the typical 13 elements of a SWPPP are included in section G. The total site disturbance area of the project is less than one acre, thus a formal Notice of tntent application for NPDES coverage will not be made to the Department of Ecology. The grading quantities are estimated to be 300 CY of cut and 300 CY of fill. 5.3 Smøll Site MÍnimum Reguírement #3 - Source Control of Pollution Specific source controls are not required for single family residential sites. General requirements for these sites include preventing the discharge of pollutants to the City's storm drainage system per Edmonds City Code Chapter 7.2O0 (lllicit Discharges). This includes common household items such as pesticides, herbicides, fertilizers, detergents and fluids from vehicle maintenance. 5.4 Smalt Site MÍnimum Requirement #4 - Preservøtion ol Natural Drainage Systems and Outfalls A majority of the runoff leaves the site as sheet flow in a northerly direction. Site runoff enters an existing catch basins along the south side of 218th St SW via an existing storm drainage pipe system within the private shared access driveway to the site. The proposed detention system will discharge to the existing 12" storm pipe under the shared access driveway along 218th St SW, thus maintaining the existing drainage flow path. The site is located in the Westgate Pond watershed basin and eventually discharge to the Puget Sound (via Shell Creek) per the City of Edmonds maps (see section F). The proposed development will maintain the stormwater flow discharges to the Westgate Pond watershed basin. 5.5 Smoll Site Minimum Requirement #5 - Onsite Stormwater Management. The developed site conditions include impervious surface roof top, driveway and walkway/patio areas for the proposed residences. All rooftop and exterior area collection drains shall convey stormwater run-off to the on-site detention pipe system. Due to the underlying dense till soils found onsite, no LID or infiltration type stormwater management systems will be used onsite. An underground detention pipe system sized for a "small site category 2" development per the City's drainage manual will be provided to RAM Engineering, lnc. Final Engineering and Drainage Report RAM No. 16-011 Se/ecf Homes 8820 21Ùth Sf. St// 2-Lot Shot-t PIat October 6, 2016 Page A-2 Attachment 5 control stormwater quant¡ty control. See civil site development plans and section E for additional sizing calculations and construction details. 5.6 Smatt Site Minimum Requirement #6 - Runoff Treotment. The project does not propose to create/replace more than 5,000 sf of pollution-generation impervious surface onsite. The project will create about 3,750 sf pollution generation impervious surfaces; a majority of the site's impervious surface is rooftop and walkway/patio areas (non-pollution generation surfaces). Thus, no basic or enhanced water quality treatment system is required. The site's stormwater control system will include a sump and a control tee that will provide some water quality and oil/water separation of the collected runoff. 5.7 Smatt Site Minimum Requirement #7 - Flow Control. An onsite storm detention manifold pipe system will provide flow control of the site's stormwater runoff. The detention pipe system has been design to meet the flow control standards of a Small Site- Category 2 project in a creek or lake basin (less than an acre of disturbance and between 5,000 sf and 10,000 sf of impervious surface). The detention tank has been sized using WWHM (9,300 sf) software; a full overview of the proposed storm drainage control facilities calculations is provided in section E. 5.8 Smatt Site Minimum Requirement #8 - Wetland Protection. No wetlands are known to exist on or adjacent to the site. 5.9 Smatl Site Minimum Requirement #9 - Operation ond Maintenance. An operation and maintenance summary is provided in section H. 5.70 Small Site Minimum Requirement #70 - Offsite Analysis and M¡tigat¡on. See section F. Droinage Basin Description ond Mopsfor a qualitative analysis. 5.77 Smatt Site Minimum Requirement #77 - Financîol Liobility. Cost estimates and bonds will be provided by the applicant during final construction permit approval. RAM Engineering, lnc. Final Engineering and Drainage Repoft RAM No. 16-011 Se/ecf Homes 8820 21Ùth Sf. Sl// 2-Lot Shorf Plat October 6, 2016 Page A-3 Attachment 5 City of Edmonds Site Classification Worksheet Page 1 of 2 Thc project's Site Classification will dictate thc specific stormç?ter management rcquircnrcnrs applicablc to your sitc. Completing this worksheet will telp detcnninc tlæ ¡mount of rcgulated inrpcrvious surface and wlæthcr your project falls into thc classific¡tion of a Small Sltc {Caregory I or Catcgory 2), or a }Ilnor Sltc. Please rcference thc Glossary (op. I 0- I I ). Fisures D and E. (pp. 8-91. and Er,anrples (pp. I l-12). to assist with conpletion of this worksheet' ¡f YI'IS, thc subjcct arca is to bc conside rcd impcrvious for initial site classification purposcs. lncludc total permeable pavcmcnt arca in the calculation of Non-Rcgulated. Re placcd and/or þ impervious surface ¡reas in the table bclow. Li¡gl; Identili the ;\*on-Rcgulnted lntpcrr ious Sr¡rfacc ,l¡r¿¡. !lgg]: t<tcnrify thc Rcplacd lnrpcrlious Surfice,trra, dividing thc total be'tween.þp!ond&¡gþ$g[; either orboth may bc zero. Notc: For pmjcct classilication purposcs. Rcpluccd lnrpen ious mty only bc considcrcd exe mpt undcr ccrt¡in conditions. Refcr to thc Glossary and Figurc D. !i¡g!: lclentity lhe \c¡r tntpcn'ious Sulf¡cc Årc:¡ for your project All irnpcrvious areas creatcd post-July 7, l9Tl o¡ afær thc datc of annexation into the City are egulated & should bc included in this tolal unlcss thcy can bc categor¡zed separalely as a Replaccd-Regulutcd area. !!g[: Enter the sum of thc lotal .&.Q!ggqd:Iþ!g!¡&C, plus the total !þg impervious areari. !i4g¡!: tthnrify thc totat arca currently mitigatcd by an existing city-approved stôrmw¡rlcr managenr:n¡ systcm. !!g¡[: Entcr thc sum of thc v¿¡læ in Linc 4 tcss thc valuc in Linc 5 to idcntily thc lotal Rcgulatcd ure¡ in rvhich stormwater controls havc not yct bæn applied. !ig!: ldenriff rhe rotal an:a proposrìd to bc mitigatcd through tÞ usc of Low lmpact ll'vclopnr:nt Tcchniqræs. !i¡g!: Idcnrilt thc rolal arca proposcd to be mitigatcd lhrough convcntion¡t Stormrvater Managerrnt Techniqtres. ** I'rorldc a copl'of thc follorrlng tal¡lc r¡n the dralnagc plån shcût for tlrc plrpotted proJcct {'* t 1c.g. ponxs asphdt pJHi (olrct!.. paver blælis, concrctc oprn ællctt paving grids. or plutic lattitrs lìl¡cd sith turf ü lltrl Ravised on -l¡ü5/2{}12 Ë72-SW\I-Erosion-Controt-o3-ü5.l2.doc Pay 5 of 12 on thls Slfc? 5.1 fl Ycs [X xul¡roposcd l'orl) Is Pcrmeablc to Storm*,atcr 2) Dctcrnlnc lhe i\nount and Typc of I'ltlstlng Él I'ropor*d Impcrrlous Surfacc for lhc Sltc 2 ond Cto Srcrnilleter l,lne Ttpc A¡l:n {sqüïrc f(r'|, t.l\on-Rcgulrled NONE Errmpl Rcsul¡lcd t Rcplacrd 0sF .l ¡. I Ncrr {Post 1977}I ÐÐÐ+tÐ+àÐ Tolnl ltcgulaled lmpcn'iotts .{rct hlùiøation reaaíred ifin ctcess of2000sl +9,300 sF 9,300 sF 6. Ibl¡l Ân'¡¡ i\Iirigatcd b.v Êtistilrg Slormwalcr l\llnagenlenl Syslcn{s} RrEulaled ..tma Nol I'et tllitigaled 0sF 9,300 sF 7 Àrcn Proposcd lo bc l\litigalcd tt¡ l.os lntpact Dcvclopmenl Techniques 0sF 8.Àrra I'ropos,ed lo bc l\tiligatcd lhro¡tgh Conrcnlionnl SlTtrl Technlqucs 9,300 sF RAM Engineering, lnc. Final Engineer¡ng and Drainage Reporf RAM No. 16-011 Se/ecf Homes 8820 211th Sú. St¡/ 2-Lot Short Plat October 6, 2016 Page A-4 Attachment 5 City of Edmonds Site Classification Worksheet Page 2 of 2 3) Deternrine the Total Area of Land Disturbing Activity 24,672 s¡r lo Sl1nn\'.lÍeï I 4) Determine the of l'lll and/or lixcavatlon CUT=300 CY FILL=300CY 5) \ryi[ the project convert 3/¡ Acre or More of Nltive Vegetntion to l,arvn or fl ves Xl NoArca? 6) klentify the Watershed the Existing Site Runoff Discharges to to S!oïnntvler cnt(fit 2.3 Bnsecl on Sitc Location antl Watershcd Ma¡: - Figurc-C, Chcck all that nP¡¡ly. A. f] Dircct Dischcrgc B. ffi Creck ol l,akc Basin n EdmuntJs vúny Basin Westgate Pond tr Puget Sound Basin g Pugct Sound Pi¡red llasin Rerisnl nn ,VASQ0l2 h7 2-5ll' M -Í)t¡.si¡¡n -(itnt rcl - 0.|.05. I ?thtc Paga (r of' 12 DËTT]RM IN I] PROJ ECT CLAS.S II;ICATION US ING TH E I NFORM ATION A BOVI] ANDTHE PRO.IECT CLASSIFICATION CHART (Fisure B, ps 4) * Sm¡lll Slte - Cntegoty I Storntvil e r S u¡tpl e m en t Chu¡tte:r 5 flSmall Site - Category 2 Sta nnli.'ilte ï Sup¡tle ua rrt Clrupter 5 Minor Site Sto niltete r Su ¡t¡tl a nett t Chu¡tter 6 RAM Engineering, lnc. Final Engineering and Drainage Repoft RAM No. 16-011 Se/ecf Homes 8820 21Ùth Sf. Sl4/ 2-Lot Shorf Plat October 6, 2016 Page A-5 Attachment 5 B. PARCEL (VlClNlrY) MAP Ê!¡4Eq ; scÎ]Õ Ì ttrr¡sHPflwsr i30 27 8¡!!êç !]!!4 'ñry1nolry - O!r(Ë TÊ¡d ; ; ocÉ.Ld --'--' væÊow ---- lfin -. '.' Eıeæ¡t i : OlhûSsbdiv - VacLd sr.$w : 5-à - t{w Caúodm Gwl-d _* t Eorl4¡te¡ - tot _. Blodl _ s6iof, i,r rl3 t? c,¡ û6 3 6 i I I I I I L F 4 - : , tñ= )Mlæt thr rrÁ..rt ø t.t¡úrt tt, lat 1 +ît\ SW-í9-t{¡¡l 5W3ó-274¡ .t t,o¿..t Òt ¡h. .t $añ" .rlJì..sÀd.t tr'ilr., ttL.Ìt qrd fs1 75¡ PH' :l: tç 05 å?r_al!tia] t3 ( c( t1í 5 03 IH PL t8 I ; i II I i I I I I j i + tl t0 L t s1v .,.-- .-,.- ú Iî,I I d¡z r ó, l i ¡! 4 1 07e -0r 1,ó15 ,F ¡0 I 6 3 2 1 10733 10 rì t5 'r.l ù7 3 2 '07 5 OJ '" {iâ- t3lo l r 1.t t7 lı t! 06 16 la f0 1{ t3 {,8 03 t2 73 03 /101;01 n?8r0r 0t/l s1' ',4, o'l .,¡ll räl:l¡lo I 17 ¿ 1l 3 14 1 l6 04 OB02 ó3 tl l0 tI s lttó t 6 5 I 2I! t-_ã, l=l cVj'o t1 12 CRtl 5lt¡t5 ) tı äi"Ël áYì 1 ı 1 2 5 I TFSCÍS 1t t3 0t l¡15 16 t7 4l 03 I02 6 7 8 03 02 I 7 I 3 4 I rl3 a2 01 2{ 2 17 ! 4ltJ6 t'1 ÉI 3 ı l1 13 ,t2 9 6 !I !0 ,Dut ).t t1 5 :F ó! Ê 6 e¡i scï -t:Ê': i'1 ! 12 ¡13 ¡t6 I 2t1 01t! '{t2 Ì1 tJ 4 R 5 ¡f IE7¡ 1 1 a I' ¡ra 2 t3 tt ¡0 I 6ÊI ?0 cI t6 17 1E rû tt 7 2-û53 2-û53 3 01 00 0t 6 25 ?-o7q ?.03ç 7.Ð78 3 1 .,*'i.;' 2 002 ?.1{1¿ 2.û03 ã.c09 2.0ûÈ..: ITE 01 t 5 { 3 7 I 10 t1 { ? {l:1 2-Ct 3 ?.ð10 , 2 Á ¡ { 2.028 6 2 ? û:r31 Ia l2 e! r9 lt fìo . Âò''- 1l' 2-074 2 t)Zt\ 2-ûò3 6 3.C71 t 2 I ?-Í72 , 5 I 7 I 1. O1l l_lt f trJl 6 Iti I t1 t6 o: 0¡ 1 ?: (!4 ¿ 5 6 I 020 f,070 1.0?1 i 02û l.uza 1.t]21 7 ll tô 4-dr3 i 311 ¡azç3'2 c0:.. 03 lt :ö7 0f : ol'" a2' ' Page B-1 HÀIJI RAM Engineer¡ng, lnc. Final Engineering and Drainage Report RAM No. 16-011 Se/ecf Homes 8820 21Ùth Sf. St¡/ 2-Lot Shoñ Plat October 6, 2016 Attachment 5 C. SITE DEVELOPMENT PLANS ts s I !: IÈ iti ¡r¡ Elll flËl lr È: il :e" :' q1ì: --------....*'¿AA tS HtCtA. Oæetvr¿ JfloHî aa !,a Htgrz ii', __-!iti " Il¡¡!ËiËi,i ll .., illllil¡r,r J ti 4 ft l¡¡Ëi¡lt ¡lìl{ :; , ::': ¡¡ ìT.l lÌ:l ìi " ? * z ã, E tts rãt¡ a" ¡å rr: #t¡ ilrl:á!itrit tii:t¡t! lliilr Ètå3¡i. ËlÌ!¡Ír i¡lch! åiiiå! ildî*;tl*ii¡ ?! TEt¡ !t:t tlåiËl¡l¡lii¡l¡, ¡t!