Loading...
pre20100012-Shucks O'Reily.pdfY PRE -APPLICATION MEMO Pre-App Date: July 15, 2010 Applicant: Jessica Iverson jiverson@cmarch.com Property Address: 23005-Highway 99 Type of Construction: Engineering Representative: Jessica, Shucks O'Reily — Auto Parts Store Jeanie McConnell Engineering Program Manager Please find attached a development checklist that is intended to assist with preparation of engineering drawings for a more complete building permit application. The comments are provided from the Engineering Division in review of the conceptual plans for the new Shucks O'Reliy auto parts store at 23005- Highway 99. Additional information or review comments may be precipitated during the review of the preliminary short plat and/or civil plan review. Engineering Handouts, Standard Details and City Code can be found on the City website at www.ci.edmonds.wa.us Please feel free to contact me with any questions you may have by e-mail at mcconnell(�i_)ci.edmonds.wa.us or by phone at 425-771-0220 x1338. Sincerely, Jeanie McConnell City of Edmonds Public Works Department Engineering Division F EDA,, ENGINEERING DEVELOPMENT CHECKLIST ENGINEERING DIVISION PROPERTY NAME Shucks O'Reily PROJECT ADDRESS 23005 Hiahway 99 TYPE OF CONSTRUCTION Auto Parts Store DEVELOPER/APPLICANT Jessica Iverson Email: iiverson(0march.com PRE-APP DATE 07/15/2010 — Applicant not attending ENGINEERING REPRESENTATIVE Jeanie McConnell The following checklist is a reference to assist in preparing engineering drawings for a more complete building permit application. Additional information or review comments may be precipitated during the review of the application. [®] Complete Civil drawings • City of Edmonds Standard Details, Edmonds Community Development Code (ECDC), and handouts are available online at www.ci.edmonds.wa.us • Provide construction sequence and general notes — sample language attached. [®] Drainage report • Drainage system shall be designed in accordance with ECDC 18.30 Storm Water Management and Exhibit "A" Stormwater Supplement. See comments under Storm Drainage below. [®] Traffic Impact Analysis • Refer to and follow the requirements outlined in the ECDC 18.82 and handout E82. [ ®] TOPGRAPHIC DRAWING • Existing and proposed contours (2' or 5' intervals) • Grading plan and quantities of cut and fill. Include quantities for building foundation and provide bottom of footing elevations. [®] STORM DRAINAGE • Chapter 18.30 ECDC Stormwater Management and Exhibit "A" Stormwater Supplement went into effect June 1, 2010. The Code and Supplement are available on the City website — www.ci.edmonds.wa.us — choose the City Government drop down; City Departments; Public Works; Engineering Division and then click on Stormwater Management. • County records indicate project site is 1 acre, which under new storm regulations is considered to be a Large Site Project (Supplement 4.0). Large Site Projects are required to comply with 2005 Department of Ecology Regulations. The Stormwater Site Plan shall include the submittal requirements in the handout, reflect consideration of site planning and design measures intended to reduce project impact on stormwater quality and quantity, and must consider the use of LID approaches. S:IENGRIADDRESS_FILES\AlphalHighway_99-230051PRE20100012-Shucks-OReilylpre20100012-Shucks O'Reily-PRE-APP DEV CHKLIST.doc Page i of Revised 611110 • Low Impact Development: Large Site Projects are required to consider the use of LID techniques and document the decision -making processes used to select their application (Supplement 3.0) • If a detention system is constructed: ✓ Include control structure detail ✓ Manholes- flat top not concentric ✓ Ladders- polypropylene not galvanized ✓ System profile • Projects with over 5000sf impervious area shall be designed by a licensed engineer. • Structural drawings and calculations for concrete vaults (Will be sent out for peer review. Cost shall be pass through) • Footing drains, if required per the Building Code or by the Geo-Tech shall connect to outfall of detention system. • Provide RIM and invert elevations for all existing and proposed storm structures. • Storm Development Charge — calculation is based upon impervious surface area. • Department of Ecology (DOE) — Construction Stormwater General Permit "Notice of Intent" (NOI) for sites with the potential to disturb one or more acres of land. If needed the construction site operator must contact DOE and apply for a permit 60 days prior to discharging stormwater. A handout is available at the counter. • Department of Ecology (DOE) — Industrial Stormwater General Permit "Notice of Intent" (NOI) for sites with the potential to add pollution to surface waters from industrial activities. Needs to contact DOE and determine if the permit is required. A brochure is available at the counter. • Jerry Shuster is the City's Stormwater Engineer Program Manager. Jerry can be reached by e-mail at shuster(a),ci.edmonds.wa.us or by phone at 425.771.0220 x1323. [®] SITE ACCESS ❑ Existing ❑ Downtown business area ✓ Alley access required ® All other areas ✓ Street access ✓ Proposed access points must meet AASHTO sight distance requirements. ✓ Access on 230t" St SW may be limited to right turn in, right turn out, if approved. Traffic analysis will need to provide assessment of this access point. • Driveway Approach - Access Width ✓ 30' standard width for commercial ✓ 24' minimum for 2-way traffic • Access Road ✓ 12% max slope, waiver up to 15% per ECDC ✓ Cross slope: 4% max • Driveway/Access Slope ✓ 14% max slope, waiver up to 20% per ECDC ✓ 6% landing area for the first 20'. S:IENGRIADDRESS_FILESWphalHighway_99-230051PRE20100012-Shucks-O'Reilylpre20100012-Shucks O'Reily-PRE-APP DEV CHKLIST.doc Page 2 of 9 Revised 6/1/10 [Q FRONTAGE IMPROVEMENTS ® Existing • Remove and replace existing curb, gutter & sidewalk sections as needed to construct proposed driveway approaches to City standards. Reference and include City standard details in plan set. • Remove and replace existing sidewalk, curb & gutter currently failing or damaged. during the course of construction, per City standards and as required per City inspector • Remove and replace curb ramps along frontage of property to bring into ADA compliance. Truncated domes are required at all street intersections, but will not be required at the driveway approaches for the subject development. ❑ Curb and Gutter ❑ 16" concrete vertical: only to match exist. ® Standard — match existing ❑ Major arterial: 24" CI All other roads: 18" ❑ High traffic load gutter and commercial type radii ✓ When alley is used as access ✓ 10 vehicles or more (outside of downtown business area) ❑ Roadway widening ❑ Widen travel lane to 12' from painted centerline to the face of the curb ❑ Provide additional storm improvements as required ® Sidewalks • RM, B, C: 7-10' wide • Tree cutouts shall be 3' x 3', placed at the curb side and have approved ADA grates. • Thickness of sidewalks shall be 5-1/2". Thickness at driveway approach shall be 6". • Specify type of curb ramps to be used. Reference and include City standard