Pre-application meeting form.pdfPRE -APPLICATION MEETING
SUBMITTAL REQUIRMENTS
PERMITTING & DEVELOPMENT
121 5th Avenue N
P: 425.771.0220
OPTION 1
❑ FORMAL PRE -APPLICATION MEETING
(SEE BACK PAGE)
$1,000.00 (1/2 will be applied toward the future
permit submittal)
Staff from the Building, Planning, Engineering and
Fire Departments attend the meeting, provide written
comments and answer questions regarding the
proposed project. This meeting is encouraged for
major projects prior to a formal application submittal
to the City. The goal is to identify MAJOR issues and
discuss processing procedures applicable to the
project.
Submit 1 set of plans with required information per
page 2.
NOTE: PRE-APP Meetings are scheduled for the next
available date with a minimum of two weeks lead
time & DRC Meetings a minimum of one week.
OPTION 2
® DEVELOPMENT REVIEW COMMITTEE MEETING
Complementary, informal meeting
This is an informal opportunity to meet with staff
and discuss your preliminary ideas and concepts
for a project. The intent is to help identify the
major code requirements that will need to be
addressed and any significant site development
issues that may relate to the project. The intent is
for this to occur prior to considerable investment
in plans and/or design work. You may wish to
have your design professional(s) accompany you.
Submit 1 set of the following:
1) Site Plan
2) Vicinity Map
3) This completed form
4) Pertinent background information
5) Floor plans if applicable
6) List of questions regarding your proposed project
COMPLETE ALL REQUESTED INFORMATION
Property Owner:
Applicant/ Contact:
Calvary Chapel Edmonds/Lynnwood
Josef
Schneider
Mailing Address:
Mailing Address:
8330 212th St. SW
8703
191st PL SW
City:
State:
Zip:
City:
State:
Zip:
Edmonds
WA
98026
Edmonds
WA
98026
Phone:
Fax:
Phone:
Fax:
425-672-4377
206-423-5690
425-361-7395
Email:
Email:
joeldavidmeyer@icloud.com
Josef@schneider—elec.com
Zoning: Comm. Lot Size: 85, 517
Sno County Tax Account Parcel #: 00467400000601
SiteAddress(s). 8330 212th St. SW, Edmonds, WA 98026
Existing Use/Occupancy:
Church
Pre -Submittal for: ❑ Building Permit Only ❑X Land Use Approval/ Permit
Description of Project: Add a 20'X 22' (approx.) addition on the SE face of
the children's ministry building for a shop.
Revised on 0110412017 Page 1 of 2
PRE -APPLICATION MEETING
SUBMITTAL REQUIRMENTS
"7C. 194-
PERMITTING & DEVELOPMENT
121 5th Avenue N
P: 425.771.0220
All major projects are highly encouraged to schedule a formal Pre -Application Meeting with the
Development Services Department prior to making a formal application submittal to the City. The goal
of the meeting is to identify MAJOR issues and processing procedures applicable to the project which
are helpful for an applicant to determine feasibility, design issues, timing, and various processes required
for a project. The fee is $1,000.00, but one half of this fee will be applied toward the future permit
submittal.
A Pre -Application Meeting is Not a Permit Application Submittal.
Staff from the Building, Planning, Engineering,
and Fire Departments attend the meeting,
provide written comments and answer
questions regarding the project.
Pre -application meetings are held on
Thursdays at 1:30 & 3:00 p.m. To make an
appointment, bring 1 set of folded plans with
pertinent information and the required fee to
the Development Services Department (2"
Floor City Hall, 121 51" Ave N).
OPTION 1 SUBMITTAL REQUIREMENTS: PROVIDE THE FOLLOWING INFORMATION
ON PLANS AND SUBMIT WITH MEETING REQUEST FORM:
General Information:
• Assessor's tax parcel number(s) for all lots
• Site address(es)
• Existing and proposed occupancy(ies) and uses
• Building type of construction (e.g. VB, VA,111B)
• Number of stories
• Zoning designation
• Number of dwelling units
Floor areas of each floor of the building
• Fire sprinkler system and fire alarm system types
• Lot area
Site/Utility Plan:
• Site drawings to scale (prefer 1"= 20')
• Location/vicinity map
• North arrow
• Existing and proposed structures, and dimensioned
distances from property lines
• For subdivisions: proposed lot configuration, lot
sizes, lot dimensions, existing and proposed access
easements, existing and proposed points of access,
existing and proposed rights -of -way
Site/Utility Plan, continued:
• Building address number(s)
• Topography at 5 foot or 2 foot intervals
• Trash enclosure location and orientation
• Streets/alleys
• Easements (utility, access, etc.)
• Existing and proposed site access
• Parking layout, typical stall dimensions, accessible
parking and route of travel, drive aisles noted as one-
way and/or two way
• Landscaped areas and signage
• Watercourses and drainage patterns
• Location of mechanical/electrical equipment,
transformers, generators, vaults, etc.
• Location of existing and proposed utilities (sewer,
storm, water, power, etc.)
Floor Plans:
• Existing and proposed floor plans (preferred scale 1/4'
= V) showing uses, exiting, restrooms, and accessible
route of travel, all existing and proposed building
openings including windows/doors, etc.
Revised on 0110412017 Page 2 of 2