Loading...
pln20170021-The Shops at Aurora-Design-E1.pdfY MEMORANDUM Date: May 10, 2017 To: Kernen Lien, Senior Planner From: Jeanie McConnell, Engineering Program Manager Robert Edwards, Stormwater Engineer Subject: PLN20170021 — Design Review—10,000sf Retail Bldg The Shops (a. Aurora Village — 8431 244t" St SW The comments provided below are based upon review of the application and documents submitted for the design review application for the subject development. Additional information is requested from the applicant at this time. Please ask the applicant to respond to the following. 1) The plans indicate a 6-foot walkway connection between the parking lot and the sidewalk along Highway 99. Please confirm with the City of Shoreline (and provide a response in writing to the City) that a walkway in this location is acceptable. The grass area along the property frontage may provide a stormwater benefit that cannot be disturbed/regraded without appropriate design. 2) The subject development falls within the Olympic View Water & Sewer District for water and sewer utilities. Please provide written confirmation that the District finds the proposed development to be feasible with regards to water & sewer availability. STORMWATER REPORT 1. A preliminary stormwater report has been submitted to the City to confirm project feasibility. Please respond to the following: Background This is classified as a Large Project because it involves 1 or more acres of land disturbing activity. Large Project are subject to Small Site Minimum Requirements 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, and 11. City of Edmonds Minimum Requirement #1— Preparation of Stormwater Site Plan Comments 1 and 2 shall be addressed as part of the project feasibility review: 1. Stormwater Report, WWHM page 2: Use Puget East rain gage, not Everett rain gage. This is selected in the project information screen by selecting "Use WSDOT data" 2. Sheet PC-2: Grading to the west of the proposed building will lower the existing grade by about 1-foot. It should be noted that there is high groundwater in this area. Comments 3-10 are provided to assist in a more complete civil plan submittal at time of building permit: 3. Sheet PC-2, CB #1: Cover for the 12" pipe is less than 12-inches. This will require ductile iron pipe. 4. Sheet PC-2, CB #2: Cover for the 12" pipe is less than 24-inches. This will require ductile iron pipe. 5. Sheet PC-2, CB 44: Cover for the 10" pipe is less than 10-inches. This will require ductile iron pipe. 6. Sheet PC-2, The 148 LF 12" storm line has less than 24-inches cover. 7. Sheet PC-2, Control Structure: Specify IE for 10" and specify slope for 10" pipe. 8. Sheet PC-2: 10" outlet pipe from Control Structure is shown as 5=0.5%, yet calculates as 1.0% 9. Sheet PC-2: "Install New CB" at south end of site will require a Type 2 CB due to depth. 10. Sheet PC-2: The connection to the City's MS4 is shown as a Tee. Connections to the City's MS4 are allowed at structures only. Minimum Requirement #2 — Construction Stormwater Pollution Plan Comments: None Minimum Requirement #3 — Source Control of Pollution Comments: None Minimum Requirement #4 — Preservation of Natural Drainage Systems Comments: None Minimum Requirement #5 — Onsite Stormwater Management Comments: None Minimum Requirement # 6 — Runoff Treatment Comments: None Minimum Requirement #7 — Flow Control Comments: None Minimum Requirement #8 — Wetland Protection Comments: None Minimum Requirement #9 — Operation and Maintenance Comments: None Minimum Requirement # 10 — Offsite Analysis and Mitigation Comments: None Minimum Requirement #11— Financial Liability Comments: None City of Edmonds