details in plan set. • Truncated domes are required on all curb ramps at intersections. ❑ Alleys • Pave or overlay full width adjacent to property. Limits of paving will vary depending upon location of site to nearest cross street. [®] PARKING LOTS/PARKING GARAGES/OPEN PARKING AREAS • Site distance triangle requirements ✓ Buildings; provide a site window or clear area to insure line -of -sight. ✓ Landscaping near entrances shall be restricted to 3' in mature height to ensure adequate sight distance. ❑ Above ground ✓ Drive aisles for 2-way traffic shall be 24 feet wide. ✓ Drive aisles for 1-way traffic shall be a minimum of 12 feet wide. ✓ Please refer to Fig 18.1, found in Title 18 of the ECDC for additional parking lot layout requirements specific to angled parking. ✓ Must be able to show/demonstrate all required full size (8.5' x 16.5') parking stalls can be obtained within the aggregate parking area. If this can be demonstrated the ECDC will allow for up to 50% of the stalls to be reduced width (8' x 16.5'). ✓ Parking layout between light post or other structures is measured from the inside and not the center of the structure. ✓ Maximum parking lot slopes is 6%. S:IENGRtiADDRESS-FILES1AlphalHighway_99-230051PRE20100012-Shucks-0Reilylpre20100012-Shucks0'Reily-PRE-APP DEVCHKLIST.doc Page of Revised 6/1110 [®] ELECTRICAL POWER SOURCE • Show location of pad mounted transformer, to be located on private property. • Underground Wiring Requirements [❑] SHORING PLAN (if applicable) • Plan • Soil nailing not permitted in right-of-way. • Indicate erosion control measures to insure soil stability. • Provide calculations • May be sent out for peer review. Cost shall be pass through. [❑] RETAINING WALLS/MODULAR BLOCK WALLS • Follow Handout B-62 • Provide drawings and calculations (If sent out for peer review, cost shall be pass through). [®] WATER SERVICE ® City of Edmonds Customer • Water Connection Fee will be required for new services. • Cross Connection Control, City contact: Linda McMurphy — 425,771.0235 • Domestic ✓ Lines >2" require an RPBA and hot box. ✓ Domestic lines shall not be used for both domestic and fire sprinkler protection unless approved by the Fire Department, Public Works and Engineering. ✓ Backside of water meter to be located at property line. • Irrigation ✓ Show separate irrigation meter. ✓ Show location of backflow assembly on private property immediately after the meter. ✓ Irrigation Sprinkler Permit to be obtained from Public Works. Contact Linda McMurphy at 425-771-0235. [®] SANITARY SEWER ® City of Edmonds Customer • Location of sanitary side sewer and lateral to be determined and incorporated into plan set prior to building permit submittal. If owner proposes to reuse existing sewer lateral: Owner will be responsible for TV'ing existing line to determine it's condition and provide a copy of the TV record to the City Public Works Department for final approval and acceptance. • Likewise, the sanitary sewer lateral (from City sewer main to property line) will need to be TV'd by City Public Works Department to determine it's condition for re -use. • Cleanouts: required at property line, at edge of easement and at the end of the run. Locking Cl lamphole covers shall be installed at property line and when located in hard surfaces. Cleanouts shall be placed a maximum of 100' apart when the lateral length exceeds 100 feet. S:IENGRIADDRESS_FILESVIIpha\Highway_99-230051PRE20100012-Shucks-O'Reilylpre20100012-Shucks O'Reily-PRE-APP DEV CHKLIST.doc Page 4 of 9 Revised 611110 [®] RECYCLE/TRASH