PRE20190001_PlanningComments.pdfop EDP CITY OF EDMONDS 12151" Avenue North • Edmonds, WA 98020 ��c 1890 Phone: 425.771.0220 • Fax: 425.771.0221 • Web: www.edmondswa.90v DEVELOPMENT SERVICES DEPARTMENT: PLANNING DIVISION Pre -Application Meeting Date: February 21, 2019 Review By: Michele Szafran, Planner Project Name: 3-lot plat Site Address: Not Addressed (AF# 0513300002217) Zone: RS-12 Contact: Norman Ferkingstad, 206-240-9114, namron@comcast.net Introduction The application materials indicate a 3-lot plat of an RS-12 zoned vacant lot. The subject property was included in previous lot line adjustment with the property to the south (AF#201712055007). The lot line adjustment resulted in a gross area of 53,125 square feet and a net area of 49,821 square feet. The following Planning Division comments are based on a short plat of the property, pursuant to ECDC 20.75. Proposed Use The applicant is proposing a 3-lot short plat of one parcel located along the east side of 72nd Ave. W, south of property address 15719 72nd Ave. W. The site is zoned RS-12 (Single-family Residential; 12,000 square foot minimum lot size). Based on the recorded lot line adjustment the parcel is approximately 1.22 acres (53,125 square feet). The RS-12 zone allows a maximum density of 3.7 dwelling units per acre, so the maximum number of units that could be permitted on the site is 4 (3.7 dwelling units * 1.22 acres). The proposed 3-lot short plat is consistent with the allowed uses in the RS-12 zone. General Comment The current site plan does not referenced the lot lines as approved under the recorded Lot Line Adjustment (AF#201712055007). Please verify that new deeds for each of the parcels has been filed with Snohomish County. The County may not consider the lot line adjustment to have been completed until this has been done. The short plat must reflect accurate lot lines as provided in a title report. Page 1 of 4 General Development Standards for the Zone Setbacks: Per ECDC 16.20.030, the RS-12 zone requires the following property line setbacks: Street setback is 25 feet Side setback is 10 feet Rear setback is 25 feet Flag lots use all side setbacks. Note: Setback and lot area comments below assume access to lots via a shared driveway from 72"d Ave. W. Parcel a and C would be considered flag lots. Please note the following corrections to the setbacks (based on the site plan provided) • Parcel A will have street setback from 72nd Ave. W, rear setback from the eastern property line (25 feet) and side setbacks from the access easement and the southern property boundary (10 feet) Parcel B and C will be flag lots with all side setbacks (10 feet). Note that per the site plan the setback along the eastern property boundary of Parcel C would be taken from the access easement. Retaining walls: Please note that retaining walls exceeding three feet over original grade must comply with zoning setbacks. Lot Area: Lots in the RS-12 zone must contain a minimum of 12,000 square feet. Lot area excludes street rights -of -way and access easements. The total gross lot area provided on the Lot Line Adjustment is 53,125 square feet. The short plat will need to accurately show the property boundary. As currently proposed using the before LLA squire footage the gross lot area is indicated on all of the lots, all of which exceed 12,000 square feet. However, all of the lots will have access easement area that must be removed from the gross lot area. The net lot area for Parcel A and B will need to deduct the access easement area and will to meet a 12,000 minimum net lot area. The easement area along the eastern property boundary of Parcel C will also need to be deducted from the gross lot area of Parcel C. Lot Coverage: There is a 35% maximum lot coverage in all Single Family Residential zones. Coverage is defined as: Coverage means the total ground coverage of all buildings or structures on a site measured from the outside of external walls or supporting members or from a point two and one-half feet in from the outside edge of a cantilevered roof, whichever covers the greatest area. Coverage will be verified during the building permit review for each of the lots. Lot Width: RS-12 requires a minimum lot width of 80'. It appears that all of the proposed lots in the preapplication materials would comply with the minimum lot width of the RS-12 zone. Page 2 of 4 Height: The maximum height of structures within the RS-12 zone is 25 feet. Accessory structures may be a maximum of 15 feet high. Note that height is measured from undisturbed soil. This