ä ¡t [l ,¡,:¡lÈ.' iliiiilii¡ iiåtiiii¡i liåiiiiiii i!Ëi?$îii¡ È:;::i "' Ii.l u¡tr;t;¡ ÈÍ iåi¡ Ft¡ll! Eltå¡i ülãi ilr¡lIr lll € nt ^vtuct ¡! :it! :!!lrl l.r(ìl{ ].tro3 tÈÈ àËH hËF HstFSstttrrfi N tl q €bI i"¡ ïii iiË rå Èt !l RAM Engineering, lnc. Final Engineering and Drainage Reporf RAM No. 16-011 Se/ecf Homes 8820 21Ùth Sf. St4/ 2-Lot Short Plat October 6, 2016 Page C-l Attachment 5 z - c o 6 e d 9 L ) Z ' 9 r e q o l c o l e d u o t l s l o l - z / i 4 s t s t i l g L z 0 z g 8 s a w o H r c a l a s u o d o a a 6 e u r e r o o r , ; , : , 1 ; 3 ! r , r T f r Y i t ' c u ¡ ' 5 u u e e u þ W W V A - s ù ¡ ã I â $ i i i ¡ l 2 t a 7 H t Í E f l E r ø ß f P L 7 w æ f f i \ t { s ì t â I H ì c ) { ( r ¡ Ì o I I I F L I b s t g t t t a w u i l ¡ å l i r l I : : Ð r ¡ ! i í l F i ¡ i i l l ¡ l ¡ i r r : ¡ ! i ! ¡ * " ; F i T r ; ! i ! å l t : i r : ¡ ; ¡ ! ! r i ¡ ¡ i t ¡ ! i l i ¡ È i ¡ f i ¡ i i i f ¡ ¡ ì l ! ! i i i i ¡ i i i i i i i t i i r r L ; ' ! ! i t Ë å Í l E , ' ¡ E f l l r È 3 l E r i l Ë ! l ! É l & ¡ i , , , , , ¡ , t : i f i i l l r ¡ € ! . l l t ¡ i : * l : l a ¡ l 3 l i ' i r l ¡ ¡ n t ¿ Ë i T i i i É l ¡ ' i H : F i ¡ r å l l ¡ t i ¡ I t : ; 5 : ¡ l ! ¡ { ¡ l i È t ¡ t ì Ë ¡ . : ; l r I E I I å i t l t i I å i : : i . , ¡ r B È T ô ¡ r Ì Ì ; 6 . - Þ ¡ i : I l . ü i l : - l ¡ i : l ì : q ¡ à ; Ì ! " " ; r l l l t ¡ l l l I ¡ | i I E I l ! Ë i l i l " l { È ( r - I I 1 - - l t ì l , , ' ' i ' t l , A t t a c h m e n t 5 ! o åtvt¿ .Iuolts t8 LS Hlgrz _*-..--ru .ì linl e;:l t;: !Àhå fi : :i,,È¡ ii ;; i:¡: ::: t:ir!:: ,.:¿ i Íl :l :: :t lì '! :l È ¡a , t. i ti :l l : RAM Engineering, lnc. Final Engineering and Drainage Report RAM No. 16-011 Se/ecf Homes 8820 218th Sf. St// 2-Lot Short PIat October 6,2016 Page C-3 Attachment 5 D. AERIAL PHOTO RAM Engineering, lnc. Final Engineering and Drainage Report RAM No. 16-011 Se/ecf Homes 8820 21Ùth Sf. St4/ 2-Lot Shott Plat October 6, 2016 Page D-1 Attachment 5 E. STORMWATER CONTROL SYSTEM SUMMARY AND CALCULATIONS The project proposes to create and/or replace approximately 9,300 sf of impervious surface (Lot 1- 4,000 sf + Lot 2- 4,OOO sf + 300 Shared Access Driveway). To mitigate the development of the site, an underground detention tank system will be installed along the west boundary of the site to control the drainage runoff (flow control). All of the on-site impervious surfaces shall be collected and routed to the on-site detention ta nk. The stormwater control detention tank has been sized per Toble 5-3 City of Edmonds Flow Control Requirements for Smotl Site Projects- Creek or Loke Basins in the Edmo nds Stormwater Code Supplement (April 2010). Per Table 5-3, continuous hydrologic modeling with MGS precipitation data (WWHM 2OOL2) shall be used to model the detention tank system. Project Areo Summory: Total Site Area = 24,572 sf Proposed lmpervious = 9,300 sf (Lot L- 4,000 sf + Lot 2- 4,OOO sf + 300 Shared Access Driveway) lJnderground Detention Tønk Sizing: The detention tank system has been sized for the proposed 9,300 sf (0.214 ac.) of impervious surfaces using WWHM2012 continuous hydrologic modeling. Per Table 5-3 in lhe Edmonds Stormwater Code Supplementthe following flow control standards are required for a Small Site project located within a creek basin: >5,000 sf Iffeclh'r hnpelrlollr å¡'en For det*uûo¡r BñtPs: ?-year: 0.07 cfdacre irupen'iors. l0-year = 0.14 cflacrc irnpenious. and 100-year = 0.33 cf$acre im¡xn'ious. fufilt¡ntion Bil{Ps: 3-year = 0.0? cf*incre i¡¡pen'iots. l0-year = 0.31 100-year= 0.45 cfl¡c¡e cfs/acrc irnpenious.aud Nerr and replaced inrpertiorrs snrface Sir¡plified Sizilg .{pproacù or conliluous hydrologic modelilg with NÍGS precipitation data ''o 2-Year Allowable Release Rate = 0.07 cfs/acre-impervious x0.21.4 acres = 0.0L5 cfs L0-Year Allowable Release Rate = 0.14 cfs/acre-impervious x0.21.4 acres = 0.030 cfs LOO-Year Allowable Release Rate = 0.33 cfs/acre-impervious xO.2L4 acres = 0.070 cfs RAM Engineering, lnc. Final Engineering and Drainage Report RAM No. 16-011 Se/ecf Homes 8820 21Ùth Sf. St4/ 2-Lot Short Plat October 6, 2016 Page E-1 Attachment 5 The developed runoff rates and storage calculations were performed using the DOE 2012 Western Washington Hydrology Model (WWHM20L2) continuous runoff model. The required detention system and release rates for the developed conditions are as follows: Proposed Detention Tank: 727 ft - 36" Diameter Pipe with 5/8' (0.625') orifice. Release Rates: Storm Event Mitisated AI lowable 2-Year = 10-year = 100-year = 0.015 cfs 0.030 cfs 0.069 ¿fs Cumulelive Probabilt! 0.01-5 cfs 0.030 cfs 0.070 cfs FrcquGncy 0.1 0.0t ++ *0.r o801* 0.0148 - O,0229- O,O3O3- O,O127 - 0.O546 - O.O692 ¡*Yêår Ycar atb IÕtr ++i +4*+ ++ Year Yeår Year 0.01 1902 1903 1904 1905 1906 190? 1908 1909 1910 1911t9t2 1913 1914 1915 1916 1,9r7 1918 1919 1920 t92L 1922 L923 '-9241925 t926 1927 1928 1929 ¿ "' Yêår + + ++s Peå¡€ + . 0150 ,oL27 .0149 . o133 , 0118 .o117 . o13ô . o136 .0163 . o131 0 o o o 0 0 0 0 o 0 0 0 o o 0 0 0 o 0.5 1 2 5 10 20 30 50 70 80 90 95 98 999S.5 LID Dualion Flow LID Anoþo datarelr CornpætWDM I DeUesctcte¿ 36 lfllt Tü* t SIAßE Mil¡eöted A¡Odæels Flood Frcq¡erry MÊilþd aâ Log Pe¡sanlypc lll 178f ldcit lf' Cunsref Grirgolar See WWHM2012 printout on the following pages. Skcåm o1?o flðt . 013¡ . o153.o'-t2 .0140 . 01a0 . 0142 ,oL24 o , 0133 o, 0128 o ,0146 0 , o1{2 o.ot24 0 .0115 0 . o13? {l . O13¡t 0,0130 : .:1:1 FÛC 1Fh¡, + 801 RAM EngineerÌng, lnc. Final Engineering and Drainage Report RAM No. 16-011 Se/ecf Homes 8820 21Ùth Sf. SW 2-Lot Sho¡t Plat October 6, 2016 Page E-2 Attachment 5 WW H M 2012 I n p ut/O utp ut Dato : Project Narne: 16-011 Short Pfat Site Name: 218th South Site Address:city : Report Date: 70/6/20L6 MGS Regoin : Puget East Data Start : 1901'/1'0/1' Data End z 2058/09/30 DOT Dala Number: 03 Version Date: 20L6/02/25 Version : 4.2.1-2 Low FJ.ow Threshold for POC 1 : H5-gh FIow Threshold for POC 1: 50 Percent of the 2 Year 50 year PREDEVELOPED I,AND USE Name : Basin 1 Blpass: No Groundl'ilater: No Perwious Land Use C, Lawn, Mod Perwious Total Imperwious Land Use Impervious Total- Basin Total acre acre .2L4 0.2L4 0 o.2L4 Element Flows To Surface Interflow Groundwater MITIGATED I,AND USE Name : Basin 1 Blpass: No Groundl'ilater: No Pervious Land Use Pervious Total I Land Use ROOF TOPS FI,AT DRIVEVÍAYS FI,AT STDEVÍALKS FI,AT Impervious Total Basin Tota]- acre acre 0 0.L23 0 .087 0 .0040.2t4 0.2L4 Page E-3 RAM Engineer¡ng, lnc. Final Engineering and Drainage Repoñ RAM No. 16-011 Se/ecf Homes 8820 21Ùth Sf. St4/ 2-Lot Shotf PIat October 6, 2016 Attachment 5 Element Flows To: Surface Tank 1 Interflow Tank 1 Groundwater Name : Tank 1 Tank Name: Tank 1 Di¡nensionsDepth: 3 ft. Tank Ty¡pe : Circular Diameter : 3 ft. Length z 127 ft. Discharge Structure Riser Height: 2.9 ft. Riser Diameter: 6 in. Orifice 1 Diameter: 0.625 in. ElevaÈi.on: 0 ft Element Flows To OutleÈ 1 Outlet 2 Tank Hydraulic Table Staqe(fee!) Àrea(ac.) Volume(ac-ft.) D!@ 100.00 0.000 0.000 0.000 0.000 L00.03 0.001 0.000 0.001 0.000 l-00.07 0 .002 0. 000 0.002 0.000 l-00. 10 0 .003 0.000 0.003 0.000 100. 13 0.003 0.000 0.003 0.000 t-00.17 0.004 0.000 0.004 0.000 100.20 0.004 0.000 0.004 0.000 1-00.23 0 .004 0 .000 0.005 0 .000 1"00.27 0.005 0.000 0.005 0.000 1"00.30 0.005 0.001- 0.005 0.000 l-00. 33 0.00s 0.00L 0.006 0.000 100.37 0.005 0.001- 0.006 0.000 100. 40 0.005 0.001 0 .006 0 .000 r-00.43 0.006 0 .001- 0.007 0.000 L00 .47 0 .006 0. 002 0.007 0.000 100.50 0.006 0.002 0.007 0.000 100.53 0.006 0 -002 0.007 0.000 100.57 0.006 0.002 0 .008 0 .000 100. 60 0.007 0 .002 0.008 0.000 100. 63 0.007 0.003 0.008 0.000 100. 67 0 .007 0.003 0.008 0.000 l-00.70 0.007 0.003 0.008 0.000 100.73 0 .007 0.003 0 .009 0 .000 100.77 0.007 0.004 0.009 0.000 l-00. 80 0.007 0.004 0.009 0.000 100. B3 0.007 0.004 0.009 0.000 100. 87 0 .007 0.004 0.009 0.000 100.90 0.008 0.005 0.010 0.000 t-00. 93 0 .008 0.005 0 .010 0 .000 1-00. 97 0.008 0.005 0 .010 0.000 r-01. 00 0.008 0.006 0.010 0.000 101-. 03 0.008 0.006 0.010 0.000 101. 07 0 .008 0 .006 0.010 0.000 101.10 0.008 0.006 0.01L 0.000 101. l-3 0.008 0.007 0.011 0.000 RAMEngineering, lnc. Final Engineering and Drainage Report RAM No. 16-011 Se/ecf Homes 8820 21Ùth Sf. St4/ 2-Lot Short Plat October 6, 2016 Page E-4 Attachment 5 0.000 0.000 011 011 011 011 0t2 012 0L2 0t2 017 01" 7 017 017 017 0L7 0l-8 050 108 178 25L 0 0 0 0 0 0 0 0 0.007 0.007 0.008 0.008 0.008 0.008 0.009 0.009 0.009 0.01-0 0.010 0.010 0.010 0.011 0.011 0.011 0 .01"2 0 .0L2 o .0r20.0t2 0.013 0.013 0.013 0.014 0.014 0.014 0.014 0.015 0.0150.0ls 0.01s 0.016 0.01-6 0.016 0.017 0.01_7 0.017 0.01-7 0.01_7 0.01-8 0.018 0.018 0.0r_8 0.019 0.019 0.019 0.019 0.019 0.019 0 .020 0.020 0.020 0 .020 0 .020 0.020 0.020 0.000 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.007 0.007 0 .007 0.007 0.007 0.007 0.007 0.007 0.007 0.006 0.006 0.006 0.006 0.006 0.005 0 .005 0.005 0.005 0.005 0.004 0.004 0.004 0.003 0.003 0.002 0.001 0.000 0.000 101.17 L0L.20 L0L.23 L0L.21 101.30 101.33 101_.37 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0-000 0.000 0.000 0.000 0.000 0.000 0.000 40 43 47 50 53 0.0L2 0.0L2 0.01-3 0.013 0.013 0.013 0.01-3 L01. 10L. 101. l-01. r_01. 101. 10L. l-01. 101 . 101 . L01. l_0L. r_01. l-01. l-01. r01. 101. 10L. r02.r02. 0.000 0.000 0.000 0.000 LO2 .01 L02 . L0 L02.13 r02.L7 L02.20 L02.23 r02.27 L02.30 L02.33 L02.31 L02 .40 L02 .43 t02 .47 102. s0 LO2 .53 L02 .57 L02 .60 !02 .63 L02 .67 L02.70 L02.13 .01-3 .013 .0L4 .014 .014 .014 .014 .01_4 .014 .01-4 .01_5 .015 .015 .015 .015 .015 .015 .015 .016 .0r_6 . 016 .016 .016 .0L6 .01-6 .016 .016 . 017 .0L1 .017 .017 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 57 60 63 67 70 73 77 80 83 87 90 93 97 00 03 0.000L02.71 102.80 t02 .90 L02 .93 r_03.00 103.03 to2 .81 r_02.83 L02 .97 RAIW Engineering, lnc. Final Engineering and Drainage Report RAM No. 16-011 Se/ecf Homes 8820 218th Sf. St4/ 2-Lot Shott Plat October 6,2016 Page E-5 Attachment 5 AIiTATYSIS RESULTS Stream Protection Ðuration Predeveloped Landuse Totals for POC *1 Tota1 Perwious Area:O.2tA Total Impervious Area:0 Mitigated Landuse Totals for POC #1 Total Perwious Area:0 TotaJ- Imperwious .Axea :O.2LA Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow (cfs) 2 year 5 year 10 year 25 year 50 year 100 year Flor'r Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 0.008119 0.016368 0.024919 0.040698 o .05'7 21-9 0.0'790r2 2 year 5 year 10 year 25 year 50 year 100 year 0.014802 0.022901 0.030344 0.042'724 0.054588 0 .0691"7 9 Stream Protection Duration Annual Peaks for Predeweloped and Mitigated Year PrêdeveloPed Mitigated t902 0.007 0.015 1903 0.004 0.013 1-904 0.026 0.01s l-905 0.005 0.0131906 0.003 0.012 l-907 0.012 0.018 r_908 0.005 0.014 1909 0.006 0.01"4 1 910 0.015 0.016 t9LL 0 .008 0. 