Loading...
PSCAA Notification.pdfasclean air.org �\ e, 'uget Sound Clean Air Agency (D JJA P 1fication Case #: 201800034 Phis page must be printed. A printout of the notification, all amendments to the notifica Ion, and the asbestos survey shall be ivailable for inspection at all times at the asbestos project or demolition site (Reg III, 4 03(a)(6)). Fee Amount Paid $65.00 Credit Card Transaction # AIOF75DIEFCC Transaction Date 01/04/18 Owner's Name Cummings Dev LLC Phone (425) 890-3397 Project Street Address 20904 72nd Ave W City Edmonds Zip 98026 Contact Person Mark Cummings Phone (425) 890-3397 Mailing Address 9718 Slater Ave NE Kirkland, WA 98033 This project includes a demolition. Demolition Start Date 02/15/18 Completion Date 03/01/18 Demolition will be completed by a demolition contractor Demo Contractor Slater Homes Corp Contractor Job # Contact Mark Cummings Phone (425) 890-3397 Mailing Address 9718 Slater Ave Ne Kirkland, WA 98033 (1) I certify that the information I have provided is to the best of my knowledge true and accurate. understand that I must file an Amendment to this Notification if: • The type of project has changed. The project types are asbestos and demolition • The quantity of friable asbestos to be removed meets a larger project category. • The project's start or completion date has changed. (3) I understand one Notification must be filed for each stru a single-family residence that includes multiple ancillary strl garage or other outbuildings having the same street addres! I have used a building number. (4) I understand the fees for this Notification are nonrefund Create Another Notification View History If you have questions, contact us at asbestos@pscleanalr.org or 206.689.4058. :ture. The only exception is for ctures, such as a detached . If there is no street address, ble. Log Out Contractor Demolition Before you start any demolition project, you must check for asbestos 3nd then follow our requirements carefully — failure to do so can result in deadly health problems, or a notice of violation and monetary penalties. Also, check with the local building department: they may have additional requirements for demolishing structures. 1.Obtain the summary results of the asbestds survey. The property owner or owner's agent must have an AHERA-certified building inspector survey the structure for asbestos and communicate the results to you and to anyone who may come in contact with the material. Please keep a copy of the survey at the project site. 2. File an Asbestos/Demolition Notification Regardless of whether any asbestos is identified, an Asbestos/Den lition Notification and filing fee must be submitted to this agency before any friable asbestos removal or demolition begins. This applies to all structures, including mobile homes, with greater than 120 square fe �t of roof area. Make a copy of the Notification you submit and keep it available for inspection. . Asbestos/Demolition Notification Form • Please refer to Regulation 111, Section 4.03 (PDF , for full details ',about notification and fees 3. Verify that all asbestos is properly removeid. All friable asbestos -containing material must be removed prior to de olition. Nonfriable asbestos - containing material may be left in place during the demolition, provi ed it remains nonfriable, but must be promptly transferred to a disposal container with a sign identifyin - the material as "nonfriable asbestos waste". The Washington Department of Labor and Industries has stricter asbe tos removal and specific training requirements for those who come in contact with asbestos. Please cor tact them for assistance, or call 1- 800-547-8367. 4. Properly dispose of the asbestos. Take friable asbestos -containing waste to an Asbestos disposal facility authorized to receive the waste. Complete and bring an Asbestos Waste Material Shipment Record (P F). to dispose of the friable asbestos waste at the disposal site. Nonfriable asbestos -containing waste must be promptly transferred to a disposal container labeled "nonfriable asbestos waste." Please c ntact your local disposal company for further instructions. 5. Demolish the structure. You must wait 10 days after filing an Asbestos/Demolition Notificatio to demolish the structure, whether or not there is an asbestos project For more information: • Email Us • Phone:206-689-4058 Home Site Map Contact Us Accessibility, Powered By Copyright Notices Privacy Policy.