Loading...
Pre-App Eng Comments.pdfof EDP CITY OF EDMONDS 01 PRE -APPLICATION COMMENTS ENGINEERING DIVISION Fst. is90 (425) 771-0220 City Website: wwwxi.edmonds.wa.us DATE: February 28, 2008 TO: Larry Danberg FROM: Jeanie McConnell, Engineering Program Manager RE: Pre -Application Meeting, February 28, 2008—1:30pm Project: Biodiesel Fueling Station Project Address: 7601 244"' St SW The following comments are provided from the Engineering Division in review of the conceptual plans for the Biodiesel Fueling Station. Additional information or review comments may be precipitated during the review of the application. 1. As shown, two-way traffic will flow around the perimeter of the existing building. Drive aisles for 2-way traffic shall be 24' wide. 2. Will the existing parking stalls along the east side of the existing building be provided in an alternate location or simply removed? All required parking stalls shall be 8 V2' x 16 '/z', per City standards. 3. All materials will need to be stored on site. 4. A haul route plan will need to be provided. 5. A temporary erosion and sedimentation control plan will need to be provided. Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us with any questions you may have related to your proposed project.. I look forward to working with you.