013 L912 0 .064 0. 0171913 0 .008 0.013 19L4 0.063 0.0L5 l-9L5 0.004 0.01l- 1_91_6 0.006 0.0141,9L7 0.003 0.014 1918 0.005 0.014 L9t9 0.005 0.0L2 t920 0.009 0.013L921 0 .006 0.013 L922 0.0L2 0.015 1-923 0.007 0.0141924 0.004 0.012 L925 0.004 0.011 POC #1 RAM Engineering, lnc. Final Engineer¡ng and Drainage Repoñ RAM No. 16-011 Se/ecf Homes 8820 21Ùth Sf. St4/ 2-Lot Short Plat October 6, 2016 Page E-6 Attachment 5 1926 L921 ]-928 L929 1930 r- 931 1"932 1933 l-934 l-935 1936 1_937 193 8 193 9 1_940 L94L L942 L943 L944 t-945 L946 19 47 L948 1"9 49 1950 l_951" t952 19 53 r954 l_955 l_956 1957 L958 l_959 19 60 19 61 L962 l-963 L964 L965 L966 L967 r-968 1,969 L97 0 197 r 1972 L97 3 L97 4 1-975 L91 6 L971 L97I L97 9 L980 1_981 ]-982 i_983 l_984 1985 l-986 1987 1988 1989 l_990 19 91 L992 .007 .006 .006 .0L2 .006 .006 .006 .007 .031 .00s .008 .019 .005 .004 .0L0 .005 .01-5 .008 .027 .006 . 010 .004.0t2 .0L2 .006 .007 .051 .04L .007 .004 .004 .006 .022 .01-5 .004 .0 44 .007 .004 .055 .020 0.014 0.013 0.013 0.013 0.016 0.013 0.014 0.01_4 0.013 0.01-7 0.017 0.015 0.079 0.049 0.013 0 .0L2 0.014 0.015 0 .027 0.014 0 .0r2 0 .032 0.014 0.017 0.046 0.016 0.011 0.015 0.014 0 .0L2 0.014 0 .0L2 0.015 0 .0L2 0.016 0.014 0.093 0.015 0.012 0.014 0.041 0.059 0.013 0.0L2 o .082 0.0L3 0 .0L2 0.010 04 L6 0 0 0 0 0 0 1 0 0 .0L2 0.0L2 0.015 0.013 0.015 0.043 0.01-8 0.016 0 .0t2 0 .022 0.013 0 .0L2 0.013 0 .020 0.01-5 0.013 0.015 0.01-6 0.015 07 05 L4 15 15 l-3 .01_3 .037 .024 .004 .018 .009 .014 .007 .005 .011 .009 .020 .006 .017 .006 .006 .007 .010 .0L1 RAM Engineering, lnc. Final Engineering and Drainage Repoft RAM No. 16-011 Se/ecf Homes 8820 21Ùth Sf. St4/ 2-Lot Short Plat October 6,2016 Page E-7 Attachment 5 L993 L994 19 95 t996 L99'1 19 98 1999 2000 2001" 2002 2003 2004 2005 2006 2007 2008 2009 20LO 20LI 20L2 20L3 20L4 20L5 20L6 20L'7 20L8 20L9 2020 202L 2022 2023 2024 2025 2026 2027 2028 2029 2030 203L 2032 2033 2034 2035 2036 2037 2038 2039 2040 204L 2042 2043 2044 2045 2046 2047 2048 2049 2050 205]- 2052 2053 2054 2055 2056 2057 2058 0.007 0.010 0.003 0.013 0.006 0.010 0.002 0.008 0.004 0.040 0"008 0.008 0.032 0.005 0.0L1 0.006 0.004 0.006 0.004 0.009 0.009 0.004 0.065 0.003 0.010 0.024 0.038 0.019 0.0L2 0.01-5 0.010 0.064 0.006 0.010 0.007 0.003 0.006 0.015 0.004 0.004 0.004 0.005 0.016 0.010 0.003 0.016 0.002 0.005 0.006 0.020 0.012 0.009 0.007 0.007 0.005 0.007 0.007 0.005 0.019 0.005 0"007 0.046 0.004 0.005 0.005 0.005 0.015 0.024 0.011- 0.01-6 0.013 0.016 0 .0]2 0.013 0.0L2 0.0L4 0.015 0.014 0.01-4 0.011_ 0.01_7 0.013 0.013 0.017 0.0L1 0.0s5 0.0t-3 0.0L2 0.015 0.011 0.097 0.043 0.090 0.013 0.01-5 0.0r_3 0.0r_3 0.01-6 0.013 0.0r_5 0.014 0.01-1 0.014 0.038 0.0L2 0.011 0.011 0.014 0.060 0.015 0.013 0.017 0.or2 0.01_4 0.01-4 0.06s 0.01_5 0.016 0.013 0.014 0.01_3 0.016 0.015 0.014 0.036 0.01-5 0.014 0 .021" 0 .01"2 0.013 0.0r_2 0.01_3 RAM Engineering, lnc. Final Engineering and Drainage Repoñ RAM No. 16-011 Se/ecú Homes 8820 218th Sf. SW 2-Lot Short Plat October 6,2016 Page E-8 Attachment 5 Stream Protection Duration Ranked Annua1 Peaks for PredeveJ.oped and Mitigated. Rank Predeveloped Mitigated 1 0 .1141 0.0971 2 0.0651 0.0929 3 0 .0641, 0.0900 4 0.0635 0.0819 5 0 .0632 0.0192 6 0.0555 0.0653'7 0.0510 0.0605 B 0.0460 0.0589 9 0 .0440 0.0s51 10 0.0409 0.0485 11 0.0398 0.0462 72 0.0382 0.0431 13 0.0370 0.0428 74 0.0321 0.0405 15 0.0315 0.0376 L6 0.0266 0.0361 1'7 0.0256 0.0324 18 O .0236 0 .021 4 19 0.0235 0.0241 20 0.0219 0.0222 2t 0.0204 0.0206 22 0.0204 0.0198 23 0.0195 0.0178 24 0.0194 0.01-1'7 25 0.0187 0.0170 26 0.0185 0.0170 27 0.0177 0.0169 28 0.0712 0.0168 29 0.01-61 0.0168 30 0.0159 0.0166 31 0.0155 0.0166 32 0.0152 0.0165 33 0.0152 0.0164 34 0.0151 0.0163 35 0.0149 0.0162 36 0.01-49 0.01-62 37 0.0145 0.0160 38 0.0141 0.0160 39 0.0136 0.0159 40 0.0133 0.0158 41 0.0131 0.01-56 42 0.0126 0.0155 43 0.0125 0.0155 44 0.012s 0.0155 45 0.0:-24 0.0154 46 0.0122 0.0153 47 0.0120 0.0153 48 0.0120 0.01-53 49 0.0115 0.0752 50 0.0114 0.0151 POC #1 RAM Engineering, lnc. Final Engineering and Drainage Repoft RAM No. 16-011 Se/ecf Homes 8820 21Ùth Sf. St4/ 2-Lot Short PIat October 6, 2016 Page E-9 Attachment 5 trlJA 52 53 54 55 56 57 58 59 60 6t 62 OJ 64 65 66 6'7 6B 69 70 7t 12 '73 14 AE lf) '71 1B 79 BO 81 B2 B3 B4 B5 B6 B'7 BB B9 90 91- 92 93 94 95 96 97 9B 99 100 101 r02 103 104 0 . 0113 0.0106 0.010s 0.0104 0.0102 0.0100 0.0099 0.0096 0.0096 0.0096 0.0095 0.0094 0.0094 0.0090 0.0089 0.0089 0.0088 0.0085 0.0085 0.0083 0.0082 0.0079 0.0078 0.0076 0.0075 0.0074 0.0073 0.0012 0.00'72 0.00't2 0.0071 0.0071 0.0070 0.0069 0.0068 0.0068 0.0067 0.0066 0.0066 0.0066 0.0065 0.0064 0.0064 0.0064 0.0063 0.0063 0.0063 0.0062 0.0061 0.0061 0.0061 0.0060 0.0059 0.0059 0.0151 0 . 0151 0.0150 0.0149 0.0149 0.0148 0.0147 0.0147 0.0146 0.014 6 0.0146 0.0145 0.0145 0.0145 0.0145 0.0145 0.0144 0.0143 0.0143 0 .01"42 0.01"42 0 .01-42 0 .0].42 0.0141 0 . 0141 0.0140 0.0140 0.01-40 0.0140 0.013B 0.0138 0.0138 0.0138 0.0138 0.0138 0.0137 0 . 0137 0.0137 0.0136 0.0136 0.0136 0.0135 0.0135 0.0134 0.0134 0.0134 0.0134 0.0134 0.0134 0.0133 0.0133 0.0]-32 0 .0132 0 . 0131 RAM Engineering, lnc. Final Engineering and Drainage Reporf RAM No. 16-011 Se/ecf Homes 8820 218th Sf. St¡/ 2-Lot Sho¡f Plat October 6, 2016 Page E-10 Attachment 5 105 106 ].07 108 109 110 111 712 113 1_1"4 115 LT6 7]_'7 118 119 ]-20 721_ 1_22 t23 124 125 726 1_27 L2B 1_29 130 131 t32 133 1_34 135 136 1,3'7 138 139 1-40 t4t r42 743 1_4 4 145 r46 1-41 148 1_49 150 151 r52 a EaAJJ 154 l-55 156 t5"7 0.00s9 0.00s9 0.0059 0.0058 0.0057 0.0055 0.0055 0.0055 0. 0055 0.0055 0.0055 0.0054 0.0054 0.0053 0. 0052 0.0051 0.0051 0.0051 0.0050 0.0049 0.0049 0.0049 0.0047 0.0046 0.004 6 0.0044 0.0043 0.0043 0.0042 0.0041 0.0041 0.0041 0.0041 0.0041 0.0041 0.0041 0.0041 0.0040 0.0038 0.0038 0.0037 0.0037 0.0036 0.0036 0.0035 0.003s 0.0034 0.0033 0.0033 0.0032 0.0029 0.0024 0.0016 0 . 0131 0.0131 0.0130 0.0130 0 .01-29 0.0128 0.0128 0.0128 0.0128 0.0128 0 .012'7 0 .0]-2'7 0 .072'7 0 .0121 0 .01_27 0 .0121 0.01-26 0 . o1-26 0.0126 0.0125 0.0725 0.0125 0.0]_24 0 .01-24 o .01_24 0.0724 0.0123 0.0123 0 .0722 0.0121 0.01"21, 0 .01-21- 0 . 0119 0.0118 0 . 0118 0 . 0118 0 . 0118 0.0118 0.0117 0 . 0116 0.0116 0.011s 0.0115 0 . 0113 0 . 0112 0 .011-2 0.0111 0.0109 0.0109 0.0106 0.0106 0.0105 0.0103 RAM Engineering, lnc. Final Engineering and Drainage Repoft RAM No. 16-011 Se/ecf Homes 8820 21Ùth Sf. SW 2-Lot Shoñ Plat October 6, 2016 Page E-l1 Attachment 5 Stream ProÈection Duration POC #1 Facility FAILED duration standard for 1+ flows. Flow (cfs) 0.0041 0.0046 0.0051 0.0057 0.0062 0.0067 0.0073 0.0078 0.0084 0.0089 0.0094 0.0100 0.0105 0 . 0110 0 . 0116 0 .01-2r 0 .0127 0.0132 0.0137 0.0143 0.0148 0.0153 0.0159 0.0164 0.0169 0.0175 0.0180 0.0186 0.0191 0.0196 0.0202 0.0201 0 .021-2 0 . 0218 0 .0223 0 .0229 0.0234 0 .0239 0.0245 0.0250 0.0255 0.0261 0 .0266 0 .021 7 0 .021'7 0.0282 0.0288 0.0293 Predew 28208 18844 ]-2931- 9061 6424 487 B 3112 3004 2335 1738 1340 1014 713 61_9 499 391 313 256 209 184 r6'7 ].41 1_42 136 13s 122 116 109 106 1_02 99 93 92 B5 81 75 1I 65 63 63 67 E1 55 ÊÀ ÈÁ 53 Êa 50 Mit Percentage Pass,/Fail 433025 1535 Fal1 319406 20L3 Fail 32'7934 2536 Farl 218224 30'70 Fail 232913 3626 Fail 197410 3923 Fail l.5436]- 4092 Fail 123368 4106 FaiL 911.64 416L Fai I 75309 4333 rail 57638 4301 Fail 43583 4298 Fail 32199 4L65 Farl 23688 3826 Fail !177 6 3562 Fail 13350 3362 Fail 98 65 3151 F arl'l 448 2909 F arl 5571 2665 Fail4019 2276 Fail 2964 L11 4 Fail 2123 1444 Farl 1550 1091 Fail 1138 836 Fail 755 559 Fail 538 440 FarI 337 290 Fail319 292 Fail 310 292 Fail 301 295 Fail 292 294 Farl 289 310 Fail 281 305 Fall 27 4 322 Fail 265 32't Fail 251 342 Fail251 353 Fail246 378 Fail 241 382 Fail 234 37l. Fail 221 3'72 Fal] 223 391 Fail 219 398 Fail 213 394 rarl 20'7 383 Fai-l ]-99 375 Fail 195 375 trail1BB 31 6 Fail RAM Engineer¡ng, lnc. Final Engineer¡ng and Drainage Report RAM No.16-011 Se/ecf Homes 8820 218th Sf. SW 2-Lot Shott Plat October 6, 2016 Page E-12 Attachment 5 0.0298 0.0304 0.0309 0.0314 0.0320 0.0325 0.0331 0.0336 0.0341 0.0347 0. 0352 0.0357 0.0363 0.0368 0.0374 0.0379 0.0384 0.0390 0.0395 0.0400 0.0406 0.0411 0 . 0416 0.0422 0 .0421 0.0433 0.0438 0.0443 o .0449 0.0454 0.0459 0.046s 0.0470 0 .047 6 0.0481 0.0486 0.0492 o .0497 0.0s02 0.0508 0.0513 0.0518 0.0524 0.0529 0.0535 0.0540 0.0545 0.0551 0.0556 0.0561 0.0567 0.0572 360 354 375 375 387 400 400 394 383 394 3BB )oa 370 384 387 393 410 392 392 400 384 396 408 408 400 3'7 5 362 373 369 312 311- 394 a1a 388 405 382 352 375 362 362 360 400 3"7 6 361 361 338 330 315 325 325 325 325 Fai I Fail Fai I Fail Fail Fai I fai I Fail Fail Fai 1 Fail F ail Fai I Fail Fail fail Fal I FaiÌ Fai I Fai I Farl Fai- l FaiI F ail Fai I Fail- Fai I FaiÌ Far f Fai I Fal I far I Fa 1l Fai I Fail Fai I Fai I Fal I Fai I Fai I Fail Fai I Fai l Fal I Fail F aif Far f Fail Fail Farf Fail Fail 50 50 45 44 40 38 37 36 36 34 34 34 34 32 3l- 30 2B 2B 21 26 26 25 24 24 24 24 24 23 23 22 2T 19 t9 1B 7'7 t't I1 16 1_6 I6 15 13 13 13 13 13 13 13 t2 1a t2 1_2 180 1-7 1 1_69 165 155 r52 148 L42 138 1-34 1_32 130 126 1_23 L20 118 l- 15 110 106 1_0 4 100 99 9B 9B 96 90 B1 B6 B5 B2 7B 15 17 10 69 65 60 60 tro 5B 54 52 49 47 4'7 44 43 4I 39 39 39 39 RAM Engineer¡ng, lnc. Final Engineering and Drainage Report RAM No. 16-011 Se/ecf Homes 8820 218th Sú. St4/ 2-Lot Sho¡l Plat October 6, 2016 Page E-13 Attachment 5 The development has an increagê in f].ow duratíons fcon L/2 Predeveloped 2 yeaz flolú to thê 2 year flow or more than a 10t increase from the 2 year to thê 50 year fJ.ow. The developmênt, has an increase in flow durations for more tl¡an 50* of the flows for the rangê of thê duration analysis. Iúater Quality BMP FLow and volume for POC #1 On-1ine faci].ity voLume: 0 acre-feet on-Iine facility ta¡get flow: 0 cfs. Àdjusted for 15 min: 0 cfs. Off-line facitity target flow: 0 cfs. Àdjusted for 15 min: 0 cfs. LID Report LID Technique Percent Water Quality VoÌuÍm lnfiltrated Used for Total Vo.lumn Percent Comment Treatment? NeedsI{ater Quafity Treatment Treated volumn Through Facility Infiltration volumn ( ac-ft . ) cumulative Volumn Infiltration Credit Tank POC N Totaf Volume Infiltrated 0.00 0? No Treat Comptiance with ],lD Standard I Duration Anal-ysis Result : Failed ac- ft 73.86 73.86 Credit ac-ft 0.00 0.00 N 0.00 0.00 Perlnd and Implnd Changes No changes have been made This program and accompanying documentation are provided 'as-ís' without warranty of any kind- The entire risk regarding the performance and results of this program is assumed by End User- C]ear Creek Solutions Inc. and the governmentaf licensee or sublicensees disclaim alf warranties, either expressed or implied, including but not fimited to