Engineering has reviewed the subject application and found the information provided is
consistent with Title 18 Edmonds Community Development Code & Engineering standards.
Compliance with Engineering codes and construction standards will be reviewed with the
building permit application for development of the site. Approval of the design review phase
of the project does not constitute approval of the improvements as shown on the submitted
plans.
The following information is provided to assist in the completion of the final design.
Minimum Requirement 91 — Preparation of Stormwater Site Plan
Comments:
1. Sheet PC-2, CB # 1: Cover for the 12" pipe is less than 12-inches. This will require
ductile iron pipe.
2. Sheet PC-2, CB 42: Cover for the 12" pipe is less than 24-inches. This will require
ductile iron pipe.
3. Sheet PC-2, CB 44: Cover for the 10" pipe is less than 10-inches. This will require
ductile iron pipe.
4. Sheet PC-2, The 148 LF 12" storm line has less than 24-inches cover.
5. Sheet PC-2: "Install New CB" at south end of site will require a Type 2 CB due to
depth.
6. Sheet PC-2: The connection to the City's MS4 is shown as a Tee. Connections to the
City's MS4 are allowed at structures only.