ENCLOSURE • City Contact: Recycling Coordinator Steve Fisher — 425.771.0235 • Refer to Handout E-37. • Gate shall be full swing, concrete pad required. • Enclosure to be accessible by garbage hauler. • NO UTILITIES (I.E. GAS METERS, POWER, ETC) SHALL BE PLACED WITHIN THE ENCLOSURE [®] EROSION CONTROL • Erosion and discharge of sediments and other pollutants into receiving waters during construction shall be prevented. • Developer is responsible for implementation and maintenance of erosion control measures. • ESC standard details shall be placed on drawing. [®] STAGING/LAYDOWN AREA • Show location of job site fencing, job trailer, materials storage, etc. on site. [®] TRAFFIC CONTROL PLAN and HAUL ROUTE PLAN [®] DISRUPTION FEES: • Disruption fees will be assessed when any activity occupies or closes parking spaces/lanes or other paved areas, sidewalks, or alley for more than 72 hours. ✓ Sidewalk ✓ Parking spaces ✓ Alley [®] RIGHT-OF-WAY CONSTRUCTION PERMIT • A right-of-way construction permit is required for all work within the City right-of-way. • Street disruption fees may apply if street has been overlaid within the last 5 years. • Contractor is required to have an active state contractors license as well as City business license. [®] COST ESTIMATE, BONDING and 2.2% Inspection Fee; ® Provide an itemized estimate for both on -site and off -site (right-of-way) improvements, including traffic control. The amount of the bond will be based on 120% of the City approved estimate for the off -site improvements. ® The 2.2% inspection fee is based on 120% of the City approved estimate for the entire project improvements. [®] OTHER ❑ Easements ❑ Right-of-way dedications NOTES: Storm, Water and Sewer maps are provided as a graphical representation of existing utilities. Actual utility locations are to be verified by the owner/applicant. SAENGRLADDRESS_FILES7AlphalHighway_99-230051PRE20100012-Shucks-O'Reilylpre20100012-Shucks O'Reily-PRE-APP DEV CHKL[ST.doc Page 5 of 9 Revised 611110 GENERAL NOTES 1. ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY OF EDMONDS STANDARD PLANS AND DETAILS, THE FOLLOWING SPECIFICATIONS AND CODES, AND ALL OTHER APPLICABLE LOCAL MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND REGULATIONS: - CURRENT INTERNATIONAL BUILDING CODE (IBC) 2010 WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION - WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN (CURRENT EDITION) 2. STANDARD PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS REFER TO CITY OF EDMONDS STANDARD DETAILS, UNLESS NOTED OTHERWISE 3. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBSITE WHENEVER CONSTRUCTION IS IN PROGRESS. 4. DEVIATIONS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE LOCAL GOVERNING AUTHORITY. 5. CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF "AS -BUILT" DRAWINGS AND SHALL SUMMARIZE ALL AS -BUILT CONDITIONS ON ONE SET OF REPRODUCIBLE DRAWINGS FOR SUBMITTAL TO THE OWNER PRIOR PROJECT COMPLETION AND ACCEPTANCE. A SET OF AS -BUILT DRAWINGS SHALL BE SUBMITTED TO THE CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING OCCUPANCY/FINAL PROJECT APPROVAL. 6. ELEVATIONS SHOWN ARE IN FEET. SEE SURVEY FOR BENCHMARK INFORMATION. 7. THE LOCATIONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN HEREON HAVE BEEN FURNISHED BY OTHERS BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO FURTHER DISCOVER AND PROTECT ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. CONTRACTOR SHALL VERIFY LOCATION, DEPTH, SIZE, TYPE AND CONDITION OF EXISTING UTILITY LINES AT CONNECTION OR CROSSING POINTS BEFORE TRENCHING FOR NEW UTILITIES. ENGINEER ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE EXISTING UTILITIES AND SITE FEATURES PRESENTED ON THESE DRAWINGS. ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF CONFLICTS THAT ARISE. 8. CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES DURING CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND UTILITIES LOCATION SERVICE (1-800-424-5555) AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. 9. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING WORK AND SHALL NOTIFY OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES. 10. PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD CONDITIONS. 11. CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT S:IENGRIADDRESS_FILESWphalHighway_99-230051PRE20100012-Shucks-CrReilylpre20100012-Shucks O'Reily-PRE-APP DEV CHKLIST.doc Page 6 of Revised 6/1/10 (WHERE APPLICABLE) AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE CONTENTS THEREOF. ALL SITE WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT, 12. STRUCTURAL FILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE RECOMMENDATIONS OF THE PROJECT GEOTECHNICAL REPORT. 13. MANHOLES, CATCH BASINS, UTILITIES AND PAVEMENT SHALL BEAR ON MEDIUM DENSE TO VERY DENSE NATIVE SOIL OR COMPACTED STRUCTURAL FILL. IF SOIL IS DISTURBED, SOFT, LOOSE, WET OR IF ORGANIC MATERIAL IS PRESENT AT SUBGRADE ELEVATION, REMOVE AND REPLACE WITH COMPACTED STRUCTURAL FILL PER GEOTECHNICAL REPORT. 14. SEE SURVEY AND ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND LOCATIONS OF BUILDINGS, LANDSCAPED AREAS AND OTHER PROPOSED OR EXISTING SITE FEATURES. 15. SEE ARCHITECTURAL DRAWINGS FOR PERIMETER FOUNDATION DRAINS. FOUNDATION DRAINS SHALL BE INDEPENDENT OF OTHER SITE DRAIN LINES AND SHALL BE TIGHTLINED TO THE STORM DRAIN SYSTEM WHERE INDICATED ON THE PLANS. 16. ALL REQUIRED STORMWATER .FACILITIES MUST BE CONSTRUCTED AND 1N OPERATION PRIOR TO INSTALLATION OF ANY PAVEMENT UNLESS OTHERWISE APPROVED BY THE ENGINEER. 17. ALL ROOF DRAINS, PERIMETER FOUNDATION DRAINS, CATCH BASINS AND OTHER EXTERNAL DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS NOTED OTHERWISE. 18. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL SITE IMPROVEMENTS INDICATED ON THESE DRAWINGS. 19. AS A MINIMUM REQUIREMENT, ALL DISTURBED AREAS ON AND OFF SITE SHALL BE RETURNED TO THE EQUIVALENT OF THEIR PRECONSTRUCTION CONDITION IN ACCORDANCE WITH APPROPRIATE REQUIREMENTS AND STANDARDS. 20. ALL DISTURBED SOIL AREAS SHALL BE SEEDED OR STABILIZED BY OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. SEE EROSION CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL REQUIREMENTS. 21. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL. 22. THIS PROJECT IS NOT A BALANCED EARTHWORK PROJECT. BOTH EXPORT AND IMPORT OF SOIL AND ROCK MATERIALS ARE REQUIRED. 23. SLOPE OF FINISHED GRADE SHALL BE CONSTANT BETWEEN FINISHED CONTOURS OR SPOT ELEVATIONS SHOWN. 24. FINISHED GRADE SHALL SLOPE AWAY FROM BUILDING WALLS AT MINIMUM 5% SLOPE FOR A MINIMUM DISTANCE OF 10 FEET. 25. CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN SHORING AND BRACING AS NECESSARY TO PROTECT WORKERS, EXISTING BUILDINGS, STREETS, WALKWAYS, UTILITIES AND OTHER EXISTING AND PROPOSED IMPROVEMENTS AND EXCAVATIONS AGAINST S:IENGRV4DDRESS_FILESUAlphaWH gh y_99-230051PRE20100012-Shucks-O'Reilylpre20100012-Shucks O'Reily-PRE-APP DEV CHKLIST.doc Page 7 of 9 Revised 6/1A0 LOSS OF GROUND OR CAVING EMBANKMENTS. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REMOVAL OF SHORING AND BRACING, AS REQUIRED, 26. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY AND FOLLOW CITY PROCEDURES FOR ALL WATER SERVICE INTERRUPTIONS, HYDRANT SHUTOFFS, STREET CLOSURES OR OTHER ACCESS RESTRICTIONS. CONTRACTOR SHALL NOT RELOCATE OR ELIMINATE ANY HYDRANTS WITHOUT FIRST OBTAINING WRITTEN APPROVAL FROM THE FIRE MARSHAL. 27. COORDINATE AND ARRANGE FOR ALL UTILITY CONNECTIONS, UTILITY RELOCATIONS AND/OR SERVICE INTERRUPTIONS WITH THE AFFECTED OWNERS AND APPROPRIATE UTILITY COMPANIES. CONNECTIONS TO EXISTING UTILITIES SHALL BE MADE ONLY WITH ADVANCE WRITTEN APPROVAL OF THE AUTHORITIES GOVERNING SAID UTILITIES. 28. EXISTING UTILITY LINES IN SERVICE WHICH ARE DAMAGED DUE TO CONSTRUCTION WORK SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE AND INSPECTED AND ACCEPTED BY CITY OF EDMONDS AND OWNER'S REPRESENTATIVE PRIOR TO BACKFILLING. 29. NEW UTILITY LOCATIONS ARE GENERALLY SHOWN BY DIMENSION, WHERE NO DIMENSIONS ARE INDICATED, LOCATIONS MAY BE SCALED FROM DRAWINGS. FIELD ADJUSTMENTS SHALL BE APPROVED BY OWNER'S REPRESENTATIVE AND CITY. 30. WHERE NEW PIPE CLEARS AN EXISTING OR NEW UTILITY BY 6" OR LESS, PLACE POLYETHYLENE PLASTIC FOAM AS A CUSHION BETWEEN THE UTILITIES. 31. SEE MECHANICAL DRAWINGS (WHERE APPLICABLE) FOR CONTINUATION OF SITE UTILITIES WITHIN THE BUILDING. 32. SEE ELECTRICAL DRAWINGS (WHERE APPLICABLE) FOR EXTERIOR ELECTRICAL WORK. 33. SEE LANDSCAPE DRAWINGS (WHERE APPLICABLE) FOR SITE IRRIGATION SYSTEM. S:IENGRIADDRESS_FILES1AIphalHighway_99-230051PRE20100012-Shucks-O'Reiiylpre20100012-Shucks O'Reily-PRE-APP DEV CHKLIST.doc Page 8 of 9 Revised 611110 CONSTRUCTION SEQUENCE NOTES 1. SCHEDULE A PRE-CONSTRUCITON MEETING WITH CITY ENGINEERING DIVISION AT 425-771-0220, EXT. 1326. 2. REVIEW ESC NOTES. 3. CALL FOR UTILITY LOCATES. 4. INSTALL ESC MEASURES AND MAINTAIN DUST CONTROL. 5. HAVE EROSION CONTROL MEASURES INSPECTED BY CITY OF EDMONDS CITY ENGINEERING INSPECTOR. (ALL TEMPORARY SEDIMENTATION AND EROSION CONTROL MEASURES MUST BE IN PLACE AND INSPECTED PRIOR TO ANY CONSTRUCTION OR SITE CLEARING. EROSION AND SEDIMENTATION CONTROL PRACTICES AND/OR DEVICES SHALL BE MAINTAINED UNTIL PERMANENT VEGETATION IS ESTABLISHED.) 6. ROUGH GRADE SITE AS REQUIRED TO INSTALL DRAINAGE FEATURES. 7. DEMOLISH EXISTING STRUCTURES 8. CLEAR, GRUB & ROUGH GRADE REMAINDER OF SITE. REVEGETATE DISTURBED AREAS NOT SUBJECT TO ADDITIONAL SURFACE DISTURBANCE IMMEDIATELY AFTER ROUGH GRADING. (OTHER EXPOSED AREAS SHALL BE STABILIZED PER EROSION CONTROL NOTES BELOW) 9. INSTALL UTILITIES AND OTHER SITE IMPROVEMENTS. 13. STABILIZE AND REVEGETATE ENTIRE SITE. 14. ESTABLISH LANDSCAPING AND PERMANENT VEGETATION. EROSION CONTROL FEATURES CAN BE REMOVED UPON FINAL SITE STABILIZATION AND APPROVAL BY CITY INSPECTOR. S:IENGRIADDRESS_FILESWIphalHighway_99-230051PRE20100012-Shucks-O'Reilylpre20100012-Shucks O'Reily-PRE-APP DEV CHKLIST.doc Page 9 of 9 Revised 611/10 City of Edmondsrf7 Public Works / / / / / / / / / / / / / / / / / SHT 16 SEC3Y/ ; 23005 / / / / / / / / / , 16.28 / / / / / 1 -z . / / , Hi6-15 / 62 PSI Water Utility 25, 5 100 150 200� F tCAP E-Works600k r l City of Edmonds f 121 Sth Ave N Edmonds, WA 98020 d Map Data Published June 2010 This document is for general information purposes only and is provided on an'as Wand 'as available' basis. The data used comes from a variety of public sources and no warranty of any kind is given as to its accuracy. Users of this document agree to indemnify and save harmless the City of Edmonds, its officials, officers, employees and/or agents from and against any claim, demand