implied warranties of prograrn and accompanyíng documentation. In no event shafl Clear Creek Solutions Inc. be fiable for any damages whatsoever (including without limitation to damages for ]oss of business profits, foss of business information, business interruption, and the like) arising out of the use of, or inability to use this proqram even if Clear Creek Sofutíons Inc. or their authorized representatives have been advised of the possibility of such damages. Software Copyright @ by : Cl-ear Creek Sofutions' Inc. 2005-2016; AfI Rights Reserved. RAM Engineering, lnc. Final Engineering and Drainage Report RAM No.16-011 Se/ecf Homes 8820 218th Sf. St4/ 2-Lot Short Plat October 6,2016 Page E-14 Attachment 5 F. DRAINAGE BASIN DESCRIPTION: The site is located in the Westgate Pond watershed basin. The Westgate Pond basin is a relatively small urban basin that collects stormwater runoff from primarily residential areas in the City Edmonds and ultimately discharges flows westerly to Puget Sound via the Shell Creek (see attached watershed map). The proposed detention tank systems for the new lots will discharge to the existing storm drainage system within the private driveway/easement that access 2L8th St SW. The storm pipe system within the private drive discharges to the existing pipe and ditch stormwater conveyance system located along the south side of 218th St SW; the 218th pipe and ditch system flows west (+/-2lO ft)to a junction catch basin that then directs the pipe system south and continues south about 180 ft to the outlet side of Westgate Pond; Westgate Pond is approximately 450 feet downstream of the project site. Westgate Pond discharges to the west to 92nd Ave W; the pipe system then turns south to the intersection of 92nd Ave W and 220th St SW (about 1,550 feet downstream of the site), See F-3 Downstream Drainage Facility Map, delineating the downstream path within l-,550 feet of the project site. The system then is directed westerly along 220th St SW to 95th Ave W and extend north to 21-7th St SW and then heads west again to 96th St SW. At 96th St SW the system is directed north in a collection of 18" to 24" pipes to a discharge to Shell Creek. The Shell Creek discharge point is about 1.2 miles downstream of the site. Shell Creek continues in a northwesterly direction and eventually discharges into the Puget Sound about 2.3 miles from the site A majority of the downstream conveyance system within a%mile of the site consists of a man-made pipe and catch basin system; some areas of open channel are found near the conveyance system into and out of Westgate Pond. No apparent flooding or system inadequacies within a% mile downstream of the site were discovered during site visits or research of the downstream system. See attached watershed and downstream drainage facility map for the local downstream path RAM Engineering, lnc. Final Engineering and Drainage Report RAM No. 16-011 Se/ecf Homes 8820 21Ùth Sf. Stll/ 2-Lot Shotf Plat October 6,2016 Page F-1 Attachment 5 F-2. Watershed Basin Map Íope Pond It ¿. Ð ffi FIGURE 8.1 CITY OF EDMOilOS WATERSHEDS ¡l A ffi o."rc..*IIÐIEIæi::IIil@ fiaítn glc ftær Jûd¡d ¡r*!t ¡o6a PlFd tlÊll l¡rcl Jfnll#¡a¡ Jdtrw:dnø&A Soúùfü* fr@ûCt I t¡fiho@ Cr.!t &ltd Prr¡ A TrÊol Pal t LrucC.tçl UË¡tt k P.^d r_lIüffiffiEIII@rf rï93gffi Ëdñoùdr ¡lrnh Êdñd!d9 wat fßIdılt G@d tlot Pond N¡lb gñe¡ H¡¡dlcyçeÉ t¡t" Srù¡n¡F ù.d¡ Gd.tr Mcdowd¡lêÀ Mê¡do¡d¡lr I ilr'tùss e¡tLf C.É¡i -iwtrøc** ar.ürm{ffiaômffim ¡ t¡.2,0@ñ &ffiVôtq 4 hü4¡æ ñÈ1áddtr8, A :t Á ¡ E RAM Engineer¡ng, lnc. Final Engineering and Drainage Report RAM No. 16-011 Se/ecf Homes 8820 21Ùth Sf. St4/ 2-Lot Shott Plat October 6, 2016 Page F-2 Attachment 5 F-3. Downstream Drainage Facility Map ¿rå29 1701 )l c¡ 880J æ ñ s¡ o ıE 6ðÉ¡Þê 6 è6 ä¡-6?ÕG',1r1 Ë FT PË i+t-t80 I1Ë Pt å21 217t3 rsw 217th 5t 5W 8801 ¿i Jl8 t- eCj:: :a"S ã,q' 7gl t'Iô o 8St5 ? Ête ı DË órÕ : ) i^èo 7tg a i. zl \ rOlv3g 8Cr¡ 8il Ìl ¿ì : åi r:1?¡û r Ë ] ' ¡¡î1l ¿t ll4 ô I I br I 7,â "4 Pl sw ?, 217th Ili1 )t qi: I t o ?) i:.iù : ¡rst z I ì 1 ð s€ 62r¡Cñ âi ì i¡r r¡tt Itl7?r Efn(tì ,'ianr ':lrrl j ir¡ l I -cF ,,*r,i**'*21 8¿ì 21et¡ ì ¡ È.'b oô'¡Þi! t: li ?r9Þl 8801 880t 9Ð(ij '¡03 F Ia l! â?l : :ll E3l : gt tliÊ90t r e0! I 'izl.i0¡l { ol I I t¿'r't ¿ potì.1aI Èö I 2 ôo :, .t1 ;i 13llttt ra,>i l<l /191ç 1óilcôiI lazn ,iûlN il ú$Þl'r l6 c ¡5 ô 22oth sw 5N ??cr { ¿10T1 ! Irl â : c ir'¡lç )¡ût7 3(u ,.c €¡Cl¡ fJtr Is ñ ã ô¿1,0r l : e u I hzno4 : l¿ur a 910.1 Õ ı ö ó € *i 7 € ¿,¡ùt I;¿01 ,''.'or, ¿to¿¿1102i rt(* ¡2t 23g Il¡tÌ:8 , €¡201o s'i¡gl RAM Engineering, Inc. Final Engineering and Drainage Report RAM No. 16-011 Se/ecf Homes 8820 21Ùth Sf. Sl¡/ 2-Lot Shoti Plat October 6, 2016 Page F-3 Attachment 5 G. GRADING & EROSION CONTROL SUMMARY: The project will require grading to construct the proposed buildings and utilities (including the stormwater detention system). Standard erosion control measures are proposed to be used during construction. The primary erosion and sediment control BMP during construction will be proper soil stabilization methods. Exposed soils shall be stabilized by application of effective BMPs that protect the soil from the erosive forces of raindrops, flowing water, and wind. Applicable practices include, but not limited to, temporary and permanent seeding, sodding, mulching, plastic covering, erosion control fabrics, matting, soil application of polyacrylamide (pam), the early application of gravel base on areas to be paved, and dust control. The contractor shall select a soil stabilization method best suited for the particular situation. Stock piles must be stabilized and protected with sediment trapping measures. ln addition, site containment of exposed soils shall be sustained by using silt fence barriers along the down-slope boundaries of the site's disturbance areas. See the site development plan for details. Soih; ln accordance with the City of Edmonds Soil Map the on-site soils consist of Alderwood-Urban land complex- 2% to 8% (soil #5). Alderwood soils are moderately well drained soil on till plains formed in glacial till and are categorized as a hydrologic group C soil (see full description attached). The Alderwood till soils are typically not suitable for infiltration of stormwater. ConsÜuction Stormwater Pollution Preventíon Plan (SWPPPI: The following is a summary of the site's erosion control measures that evaluates the typical DOE 13 elements of a SWPPP: Element 1": Mark Clearing Limits development plans. Clearing limits have been delineated on the engineering site Element 2: Estoblish Construction Access: A construction access has been delineated on the engineering site development Plans. Element 3: Control Flow Rates: Due to the underlying outwash soils no flow control system (ie: temporary pond) is proposed. During construction silt fencing will provide attenuation of site runoff and upon project completion and stabilization (established lawns and landscape of exposed soils), the infiltration storm system will provide flow control. Element 4 lnstall Sediment Controls: Filter fabric fence has been delineated and detailed on the engineering site development plans. At a minimum, silt fence will be installed along the down gradient perimeter of the disturbed area that will receive sediment-laden runoff. Element 5: Stobilize Soils: Soils will be stabilized per the TESC notes listed on the engineering site development plans. Element 6: Protect Slopes: Exposed slopes shall be stabilized per the TESC notes listed on the engineering site development plans. RAM Engineering, lnc. Final Engineering and Drainage Report RAM No. 16-011 Se/ecf Homes 8820 21Ùth Sf. St// 2-Lot Sho¡t Plat October 6, 2016 Page G-1 Attachment 5 Element 7: Protect Drain tnlets: Drain inlet protection will be installed on all catch basins that will receive sediment-laden runoff. See the engineering site development plans for locations and detail. Element 8: Stobilize Chonnels ond Outlets: channels or outlets proposed. This element is not applicable since there are no temporary Element 9: Control Pollutonts: Pollutants shall be managed as described in the TESC notes listed on the engineering site development pla ns. Element 10: Control De-Watering: Highly turbid or contaminated de-watering water shall be handled separately from stormwater. The water from all de-watering systems for trenches and foundations shall be treated or disposed prior to discharging from the site, Element 77: Mointain BMP's: BMPs shall be maintained and removed at the end of the project as follows: i. All temporary and permanent erosion and sediment control BMPs shall be inspected, maintained and repaired in accordance with the Drainage Manual or as approved or required by the City to assure continued performance of their intended function in accordance with BM P specifications. ii. The applicant may remove temporary BMPs when they are no longer needed. iii. All temporary erosion and sediment control BMPs shall be removed within 30 days after construction is completed and the City has determined that the site is stabilized. Element 12: Monage the Project: The owner of the site is responsible for managing the installation and maintenance of the site BMPs. Element L3. Protect Low lmpact Development BMPs: No LID measures are proposed Grodino Quantitv Approximation: The below listed grading quantities have been estimated using the AutoCAD 3D modeling of the site; estimated quantities are for permitting purposes only. Estimated grading site development quantities: Cut: 300 CY Fill: 300 CY Conclusion: The final site development construction plans will include specific grading and drainage improvement notes and details. With proper installation, maintenance and inspections of the proposed construction the project should have minimal impact to the surrounding environment. RAMEngineering, lnc. Final Engineering and Drainage Reporf RAM No. 16-011 Se/ecf Homes 8820 21Ùth Sf. St¡/ 2-Lot Shott Plat October 6, 2016 Page G-2 Attachment 5 G-3 Soils Map ì* r, l;- j= TE t lHt Í' \ ri I $ì tt (ì N v' -\.fl Figure B-l C¡ty of Edmonds Soil Map Units {5CS 1983}r!ilg l ! A LEGEilD Cítdlffi¡â5ty to[_aE¡¡hdærrtdfb 2€!!t¡t6bdCrüÌ)Edllù¡ &l5alqr kcóüeÉtM- ltãt.kÊr@<-&d|bHærà,tr5LdË¡frd€rdeô*/eqbq 2t70clehãqMÊYdl,*/ S M.0{ }!¡4..&fr{EËydþñ &13$ rþ9.,EYælgñ*tSM lt2tlú4êFhFb.ÞlGg lh- 0t þ ¡çr¡nssM-&2ltüFIlgæ9È.4t9þ. ûtar¡Érü[&Þdrft. ö,f-i"ì fl ¡i a@ ¡.t t.m f ln.2.0(x¡î &¡trda rl tÌ¡ør¡1sù, .¡ß sñrEÉ¡¡-.F,ñ4t tl l --4ã; ¡l.1 .l Ìii g:r - 6-.!