Loading...
PLN20170004 Revised Request for Additional Information.pdfCITY OF EDMONDS 121 Sch Avenue North, Edmonds WA 98020 Phone: 42S.771.0220 • Fax: 42S.771.0221 • Web: www.edmondswa DEVELOPMENT SERVICES DEPARTMENT • PLANNING DIVISION fhC. 10" March 17, 2017 James and Julie Rose Email: jamesnrosekgmail.com SUBJECT: REVISED REQUEST FOR ADDITIONAL INFORMATION FOR PROPOSED ACCESSORY DWELLING UNIT LOCATED AT 7219 LAKE BALLINGER WAY FILE NO. PLN20170004 Dear Mr. and Mrs. Rose: After sending you a request for additional information for your land use application for an Accessory Dwelling Unit (ADU) located at 7219 Lake Ballinger Way on March 10, 2017, the Engineering Division has provided a memorandum requesting further information/clarification related to the parking provided on the subject property. As such, please refer to this revised request for additional information, which includes the information/clarification requested in my March 10`s letter plus the additional information/clarification requested by the Engineering Division. Please provide responses to the following items at your earliest convenience so that staff s review of the proposal can continue: 1. Please respond to the following comments related to critical areas: a. A critical areas checklist was completed in 1999 for your property. As part of the City's recent update to our critical areas regulations, critical area determinations are now only valid for five years. Therefore, a new critical areas checklist will need to be submitted for your proposal. Please submit a completed critical areas checklist and associated $50 fee. b. Due to the location of a wetland on and/or adjacent to your property, your proposal is subject to the applicable critical areas code requirements of ECDC Chapters 23.40 and 23.50. In order to determine the feasibility of the proposal, a qualified professional (i.e. biologist) will need to visit your property and prepare a report addressing the applicable requirements of ECDC Chapters 23.40 and 23.50. As part of the qualified professional's assessment, they will need to delineate the wetland on/adjacent to your property and determine its category and required buffer. All proposed improvements will need to be outside of any required buffers and/or a mitigation plan consistent with the above referenced critical areas requirements will need to be provided. If your biologist determines that the project is located within an interrupted buffer due to the location of the existing driveway and/or other improvements, then they will need to adequately document such pursuant to ECDC 23.40.220.C. c. If it is determined during the critical areas reconnaissance that any other critical areas or buffers exist on and/or adjacent to your property, then additional critical areas study may be necessary for your proposal. 2. Several of the dimensions and labels on your site plan are difficult to read due to the size of the lettering. Please either provide a large -format site plan or enlarge all dimensions and labels so that they are legible on the site plan. 3. Your cover letter indicates that the proposed ADU is 835 square feet when including the width of the walls in the calculation, but that measuring the size of the ADU to the interior walls is 45 square feet less. With new construction, the maximum allowed size of an ADU is limited to 800 square feet of livable area. Thus, you can exclude the wall width from the area of the ADU, but this area must be below 800 square feet. Please confirm that the proposed ADU will be consistent with this requirement. 4. Your cover letter addresses the fact that the front door to the ADU is proposed to be on the street side of the addition and that a fence will help to screen this entry from street view. Are you proposing a break in the fence for a walkway connecting the front door of the ADU to the street, or will there be a walkway from the driveway around the southern side of the addition? Please provide additional information on the proposed access to the ADU. A portion of your property lies within the Flood Hazard Area adjacent to Lake Ballinger. Please note that the Building Division may require a professional survey to determine whether or not the project is within the Flood Hazard Area. Such survey is not being required at this time, but you may wish to obtain the survey at this time in order to ensure project feasibility. The Building Division will determine whether the survey is required (as well as any additional information) at the time of their review of the associated building permit application. Any questions related to the Flood Hazard Area may be directed to the Building Division at (425) 771-0220. 6. New Item: Please respond to the enclosed memorandum dated March 13, 2017 from the Engineering Division. If you have any questions on the comments in this memorandum, please contact Jeanie McConnell, Engineering Program Manager at (425) 771-0220 or Jeanie.McConnellkedmondswa.gov. Please submit the above information to the Planning Division as soon as possible so that staff may continue processing your application. Please keep in mind that a complete response to this information request must be received within 90 days or the application will lapse for lack of information (ECDC 20.02.003.D). Thus, your application will expire if the requested information is not received by June I5, 2017. If you have any questions, feel free to contact me at Jen.Machugagedmondswa.gov or (425) 771-0220. Sincerely, Development Services Department - Planning Division Jen Mach uga Associate Planner Enclosure: Memorandum from Jeanie McConnell dated March 13, 2017 Cc: File No. PLN20170004 Page 2 of 2 Date: To: From: Subject: MEMORANDUM March 13, 2017 Jen Machuga, Associate Planner Jeanie McConnell, Engineering Program Manager PLN20170004 — Conditional Use - ADU Rose — 7219 Lake Ballinger Way The comments provided below are based upon review of the application and documents submitted for an accessory dwelling unit at 7219 Lake Ballinger Way. Additional information is requested from the applicant at this time. Please ask the applicant to respond to the following. PARKING The application states a total of 5 parking spaces will be provided on the site. The site plan submitted indicates a total of 4 parking stalls will be provided. Please respond to the following with regards to parking: 1. Dimension parking areas to confirm minimum parking stall dimensions can be met — 8 1/z ft in width by 16 1/z feet in length. 2. Where parking is provided, an on -site turnaround must be present. Vehicles will not be permitted to back out onto Lake Ballinger Way. 3. Clearly show pavement areas on the site plan (both existing and proposed). STORMWATER Stormwater management will be required consistent with Edmonds Community Development Code Chapter 18.30 and the 2014 DOE Stormwater Manual. In general, if the proposed project creates over 2000 square feet of impervious surface area, stormwater management will need to be addressed. This would occur at the building permit phase of the project, but the plans for the ADU should clearly identify existing and proposed impervious surface areas. Thank you. City of Edmonds