or action, arising out of any use or possession of this document. H16-15A 0 PSI Buildings shadowed No Shadow H16-20 70 PSI 22921 23 31 16-33C H16-1158 0 PSI i N CK city Hydrants n EDMONDS ® Waterllk,woffs ULYNNWOOD Q Water Alr Vac ]MOUNTIAKE TERRACE 14 Water PRV �__-...1 MUKILTEO Water Tanks (Gallons) �WOODWAY — 3,500,000 1,500,000 Non City Points 0 VALVE i) AIRVAC ;y BLOWOFF Cl TANK CX HYDRANT Water Main reees Edmonds Top ineas Edmonds Overlap s000n Edmonds Q Private or Fireline = Non City Lines - - - Mapbook_Sections Mapbook Sections_2008 Edmonds Pavement Arterial Driveway and Parking Secondary WP(1fV--, Printed: 7/15/2010 9:57:08 AM SHT 16 SEC 31 �o0 p29 0 25 % 50 100 150 200 E-Works600k t City of Edmonds 1215th Ave N Edmonds, WA 98020 i I Ell 1, Map Data Published June 2010 This document is for general information purposes only and is provided on an 'as is' and'as available' basis. The data used comes from a variety of public sources and no warranty of any kind is given as to its accuracy. Users of this document agree to indemnify and save harmless the City of Edmonds, its officials, officers, employees and/or agents from and against any claim, demand or action, arising out of any use or possession of this document . 22921 230TH 23005 23 31 p CLEAN UT • LIFT Q MANHOLE METER Q NONCITYCLEANOUT • NON CITY MANHOLE ® RESTROOM 0 VAULT GRINDER_PUMPS Sewer Lines FORCED -GRAVITY -OUTFALL Non City Sewer LIFT; NON CITY LIFT 0 MANHOLE; NON CITY MANHOLE ,) NONCITYCLEANOUT m Non CitySewer Main Blowoffs - - - Mapbook_Sections Mapbook Sections_2008 Edmonds Pavement Arterial Driveway and Parking Secondary Shadowed No Shadow Green Space City EDMONDS [_] LYNNWOOD MOUNTLAKE TERRACE U MUKILTEO -j WOODWAY a ,�bwo, Printed: 7/15/2010 9:S8:46 AM 16-118 / � 16-117City of Edmonds r■ / / - R-440 22921 Public Works IS 16-430 / L■16-431 / 16-272 / 16-429 8 ■ / ■ 230y1w COUNTY COUN36 ■ / �16-428 ■ ■16-116 16-427 16-109 t016-115 SHT 16 SEC 31 / / ' 23 31 / 16-107 / ■IM16-108 16-279 16-1 ' ?3 / ?9 / / / N / / / 0 25 / 50 100 150 200 Feet F-WorksBook S109-0 City of Edmonds 1215th Ave N Edmonds, WA 98020 storm Utility Buildings ■ TYPeI Shadowed o Type 11 NOShadow C — e CULVERT Green Space storm Unes City Map Data Published June 2010 tttttta Main ;J EDMONDS _ r �LYNNWOOD This docume nt is for general information purposes only overlap MOUNTLAKE TERRACE and is provided on an'as is' and'as available' basis. `—Ditch and Creek _1 MUKILTEO The data used comes from a variety of public sources C-1 Detention ponds I . .I WOODWAY and no warranty of any kind is given as to its accuracy. - - - Mapbook_Seclions Users of this document agree to indemnify and save Mapbook Sections_2008 harmless the City of Edmonds, its officials, officers, Edmonds P—rner t employees and/or agents from and against any claim, Arterial demand or action, arising out of any use or possession Driveway and Parking of this document . Secondary Printed: 7/15/2010 9:54:09 AM FE LJ Ul M c 0 W 0 V a s a 70 z �0 a 7 0 u 3 z i az g �o 0 y LL z 0 a m • i 9 0 0, z 3 0 Q O �Q ge 0 U Q A O i O u W , z Q`t I 9 W a 0 z in Y., 04 • Norl"F NA , WAR A map Was o CF ACCU f A,e ��led for use by ACy he Info cr s; r _ cr;; „(fort,'r 0,"thFtY of Edmon sthe c/tyOf Edm `tm inns- , map• does not , r'radel�t Anypersop nt�r1c, d, but not limited a tY rear o . l G ��' slr:: Slu,':,� may mited to the y the Info,,;, C? ofhLu ,_. bc. li�� r' Neltbe, themaYnot locatlorr of rep,Se:.:,1 4(,le for uuor; ro�� theintor,n lty of Edmond may te)j,., ,r 2 3 o T H S r sw or, Bald map s map, nor fopsy or,