-- RAM Engineer¡ng, lnc. Final Engineering and Drainage Repoft RAM No. 16-011 Se/ecf Homes 8820 219th Sf. St4/ 2-Lot Short Plat October 6, 2016 Page G-3 Attachment 5 SOIL SURVEY OF SNOHOMISH COUNTY AREA, WASHINGTON UNITED STATES DEPARTMENT OF AGRICULTURE, SOI L CONSERVATION SERVICE Alderwood -Urban land complex, (soil#5- 2 to 8 percent slopes) This moderately well drained soil is on till plains. lt ¡s moderately deep over a hardpan. The soil formed in glacial till. Areas are long and narrow. They are about 125 acres in size. The native vegetation is mainly conifers and hardwoods. Elevation is 50 to 550 feet. The average annual precipitat¡on is about 40 inches, the average annual air temperature ¡s about 50 degrees F, and the average frost-free season is 170 to 190 days. Typically, the surface layer is very dark grayish brown gravelly sandy loam about 7 inches thick. The upper part of the subsoil is dark yeilowish brown and dark brown very gravelly sandy loam about 23 inches thick. The lower part is olive brown very gravelly sandy loam about5inchesthick. Aweaklycementedhardpanisatadepthofabout35inches. Depthtothehardpanrangesfrom20to40inches. lncluded ¡n th¡s unit are small areas of soils that have a stony or bouldery surface layer and areas of McKenna so¡ls, Norma soils, and Terric Medisapr¡sts in drainageways on plains. Also included are small areas of Everett, lndianola, and Ragnar soils on terraces and outwash plains. lncluded areas make up about 15 percent ofthe total acreage. permeability of th¡s Alderwood soil is moderately rapid above the hardpan and very slow through it. Available water capacity is low. Effectiveroot¡ngdepthis20to40inches. Runoffisslow,andthehazardofwatererosionisslight. Aseasonal perchedwatertableisata depth of 18 to 36 inches from January to March. This unit is used mainly for urban development and as woodland. lt is also used for hay and pasture. Douglas-fir is the main woodland species on this unit. On the basis of a 100-year site curve, the mean site index is 142. on the basis of a so-year site curve, the mean site index is 108. The mean annual increment at culmination (cMAl) for Douglas-fir at age 65 is 148 cubic feet per acre. Among the trees of limited extent are western red cedar, western hemlock, and red alder. Among the common forest under story plants are salal, evergreen huckleberry, Oregon-grape, bracken fern, and western sword fern. This unit is well suited to year-round logging. Logging roads require suitable surfacing for year-round use. Rock for road construction is not readily available on th¡s unit, but gravel is available in areas of adjacent Everett soils. Brush competition ¡s the main limitat¡on for the production of timber. Reforestation can be accomplished by planting Douglas-fir seedlings. lf seed trees are present, natural reforestation of cut over areas by red alder occurs periodically. When openings are made in the canopy, invading brushy plants, if not controlled, can prevent the establishmentofseedlings. Becausetherootingdepthisrestrictedbyacementedpan,treesaresubjecttowindthrow. This unit is suited to hay and pasture. The main limitations are the low available water capacity and the weakly cemented hardpan, which l¡mitstheuseofthesoil inthisunitfordeep-rootedplants. Grazingwhenthesoil iswetresultsincompactionofthesurfacelayer,poor tilth, and excessive runoff. The main l¡m¡tations for homesites and septic tank absorption fields are the depth to the weakly cemented hardpan and wetness because of seasonal high water table. Effluent from absorption fields flows laterally above the hardpan and may seep at the bottom of slopes. Drainage is needed if buildings with basements and crawl spaces are constructed. Dur¡ng construction, disturbed areas need to be seeded and runoff controlled to protect the soil from erosion. Temporary sediment basins can be used in construction areas to reduce the amount of sediment in runoff water. This map unit is in capability subclass lVe RAM Engineer¡ng, lnc. Final Engineering and Drainage Repoñ RAM No.16-011 Se/ecf Homes 8820 218th Sf. St¡/ 2-Lot Shorf Plat October 6, 2016 Page G-4 Attachment 5 H. OPERATION AND MAINTENANCE GUIDELINES: These guidelines are intended to provide operation and maintenance instructions for the project's storm drainage control facilities. The owner is responsible for maintenance of storm drainage facilities within the property (private property owner system); the owner is not responsible for maintenance within the public right-of-way (City system). Privote Property Owners: Private property owners are responsible for properly maintain¡ng the stormwater infrastructure on their property to ensure ¡t operates as designed. The City has developed an inspection program to ensure private property owners are properly maintaining their stormwater systems. City System: City crews perform maintenance activ¡ties on the entire storm drainage system, including inspection and cleaning of catch basins, street sweeping, emergency flooding response, creek maintenance, inspection and monitoring of private stormwater detention systems. Operation and Maintenance Requirements for private property owner system: This manual is not comprehensive; although it explains the intended operation of the various components of the drainage system, and suggests a routine of inspection and maintenance, it cannot ant¡cipate every problem. Once a historical record of maintenance is established, it may be prudent to altertheroutine. ltisrecommendedthatmaintenancerecordsbekept,andthattherecordsbe reviewed periodically. Concept of Operation: The drainage design is shown and described in the site development engineering plans and report. The approved site development plans and report should be retained by the owner and used as a reference to identify drainage facilities outlined in this manual. Conveyonce Systems. The design objective in pipe sizing was to convey the large storm events without the water surface exceeding the ground elevation. Frequent overtopping of the pipe system in a particular area might indicate a downstream blockage. Overtopping of the drain systems at the catch- basins is an indication that maintenance is required. Stormwoter Storoge Detention Tonk System. The onsite detention system consists of an underground detention tanks on each individual lots. Onsite storm water runoff from the impervious surfaces are routed to the detention tank and discharged to the City's storm pipe system in 218th St SW. The detention tank is a typical component of a storm water control system for new development. Standard maintenance procedures should be followed. The following pages outline standard general maintenance criteria for the project's drainage facilities. For additional and updated maintenance information visit the Washington State Department of Ecology's web-site at: http://www.ecy.wa.gov/progra ms/wq/wqho me. html RAM Engineering. lnc. Final Engineering and Drainage Reporf RAM No. 16-011 Se/ecf Homes 8820 21Ùth Sf. St4/ 2-Lot Shotf Plat October 6, 2016 Page H-1 Attachment 5 No. 3 -Closed Detention Systems (Tanks/Vaults) ISalntsnancê Component Defect Conditlons l/Vhen itaintonance is Needed Resu¡ts When ltl Expected aintenance is PêrformÊd Storage Area Plugged Air Vents One-half of the cross section of a vent is blocked ât any po¡nt or the vent is damaged. Vents open and functioning- Debris and Sediment Accumulated sediment depth exceeds 1 0lo of the diameter of the storage area tor 112 length of storage vault or any point depth exceeds 15% of diameter. (Example: 7?-inch storage tank nould iequire cleaning wtren sediment Íeaches depth of 7 inches for more than 'll2 length of tank.) All sediment and debris removed from storage area. Joints Betliveen Iank/Pipe Section Any openings or voids allowing maþrial to be kansported into facility. (Will require engineering analysis to determine s'tructural stab¡ltty). Alljoint between tank/pipe sections are sealed. Tank Pipe Bent Out of Shape Any part of tanklpipe is bent out of shape moie than 10% of its design shape. (Review required by engineer to determine structural stability). TanUpipe repaired or replaced to design. Vault Structure lncludes Cracks in Wall, Bottom, Damage to Frame and/or Top Slab Cracks wider than 'lf2-inch and any evidence of soil particles entering the structure through the cracks, or maintenance/inspection petsonnel determines that the vault is not structurally sound. Cracks wider than 'll2-inch at the joint of any inleVoutlet pipe or any evidence of soil particles entéring the vault through the walls. Vault replaced or repaired to design specifications and is structurally sound. No cracks nrore than 114-inch wide at the joint of the inleUoutlet pipê. Manhole Cover Not in Place Cover is missing or only partially in place. Any open manhole requires maintenance. Manhole is closed. Locking Mechanism NotWorking Mechanism cannot be oPened bY one maintenance person with proper tools. Bolts ¡ntoframe have lessthan ll2inch of thread (mây not apply to self-locking lids). Mechanism opens with proper tools. Cover Difficult to Remove One maintenance person cannot remove lid after applying normal lifting pressure. lntent is to keepcover from sealing off access to maintenance. Cover can be removed and reinstalled by one maintenance person Ladder Rungs Unsafe Ladder is unsafe due to missing rungs, misalignment, not securely attached to structure wall, rust or cracks. Ladder meets design standards. Allovt¡s maintenance person safe access. Catch Elasins See "Catch Basins" (No. 5) See "Catch Basins" (No. 5)See "Catch Basins" (No. 5). Volume l/ - Runoff Treatment BMP s - Decetnber 20I 4 4-36 RAM Engineer¡ng, lnc. Final Engineer¡ng and Drain age Report RAM No. 16-011 Se/ecf Homes 8820 21Ûth Sú. St// 2-Lot Short Plat October 6,2016 Page H-2 Attachment 5 No. 4 - Control StructurevFlov Restrictor Ma¡ntenance Component Defect Condition Whên Maintenanæ ¡s Needed Results Expected When Maintenance ¡s Performed General Trash and Debris (lncludes Sediment) Material exceeds2S9t of sump depth or 1 foot below orif ice plate. Control structure orifice is not blocked. All trash and debris removed. Structural Damage Structure is not securely attached to manhole r,r¡all. Structure securely attached to wall and outlet pipe. Strudure is not in upright position {allow up to 10% from plumb). Structure in correct position. Connections to outlet pipe are not watertight and show signs of rust. Connections to outlet pipe are tvater tight; structure repaired or replaced and lwrks as designed. Any bole+-other than designed holes-in the structure. Structure has no holes other than designed holes. Cleanout Gate Damaged or Missing Cleanout gate is not watertight or is missing.Gate is watertight and r¡orks as designed. Gâte cannot be moved up and down by one maintenance person. Gate moves up and down easily and is wâtertight. Chain/rod leading ùc gate is missing or damaged. Chain is in place and r¡,orks as