PRE-AP (Valenti questions)_12-6-16 (2).pdfPre -Application Meeting — Project Questions December 8, 2016
Valenti — Academy of Music and Dance
Project address: 23931 Highway 99 Edmonds, WA.
Land Use Questions:
• Please address any possible requirements for parking, street frontage, density and possible other
land use requirements for the proposed project.
Buildinq Code Questions (2015 IBC assumed):
• Will the project be considered a substantial alteration?
• Building construction type is assumed to by Type VB. Please confirm.
• Discuss and confirm existing building occupancies. The current and proposed ground floor is
used for offices so a "B" occupancy is assumed. The current main floor occupancy use is retail
and so an "M" occupancy is assumed. Please confirm.
• Change of occupancy is proposed for the main floor. It is proposed that the occupancy change to
either "E" (Educational — Day Care) -- OR -- A-2 (Assembly — Dance Hall). Please discuss and
confirm.
• Confirm sprinklering "threshold" requirements for project.
• Confirm fire separation requirements for project.
• Confirm requirements for maximum travel distance to exit discharge for project.
• Confirm maximum floor area per occupant (occupant load) requirements for project.
• Other building code requirements?
Accessibility (ADA) requirements:
• Please discuss
WA. State Energy Code requirements:
• Please discuss
PRE -AP (Valenti questions)_12-6-16 12/8/16 1