MEMORANDUM
November 2, 2018
JoAnne Zulauf, Engineering Technician
Kernen Lien, Environmental Programs Manager
PLN20170059, Clear Vision 2 — Lot Short Plat
18227 — 80t" Avenue West
Civil Review Comments
Please have the applicant address the following items on the civil documents for the above
reference short plat:
1. Native Vegetation Plan:
Monitoring Program: Please provide a monitoring program for the Native Vegetation
Plan. The monitoring program should outline the schedule for site monitoring (for
example, monitoring shall occur in years one, three, and five after site construction),
and how the monitoring data will be evaluated to determine if the performance
standards are being met. A monitoring report shall be submitted as needed to
document milestones, successes, problems, and contingency actions of the
compensation project. The monitoring program for the Native Vegetation Area should
cover a period of five years.
b. Cost Estimate: Please provide an itemized cost estimate covering landscaping materials
and labor for installation. This estimate will be used to determine the bond amount for
the native vegetation area.
2. Construction Entrance: The proposed construction entrance is located in the Native
Vegetation Area. Please relocate the construction entrance outside of the Native
Vegetation Area.
3. Tree Cutting Plan: Please provide a tree cutting plan as required by condition of approval
3.b.iii which states:
A tree cutting plan shall be submitted and approved with the civil plans for removal of
trees impacted by the subdivision improvements. Any tree cutting proposed on the site
that is not a hazardous situation and/or not necessary as part of the subdivision
improvements shall be reviewed at the time of building permit application or through
Pagel of 2
the appropriate land use permit application and review process. All trees that are to be
retained during the development process and trees located on adjacent properties must
be protected according to the performance standards found in ECDC 18.45.050.H. If
during construction it is realized that certain trees that were planned to be retained will
be damaged due to the construction activities, replacement may be required per ECDC
18.45.050. F.
The tree cutting plan should clearing identify the trees that are proposed for removal and
tree protection measures for the trees that are to be retained.