designed. Gate is rusted over 507o of its surface area.Gate is repaired or replaced to meet design standards. Orifice Plate Damaged or Missing Control device is not vìðrk¡ng properly due to missing, out of place, or bent orifice plate. Plate is in place and works as designed. Obstructions Any trash, debris, sediment, or vegetation blocking the plate. Plate is free of all obstructions and works as designed. OverflowPipe Obstructions Any trash or debris blocking (or having the potential of blocking) the overflow pipe. Pipe is free of all obstructions and works as designed- Manhole See "Closed Detention Sys{ems' (No.3). See "Closed Detention Systems" (No. 3)See "Closed Detention Syslems' (No 3). Catch Basin See'Catch Basins" (No. 5). See "Catch Ebsins" (No. 5).See "Catch Basins" (No. 5). Ilolwne V- Runof Treatment BMPy - December 2014 4-37 RAM Engineering, lnc. Final Engineer¡ng and Drainage Report RAM No. 16-011 Se/ecf Homes 8820 21Ùth Sf. St¡/ 2-Lot Short Plat October 6, 2016 Page H-3 Attachment 5 No.5-Gatch Basins Maintenance Component Defect cond¡tions When Maintenance is Needed Results Expected When Maintenance ¡s performed General Trash & Debris Trash or debris which ís located immediately in front of the catch basin opening or is blocking inletting capacity of the basin by more than '10%. No Trash or debris located immediately in front ol catch basin or on grate opening. Trash or debris (in the basin) that exceeds 60 percent of the sump depth as measured from the bottom of basin to invert of the lovtæst pipe into or out ofthe basin, but in no case less than a minimum of six inches clearance from the debris surface to the invert of the louæst pipe. No trash or debris in the catch basin. Trash or debris in any inlet or outlet pipe blocking more than 1/3 of its height. lnlet and outlet pipes free of trash or debris. Dead animals or vegetation that could generate odors that could cause complaints or dangerous gases (e.9., methane). No dead animals or vegetation present within the catch basin. Sedirnent Sediment (in the basin) that exceeds 60 percent of the sump depth as rneasured from lhe bottom of basin to invert of the lou,est pipe into or out ofthe basin, but ín no case less than a minimum of 6 inches clearance from the sedirnent surface to the invert of the lou,est pipe. No sediment ¡n the catch basin Structure Damage to Frame and/or Top Slab Top slab has holes larger than 2 square inihes or cracks wider úran 1/4 inch (lntent is to make sure no material is running into basin). Top slab is free of holes and cracks. Frame not sitting flush on top slab, i.e., separation of more than 314 inch of the frane from the top slab. Frame not securely attached Frame is sitting flush on the riser rings or top slab and firmly attached. Fractures or Cracks in Basin Walld Bottom Maintenance person judges that structure is unsound. Basin replaced or repaired to design standards. Grout fillet has separated or cracked wider Ihan 112 inch and longer than 1 foot at the joint of any inleUoutlet pipe or any evidence of soil particles entering catch basin through cracks. Pipe is regrouted and secure at basin uall. Settlement/ Misalignment lf failure of basin has created a safety, function, or design problem. Basin replaced or repaired to design standa¡ds. Vegetation Vegetation growing across and blocking more than 10% ofthe basin opening. No vegetation blocking opening to basin. Vegetation growing in inleUoutlet pipe joints that ¡s more than six inches tall and less than six inches apart. No vegetation or root growth present. Contamination and Pollution See "Detention Ponds'(No. 1)No pollution present. Yolurne V- Runof Treatment BMPs - December 2014 4-38 RAM Engineer¡ng, lnc. Final Engineering and Drainage Report RAM No. 16-011 Se/ecf Homes 8820 21Ùth Sf. St// 2-Lot Shott Plat October 6, 2016 Page H-4 Attachment 5 No.5-Catch Basins No. 6 - Debris Barriers (e.9., Trash Racks) Volume V * Runof Treatrnent BMPr - December 2t14 4-39 Maintenance Component Defecl cond¡t¡ons When Ma¡ntenance is Needêd Results Expected When Ma¡ntenânce is performed Catch Basín Cover Cover Not in Place Cover is missing or only prtially in place. Any open catch basin requires n¡aintenance- Catch basin cover is closed Locking Mechanism NotWorking Mechanism cannot be opened bY one maintenance person with proper tools. Bolts into frarne have less than 112 inch of thread. Mechanism opens with proper tools. Cover Difficult to Remove One maintenance person cannot remove lid after applying normal lifting pressure. (lntent is keep cover from sealing off access to maintenance.) Cover can be removed by one maintenance person. Ladder Ladder Rungs Unsafe Ladder is unsafe due to missing rungs, not securely attached to basin uiall, misal-¡gnment, rust, crãcks, or sharp edges. Ladder meets design standârds and allovr¡s ma¡ntenance person safe ac-cess. Metal Grates (lf Applicable) Grate opening Unsafe Grate with opening wider than 718 inch.Grate opening meets design standards. Irash and Debris Trash and debris that is blocking npre than 20% of grate surface inletting capacity. Grate free of trash and debris. Damaged or Missing. Grate missing or broken membe(s) of the grate. Grate is in place and meets design standards. Ma¡ntenance Components Ðefec't Condition When Maintenance is Needed Results Expected When Maintenance is Perform ed General Trash and Debris Trash or debris that is plugging more than 20Yo of the openings in the barrier Barrier cleared to design flow capacity. Metal Damagedl Missing Bars. Bars are bent out of shape more than 3 inches. Bars than in place with no bends more 314 inch. Bars are míssing or ent¡re barr¡er missing. Bars in place according to design. Bars are loose and rust is causing 50% deterioration to any part of banier. Barrier replaced or repaired to design standards. lnlet/Outlet Pipe Debris barrier missing or not attached to pipe Barrier firmly attached to pipe RAM Engineering, lnc. Final Engineer¡ng and Drainage Reporf RAM No. 16-011 Se/ecf Homes 8820 21Ùth Sf. Sl4/ 2-Lot Short Plat October 6, 2016 Page H-5 Attachment 5 t I I I I I I I I I I I I I I I I l, I Attachment 5 RECT'VËD lllAY 24 2016 #828 CUSTOMER EUC CONTACT Form A coordinated utility environment which maximizes j oint utitity opporhmities to provide quality sewice for the citizens of Edmonds E U'U-ililtfitiscffioiliun YOU V/ILL BE GIVEN A CONFIRMATION NUMBER BY EACHUTILITY ONCE YOU IIAVE INFORMED THEM OF YOUR PROJECT. SITE ADDRESS:ga?þ 4 88VL Uæ 3r g^: €l>r.<s+Ðs ntot4 THIS FORM MUST BE COMPLETED AND GIVEN TO DEVELOPMENT SERVICES STAFF AT THE TIME OF PERMIT SUBMITTAL Rev. 10/1/13 Mary McAllister - 475-670-3216 # Pup - 0062' 2ôt Q You will need to provide PUD with a site plan and a completed New Service Questionnaire. P!_çår seuILD [,NERGY New Customer Constrttction Department, l-888-32L,7 7 7 9 # so333ö?2L Call to verify gas availability and to coordinate service install. You will need to provide parcel number' contact phone number and mailing address. lffi,p;;1. , ;._.--,",- r.¡...{:. í l.^,; ,:'"1 Jeremy Fallt - 425-263-4024 # s(8 Þcr, Bea*roç¿1 +2,5.2-ta7' SlÔt You will need to provide Frontier with the location of your project, total line requirement, and the date in which service is required. A copy of your Mike Fonten ot 425-263 -5482 c(}mcost"# nt46L You will need to provide Comcast with the location of your project, a copy o{ your development and site plan (digital copy if available.) The date in which service is required and a list of contact names, phone numbers & mailing Steve Dunphy - 425.774,7769 ext. 110 Fo¡ custorners in Olyrnpic View Sen'ice Area # ¡4/^ You will need to provide OWVSD with the survey map o{ your site and complete a development information form. Attachment 6 21930 89 1 8 90 0 2 91 0 9 90 2 0 8606 90 0 8 89 1 5 215 2 0 87 2 3 8626 21622 21904 91 0 7 22016 8706 90 2 8 21808 91 1 9 91 1 2 89 1 5 2202122024 86 3 1 9033 21802 2 1 8 0 7 90 2 5 21904 88 2 2 87 1 8 89 0 1 21718 21701 90 0 9 21726 89 1 4 90 2 4 88 1 4 22016 21602 88 2 1 21617 21719 88 2 8 22 0 2 8 22004 2 1 8 0 1 89 1 6 8915 21915 21609 86 0 6 91 2 7 89 2 4 89 1 6 21626 9008 88 2 1 21629 89 3 4 90 1 6 89 2 0 88 0 3 91 1 2 90 2 0 86 1 4 88 2 6 88 0 6 88 2 0 21718 22 0 2 4 2210 6 8602 89 1 5 88 0 4 91 1 1 21911 89 2 9 90 0 4 21922 90 2 3 90 0 9 22017 90 1 7 90 1 4 2 2 0 2 3 87 0 4 21614 2 2 1 0 1 8630 21527 89 3 2 87 0 8 2 1 8 0 5 22012 22014 89 0 2 91 2 4 90 0 3 21623 88 3 0 90 0 3 21914 21919 21712 89 0 4 2 2 0 1 9 9 0 2 5 87 2 0 22 1 0 4 21707 22031 88 1 3 87 1 6 89 2 3 89 0 7 21804 86 1 0 21611 90 0 3 90 2 1 89 1 0 22 0 3 2 91 0 6 89 1 2 90 2 2 89 3 0 90 1 0 21905 91 2 0 2152391 2 9 91 1 9 87 0 3 89 3 2 86 2 0 8805 90 1 6 21705 88 2 2 87 2 1 9032 22019 89 0 2 8802 21621 89 0 9 88 1 0 90 1 5 21519 21608 22 0 1 1 91 1 1 21 8 0 3 22008 89 0 1 90 0 2 22023 88 0 4 21615 89 1 0 88 2 2 89 2 3 89 1 7 90 1 4 8803 21704 8627 21528 21529 21809 88 2 1 8730 861 2 22027 21903 8713 88 0 7 89 2 4 8725 87 1 0 2180 6 89 0 5 22020 88 2 4 90 1 1 86 2 3 21625 21823 88 1 6 90 1 5 89 0 9 8803 8807 8730 88 1 5 89 1 5 21814 21815 21812 21810 87 1 1 21811 21813 8729 21719 OLYMPICBAPTIST CHURCH 22003 22019220152201122007 8702 21821 86 T H P L W 217TH ST SW 86 T H A V E W 217TH ST SW 88 T H A V E W 218TH ST SW 9 0 T H A V E W 87 T H A V E W 88 T H P L W 88 T H A V E W 220TH ST SW 8 7 T H P L W 216TH ST SW 8 6 T H P L W 8 6 T H P L W H Project Location Zoning and Vicinity MapPLN20160025218th Street Two-Lot Short Plat 1 inch = 200 feetScale Attachment 7 #P20 c. 1 City of Edmonds Development Services Department Planning Division Phone: 425.771.0220Fax: 425.771.0221 Date Received: SleqhC City Receipt #: CriticalAreas F¡le #: C-RA2otGoÕ56 Gritical Areas Checklist Date Mailed to Applica CRITICAL AREAS CHECKLIST The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of the application to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are, or may be, present on the subject properfy. The information needed to complete the Checklist should be easily available from observations ofthe site or data available at City Hall (Critical areas inventories, maps, or soil surveys). A property owner, or his/her authorized representative, must fill out the checklist, sign and date it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. Please submit a vicinity map, along with the signed copy of this form to assist City staff in finding and locating the specific piece of property described on this form. In addition, the applicant shall include other pertinent information (e.g. site plan, topography map, etc.) or studies in conjunction with this Checklist to assistant staff in completing their preliminary assessment of the site. Thç undersigned applicant, and his/her/its heirs, and assigns, in