means the height calculations will be determined from the site contours that exist prior to any grading associated with the subdivision. Parking: Two on -site parking spaces are required for all new single family residential construction. This requirement will be verified during building permit review for the individual lots. Environmental Regulations Critical Area Determination: A determination will need to be applied for as one has not been completed for the subject site. Native Vegetation Requirement: ECDC 23.90.040.0 requires the retention of a minimum of 30 percent of native vegetation on undeveloped (or redeveloped), subdividable lands zoned as RS- 12. This standard for development shall apply to all undeveloped (or redeveloped), subdividable lands zoned RS-12 or RS-20 that contain a landslide hazard; a stream or stream buffer; or a wetland or wetland buffer, except for as provided in subsection (C)(4) of this section. This is meant to provide additional protection for fish and wildlife habitat throughout Edmonds. The vegetation management plan could include a combination of retaining existing native trees and vegetation and/or new landscaping consisting of native plants. Any native species will be acceptable provided that a lawn may not count towards the 30% area. The plan must show where the 30% native vegetation area will be located on the site (it does not need to be provided in one contiguous location), specify the native species that will be retained and/or planted within the area, specify any nonnative vegetation that will be removed, and establish ongoing maintenance activities for the native vegetation area. The vegetation management plan must be approved by the Planning Division prior to final approval of the subdivision. The application materials must indicate which areas will be established as the native retention area. A vegetation management plan showing how the requirements of ECDC 23.90.040.0 will be met may be reviewed as part of the civil review. Design Standards within Erosion and Landslide Hazard Areas: A geotechnical report will be required with the application. A geotechnical report has been provided for the pre-app meeting and appears to comply with and address the criteria in ECDC 23.80.060 and .070. Its unclear how much grading will be associated with the proposal at this time, please note that the amount of grading should be minimized and designed to the standards referenced below. ECDC 23.80.070.A.4 contains design standards within erosion and landslide hazard areas. A couple of these design standards include: c. Structures and improvements shall minimize alterations to the natural contour of the slope, and foundations shall be tiered where possible to conform to existing topography; Page 3 of 4 f. The use of retaining walls that allow the maintenance of existing natural slope area is preferred over graded artificial slopes; ECDC 20.75.085.A (subdivision environmental review standards) also provide: 1. Where environmental resources exist, such as trees, streams, ravines or wildlife habitats, the proposal shall be designed to minimize significant adverse impacts to the resources. Permanent restrictions may be imposed on the proposal to avoid impact. 2. The proposal shall be designed to minimize grading by using shared driveways and by relating street, house site and lot placement to the existing topography. SEPA Review: Within the City of Edmonds, SEPA review is required for any subdivision creating more than four lots or lands covered by water. It appears that SEPA will not be required for this proposal. Plat Processes The plat process occurs in multiple steps. Below are the steps, estimated time frame for each step and decision maker. 1. Preliminary Plat Approval; 3 —4 months; Staff a. Following preliminary approval, the applicant has five years to achieve final plat approval. 2. Civil Review; 3 — 4 months; Staff a. Once the Civils are approved, the required improvements must be either be completed or bonded for prior to submitting for final. 3. Final Plat; 1— 2 months; Staff 4. Following the recording of the final plat, building permits for residences maybe submitted for the individual lots. 2019 Fee Schedule (other fees will apply for inspections, connections, impact fees, etc.) 1. Preliminary Plat o $2,930.00 Application fee o SEPA - $670 (if applicable) o Technology Fee - $35 2. Civil plan review - $2,785.00 3. Final plat - $1,440.00 plus recording fees for recording the plat at Snohomish County ($158 plus $1 for each additional page) Page 4 of 4