consideration on the processing ofthe application agrees to release, indemniff, defend and hold the City of Edmonds harmless from any and all damages, including reasonable attorney's fees, arising from any action or infraction based in whole or part upon false, misleading, inaccurate or incomplete information furnished by the applicant, his/her/its agents or employees. By my signature, I certiff that the information and exhibits herewith submitled are true and correct to the best of my file this application on the behalf of the owner as listed below 5lz+l lLt^DATE knowledge and that I am authorized SICN¿TUnT OF APPLICANT/AGENT Properfy Owner's Authorization By my signature, I certifu that I have authorized the above Applicant/Agent to apply for the subject land use application, and grant my permission for the public officials and the staff of the City of Edmonds to enter the subj ect property for the purposes ofinspection ancl posting attendant to this application. STcNATURE op OwN¡,n ,4,r^Å " ú2'*t-DArE s f.r'{l rk PLEASE PRINT CLEARLY Owner/Applicant: Gerner [inda Applicant Representative: Select Homes, Inc. c/o Kayla Clark Name 675 Chuckanut Dr N Name 16531 13th Ave W Ste 4107 Street Address Bellinsham WA 9A226 Street Address lynnwood WA 98037 City Telephone zip City State 142s1742-6044 Email Address: kayla.clark@outlook.com zlp Email address: Revised on I 2/l 8/l 2 State P20 - Critical Areas Checklist Page I of2 Attachment 8 #P20 cA File No Critical Areas Checklist Site Inf ormation (soils / top o gr aphy / hydrolo gy / ve getation) Site Adclress/ Location:8820 & 88222t8th St SW Edmonds, WA 980261.. 2. J. 4. Property Tax Account Number: 27O430oo2ot7OO Approximate Site Size (acres or square feet)0.56 acres Is this site currently developed? j yes; - no. If yes; how is site developed?Two Existing SFRs 5. Describe the general site topography. Check all that apply. Flat less than S-feet elevation change over entire site. x Ro[ing: åtro*ï.iïr:i:rj"",î:*1ly less than 15% (a vertical rise of 10-feet over a horizontal Hilly: Steep: slopes present on site of more than 15% and less than 30% (a vertical rise of L0-feet over a horizontal distance of 33 to 66-feet). grades of greater than 30% present on site (a vertical rise of lO-feet over a horizontal distance of less than 33-feet). Other (please describe) 6. Site contains areas of year-round standing water: None ' Approx. Depth: 7. Site contains areas of seasonal stancling water: None ; Approx. Depth: \,Vhat season(s) of the year?n.a. 8. Site is in the floodway No floodplain No of a water course. 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year-round? No Flows are seasonal? n.a. (\Mhat time of year? 10. Site is primarily: forested meaclow shrubs mixed -; urban landscaped (lawn, shrubs etc) Urban landscape 1"1. Obvious wetland is present on site: None ) For City Staff Use OnlY---* Plan Check Number, if applicable? Critical Areas inventory or C.A. map indicates Critical Area on site? 5. Site within designated earth subsiclence landslide hazard area? I ). ^\- --r1 -r) f1;t¡ fL tt WAIVER Reviewed 1.. 2. J. 4. DETERMIN Site is Zoned? SCS mapped soil type(s)? Revísed on I 2/1 8/l 2 P20 - Critical Areas Checklisl Page 2 of2Attachment 8 Critical Areas Map cRA20160056 8820 and 8822 - 218th St SW r Scale 1 inch = 50 feet ¿c. l8 Attachment 8 DA Zone G 21 21117 21100 NN N N 21 116 21120 211't7 21100 21119 21120 21030 ç!f,,. E .EI8504 ! 21102 21106 1211 21112 21 21218 220 21200 N 21224 8605 21 21241 8823 21304 9121 8825 I t26 N 21310 21 ts 8806 88128808 88'f48810 8816 8815 8629 ts8813 3ul à l-Òa =ul tFoo B uJ !F@@ =ut I¡'. @ Nts 21617 ts21621 21602 8602 t- N I N 21608 21609 21614 21610 21614 21615 21614 21615 21618 21624æ272162921623 21701 8630 N2170421703 21707 21712 21711 21712 F 21718 21717 ¡ 21732 21726 21725 21734 Jo- Jo- F @ 217TH ST SW 7fH =J(L IFoo 2171 21 8730 21801 8516 3 N 21806214O585268606218162180687'18 æ20 8518 I21821 21420 21423 NN 214302180921826 21 21905 21904 21904 21903 21912 21911 21904 Olympic Baptist Church 8713 8429 21915 È 21914 21911 =Jô- 21906 21922 850521919 N 21930 a725 N N N ul4 21228 21224 21304 306 21308 21s16 N !N 21415 8515 3 21423 21431 4524 8516 N 21507 21506 215142150221512 21515 21522 21523 21524 N 21417 21421 21429 8808 2t503 2143221505 21511 21517 21504 NN ts 21508 21519 215112151421527 21518 215162152321519 2152021529Na 21527 Grace Church 8703 403 21402 407 9104 21408 21415 s102 21618 2142421423 2150421429 2151221505 215182151321421 21522 21519 N ts 21528 N N 21611 9025 21626 21625 8803 21705 I N 8802 21719 21733 21718 / a 1215 217 2140) 2141: 9\920 I 2150 21511 21511 {2152: ]'15 9201 2161 N N 21714 2180, 214'lt1 21 01 )9 2'190r ,rà2191t 5 9205 21926 22004 N s008 !UJ 22016 22017 22014 c!22023 22024s009 tt N 8506 8514 22019 22021 8528 2201H8512 22031 22029 8530 8510 N 22014 22020,.<22022 22024 N A City of Edmonds Address Book, November 2402 N.W. 1t4, SEC. 30 T.27N., R.4 E.W.M.Attachment 8 C¡. . OF EDMONDS - PLANNING DlVl¡,CN t] Pw-¡ngineering COMMENT FORM Vrn" E pw - Mointenonce t] por¡<s & Rec. E rriloing -^\E àono-ic Dev. E Porks Moinlenonce Project Num Applicont's Nome Property Locotion:8820 218TH ST SW Dote of Applicotion: A5.24.16 Dote Form Routed: 05.2ó.16 Zoning P(-n Project Description:2 LOT SHORT PLAT *,ËPER ECDC 2O.O2.OO5 Att COMMENTS MUST BE SUBMITTED WITHIN 15 DAYS OF THE DATE THIS FORM WAS ROUTED DIIF BY ß/O9 A lf you hove ony questions or need clorificotion on this projecl, pleose conloct: Responsible KFRNEN N ExI. 1223 *** **x* * ***** **<* *{.*** * * x******* *x* **:F** * **x*** *** *x ****** *** **** Nome of lndividuolSu itting Comme n Title reviewed fhis land use proposol for my deportment ond hove concluded thot lT WOULD NOT AFFECT MY DEPARTMENT, so I hove no comments. My deporfment moy olso review fhis project during the building permit process (if applicoble) ond reserves fhe right fo provide odditionol cornrnenfs af thot time. * * x * t+*7 * x * * * x * yl x x * * x x * * **< *< * * * * * * * * * * * * * * * *&¿4--- fl I r,ou" reviewed this lond use proposo/ for my deportmenf and hove conc/uded thot lT WOULD AFFECT MY DEPARTMENT, so lhove provided comrnenfs or conditions be/ow or oftoched. î,.nï,uT" "*ïnl.:,,"oo,,.n",,o".",, n""."o,, " i5 l_ ,) -=--a- The following conditions should be otloched to this permit To ensure complionce with the requirements of ihis deportment (pleose otfoch memo if odditionolspoce is needed): Dote tþ Signoture Phone/E-mo¡l:- Attachment 9 City of Edmonds Date: November 22, 2016 To: Kernen Lien, Senior Planner From: JoAnne Zulauf, Engineering Technician Subject: PLN20160025, Gerner 2-lot Short Plat 8820 218th St SW Engineering has reviewed the preliminary short plat application for the Gerner property at 8820 218th St SW. The information provided indicates general engineering feasibility; project-specific design, including final utility system design and location, as well as Title 18 Edmonds Community Development Code compliance, will be reviewed during the civil construction phase of this project. Preliminary approval shall not be interpreted to mean approval of the improvements as shown on the preliminary plans. Please find attached the Engineering Requirements for the subject development. The applicant will be required to satisfy these requirements as a condition of short plat approval. Once the Planning Division has approved the preliminary short plat, the applicant will be required to submit revised civil engineering plans addressing all short plat conditions. Plans are to be submitted to the Engineering Division. A civil plan review fee is to be paid at the time of submittal. At this time, the review fee is $2570. The following information is provided in an effort to assist with preparation of the civil construction plans: 1) Civil plan sheets shall include an approval block similar to that provided on the City website. 2) Update the utility purveyor information to reflect current EUC Handout #E28, available on the City website. Add Stormwater purveyor, City of Edmonds as well as Fire – Fire District 1. 3) Update General Notes to reference current codes/standard specifications. 4) Include in the construction sequence the phasing of work and protection of areas where low impact development techniques will be used to meet stormwater management requirements. Existing trees and vegetation shall be retained where feasible. Thank you. MEMORANDUM Attachment 10 PLN20160025_Engineering Requirements.xlsx form revised 07.19.11 1 of 3 printed 11/22/2016 Planning Division PLN20160025 JoAnne Zulauf, Engineering Technician Engineering Division Date:November 22, 2016 Gerner 2-Lot Short Plat Address:8820 218th St SW Required as a Condition of Subdivision Requirement Already Satisfied Right-of Way Dedication for Public Streets: a) 2. a) 3. a) X X X X b) X c)X d)X e) X 4. a) 5. a)X b)X 6. a) i. Private access road shall be paved to 16.0-feet in width, plus 18" asphalt thickened edge or 6-inch concrete extruded curb may be used to direct storm flows. Where access road is only serving 2 lots the paving width may be reduced to 12' . ii. Slope of private access road and driveways shall not exceed 14% and shall be noted as such on the civils. iii. Cross slope of private access road shall not exceed 2% Lot 1 & 2 individual driveway access points shall meet sight distance requirements set forth by the American Association of State Highway and Transortation Officials (AASHTO). Provide asphalt or concrete driveway approaches on each lot per City Code. Slope of driveway shall not exceed 14% and shall be noted as such on the civils. To:File Number: From: Project: N/A Street Lights: Private Access Requirements & Improvements: N/A CITY OF EDMONDS 121 - 5TH AVENUE NORTH, EDMONDS, WA 98020 Required as a Condition of Building Permit PUBLIC WORKS DEPARTMENT - ENGINEERING DIVISION REQUIREMENTS FOR SHORT PLATS Existing easement for access and utilities crossing 8824 and 8826 218th St SW. Lots 1 & 2 shall take access off existing private access road, with access from 218th St SW. Access will be shared with 8824 and 8826 218th St SW Public Street Improvements & Access (Asphalt, curb, gutter and sidewalks): Street Turnaround: Easements (City utilities, private access, other utilities): Provide on-site turnaround on Lot 1 and/or Lot 2 to benefit Lot 1 and 2 to City Standards. If Fire Department requires larger turnaround, Fire requirements will prevail. N/A Provide access, utilities, etc for Lot 1 & 2. N/A Attachment 10 PLN20160025_Engineering Requirements.xlsx form revised 07.19.11 2 of 3 printed 11/22/2016 Required as a Condition of Subdivision Requirement Already Satisfied Required as a Condition of Building Permit 7. a) 8. a)X b)X c)X d)X e)X 9. a)X b)X c)X d)X 10. a) X b) X c)X d)X 11. a)X 12. a)X b) 13. a)X 14. a) 15.a)X 16. X Submit a grading plan as part of engineered site plan. Underground Wiring (per Ord. 1387): Excavation and Grading (per IBC) Submit grading plan for foundations with building permit. Provide an as-built drawing of all street and utility improvements both in electronic format as well as a hard copy. As-built Drawings (per City Engineer): Other Requirements: i. Stormwater management system to be located on private property. ii. Construct storm facility for access road & associated impervious Provide storm sewer stub to all proposed lots. Connect all impervious surfaces to public storm system or manage stormwater on site if soils allow. Required for all new services. Sewer line shared by more than one lot shall be 6". Provide a Stormwater Management Report and Site Plan that shows compliance with ECDC 18.30, Stormwater Supplement and 2005 Department of Ecology Stormwater Manual. iii. Construction of storm facility may be deferred to coincide with construction of a single family residence on Lot 1 & 2 if the required short plat improvements create less than 2000sf of impervious surface area and the site disturbs less than one acre. If applicant chooses to defer construction of the stormwater management system, the stormwater system will need to be designed to the code in effect at the time of building permit application. Provide fire and aid address signage per City Standards. N/A Signage and Striping (per City Engineer): Survey Monumentation (per Ord., Sect. 12.10.120): Construct privately owned and maintained stormwater management system sized to provide adequate capacity for proposed future single family dwellings, and associated impervious areas in accordance with ECDC 18.30. X X X Public hydrant spacing shall meet requirements of ECDC 19.25. Applicant must meet requirements set forth by the City of Edmonds for connection to public sewer system. X Planting Strip: Sanitary Sewer System Improvements : Water System Improvements : Stormwater System Improvements: N/A Provide water service stub to each Lot Applicant must meet requirements set forth by the City of Edmonds for connection to public water system. Connect to public water system. Install storz adapter on existing fire hydrant, as required. Provide side sewer stub to each lot. X X Connect to public sewer system. Attachment 10 PLN20160025_Engineering Requirements.xlsx form revised 07.19.11 3 of 3 printed 11/22/2016 Required as a Condition of Subdivision Requirement Already Satisfied Required as a Condition of Building Permit a)X b)X c)X d)X e)X f)X g) 17. a)Storm system development charge (short plat imp.)TBD X b)Storm system development charge (each new lot)$799.00 * c)$4,417.00 d)$5,050.00 e)$2,970.00 f)$1,196.33 * g)$2,570.00 *X h)TBD X i)TBD X Field stake utility stubs at property lines Plat showing lots, easements, legals, survey information X Maintenance agreements Field stake lot corners (by professional surveyor) Clustered mailbox location per Postmaster Inspection fees Traffic mitigation fee per each new SFR X Sewer connection fee Water meter fee (1") Plat/PRD civil plan review fee X X X Right-of-Way Construction Permit Water connection fee (3/4") X Legal documents for each lot * Fees provided are an estimate only and reflect rates current at the time of the pre-app meeting. Actual fees to be paid will be reflective of those in effect at time of permit issuance. X Traffic Impact Fee Analysis Engineering Fees: Attachment 10 FILE NO.: PtN2Ol ó0025 Applicont Selecl Homes DECTARATION OF POSTING On the 29Ih doy of June, 2016, the ottoched Notice of Applicotion wos posted of the subject property, Civic Holl, Librory ond Public Sofety buildings. l, Kernen Lien, hereby declore under penolty of perjury under the lows of the Stote of Woshington thot the foregoing 2016, of Edmonds, Woshington. is true on orrect this 29 doy of June, Signed \,/^* {BFP747893.DOC; 1\00006.900000\ } Attachment 11 FILE NO.: PLN20160025 Applicant: SelectHomes DECLARATION OF MAILING On the 27th day of June, 2016, the attached Notice of Application was mailed by the City to property owners within 300 feet of the property that is the subject of the above-referenced application. The names of which were provided by the applicant. I, Denise Nelson, hereby declare under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct this 27th day of June, 2016, at Edmonds, V/ashington. Signed {BFP747887.DOC; l\00006.900000\ } Attachment 11 C, T 89a CITY OF EDMONDS NOTICE OF APPL¡CATION The applicant is proposing to subdivide a single 24,572 square foot lot into two lots. The site is zone RS-8 (Single-family residential; minimum lot size of 8,000 square feet). 8820 -218th Street SW, Edmonds, WA. Tax Parcel Number 27043000201700 Select Homes, lnc. P1N20160025 May 24,2Ot6 June2t,20t6 June29,2Ot6 Short Subdivision (Type ll-A Permit Process) None. PROJECT DESCRIPTION PROJECT LOCATION NAME OF APPLICANT: FILE NUMBER: DATE OF APPLICATION: DATE OF COMPLETENESS DATE OF PUBLIC NOTICE: REQUESTED PERMIT: OTHER REQUIRED PERMITS: EXISTI NG ENVIRONM ENTAL DOCUMENTS: Critical Area Determination, Storm Drainage Report COMMENÏS ON PROPOSAL DUE: July 13, 2016 Any person has the right to comment on this application during public comment period, receive notice and participate in any hearings, and request a copy of the decision on the application. The City may accept public comments at any time prior to the closing of the record of an open record predecision hearing, if any, or, if no open record predecision hearing is provided, prior to the decision on the project permit. Only parties of record as defined in ECDC 20.07.003 have standing to initiate an administrative appeal. lnformation on this development application can be viewed or obtained at the City of Edmonds Development Services Department, t2L srh Ave North, Edmonds, WA 98020 between the hours of 8:00 A.M. and 4:30 P'M. Monday, Tuesday, Thursday and Friday; between the hours of 8:30 AM and Noon on Wednesday; or online through the City's website at www.edmondswa.gov through the Online Permits link. Search for permit P1N20160025. CITY CONTACT Kernen Lien, Senior Planner kernen.lien@edmondswa.gov 425-771-0220 Attachment 11 âizt8'iri s7 ,w' 5 T I I :l ¡ lIII &: ¡$Ëã9 *uilJ¡r'Êitúr¡9¡ I 'Ì .t{,'I i I 1 ì !.-t'a, I'1- 'a '/r I t¿1¿ê g 1t"þtt * {^Ël} I ¡ I t-- ,, ri !9".rht'tf {o/ Ít .81 ç E r.âfra sã€fl 1t. l!_i! {.\ 1I .t --:),. t ),r Attachment 11 Everett Daily Herald Affïdavit of Publication State of Washington ) County of Snohomish ) ss Kathleen Landis being first duly sworn, upon oath deposes and says: that he/she is the legal representative of the Everett Daily Herald a daily newspaper. The said newspaper is a legal newspaper by order of the superior court in the county in which it is published and is now and has been for more than six months prior to the date of the frst publication of the Notice hereinafter referred to, published in the English language continually as a daily newspaper in Snohomish County, Washington and is and always has been printed in whole or part in the Everett Daily Herald and is of general circulation in said County, and is a legal newspaper, in accordance with the Chapter 99 of the Laws of 1921, as amended by Chapter 213, Laws of 1941, and approved as a legal newspaper by order of the Superior Court of Snohomish County, State of Washington, by order dated June 16, 1941, and that the annexed is a true copy of EDH708029 PLN20160025 as it was published in the regular and entire issue of said paper and not as a supplernent forrn thereof for a period of I issue(s), such publication commencing on 0612912016 a¡d ending on 06/2912016 and that said newspaper was regularly distributed to its subscribers during all of said period. The amount of the fee for such publication is $65.36. Subscribed and sworn before me on this4 a,ö I day of ? Notary Public in and for the State of Washington. Cìty of Edmon& - LEGAL ADS I 14 I 01 4 t 6 KERNEN LIEN DEBRA ANN GRIGG NototY Publlc Stole of Woshlngton 'My Co'mmlsslon ExPlres October 31, 2017 Attachment 11 SW Édmonds, WA. DATE OF DATE Crltlcal May 24,2016 June 21, 2016 June 29,2016 Procêss) rscslvs ol the lPubl¡shed: Jun€ 29,I EDH708029r ï (\1 Attachment 11 RHGEE\f Effi JUL t I 2016 ¡AËùJgtøHl,,tËÌ$¡iT i'Sf; RII I 0 FS Patrick Gearin 8830 218th Street SW Edmonds, WA 98026 425-778-6718 pjgearin@yahoo.com July 6,2016 Dear City of Edmonds Planning Department: I am writing to comment on the proposed application for a subdivision in Edmonds (File number P1N20160025). I am a home owner who owns the property immediately to the west of the proposed subdivision. As such, I received a notice of the application in the mail. ldon't necessarily have any great concern with the proposal to build two new single family homes on the adjacent property but wanted to get further information and assurances. First, lwant to make sure that only two single family homes are proposed for the location and that they will not be considered multifamily or allow for renting of parts of the main homes. Second, the existing property has many large trees which has caused damage to my fence and in fact a large wind storm in the summer of 2015 broke off a huge limb from a maple tree and landed on my fence, breaking several posts and knocking part of the fence over. I was not able to reach the former property owner to reconcile this situation. Many of these trees on the SW portion of the proposed building site have overgrown the area and overhang my property and are in need of some significant pruning. l'm not sure if the new owners ¡ntend to remove these trees during the building phase or not but at a minimum, they need to be cut way back. I also would like to know what the proposed setbacks are for the new homes and if they will conform to the guidelines. What are the proposed locations for the new homes? The diagram included in the notice does not clarify this. I would hope that the setbacks of any new home would be further than 7.5 feet from adjacent property lines. I would also request that a new fence be installed along the east side of my property which would act partially as a privacy fence and would be a minimum of 6 feet tall and composed of cedar with the finished side in toward my property. I would request that a small gate be built on this fence near the SW corner of my property. Since this proposed development is adjacent to my property, I am sure that there will be significant noise, traffic,dustandgeneral disturbanceduringtheconstructionphaseofthisproject. lwouldliketominimize this disturbance as much as is reasonably possible. Thank you for the opportunity to comment on this proposal. Sincerely, Patrick Gearin Attachment 12