PSE8 - Preliminary Gas Design.pdf3
Cn
y�
V
N
LO
00 ^
Lo
O
r-
O
Z
0
Cn
Lv
u7
GD
LO
O
O
I
N
rn
N
c
O
Cf)
g
in
E
a
N
O
I
0)
0
N
N
O
0)
Z5
KYM,861 24 NG PEMBRO86062 2 MARK
�J 8616 242ND ST SW 8606 242ND ST SW
EDMONDS, WA 98026 EDMONDS, WA 98026
00463302600204 00463302600103
0 1" 2" I __
0 30' 60' I I
LOT 5 I I LOT 6
I
1-IFF-
BIELAS, BRANDON/REBECCA
950 N 107TH ST, APT 301
SEATTLE, WA 98133
00463303100202
-ONG, JEANETTE
3621 244TH ST SW
_DMONDS, WA 98026
)0463303100203
V
?6
BIELO, BRANDON JR & REBECCA E.
8623 244TH ST SW
EDMONDS, WA 98026
00463303100202
W W W-
-W W W
_ 31+00
20+00
T
L
I
I
r
I
FONG, JEANETTE
8621 244TH ST SW
EDMONDS, WA 98026
00463303100203
I
YU, RICHARD J. & MYANG S.
8625 244TH ST SW
EDMONDS, WA 98026
00463303100204
I
LOT 4
I
I
I
I
- I
LOT
LOT 2
I III LOT 1
W
w
- 32+00 _
244TH ST SW
7r-
SITE PLAN (
1 "=30' � \
T -
O
APOKOU, ARTOUR &
TSATUOUROVA, ELINA
8604 242ND ST SW
EDMONDS, WA 98026
00463302600104
w
I
LOT 7 I KEMPTON, CAROL A.
8601 244TH ST SW, UNIT 1A
EDMONDS, WA 98206
00668000100100
COOK, SEAN
� 8601 244TH ST SW, UNIT 18
EDMONDS, WA 98206
00668000100200
W
I
LOT 8 I
COPELAND, SETH
8601 244TH ST SW, UNIT IC
EDMONDS, WA 98206
00668000100300
HARVEY, 808
8601 244TH ST SW, UNIT D1
EDMONDS, WA 98206
00668000100400
FEGLER, SUSAN M.
8601 244TH ST SW, UNIT 1 E
EDMONDS, WA 98206
00668000100500
FLEENOR, MARGARET J.
8601 244TH ST SW, UNIT 1 F
EDMONDS, WA 98206
00668000100600
MCCORMICK HAYS, WALTER
1111KIMBERLY ANN
8603 244TH ST SW, UNIT 2A
EDMONDS, WA 98206
00668000200100
IREDALE, NICOLE JOYCE
8603 244TH ST SW, UNIT 2B
EDMONDS, WA 98206
00668000200200
FAIK, FATIMA
8603 244TH ST SW, UNIT 2C
EDMONDS, WA 98206
00668000200300
MURAWSKI, JENNA
8603 244TH ST SW, UNIT 2D
EDMONDS, WA 98206
00668000200400
KAHSAY, BERHANE
8603 244TH ST
UNIT 2E
EDMONDS, WA 06
006680002
PETRICH, DOUGLAS\l.\
8603 244TH ST SW T 2F
SCHMI ITA A.
8605 2 ST SW UNIT 3B
EDMONDS, 98206
06680003 2
MA UTT, RA L.
860 TH ST SW UNIT 3C
D DS, WA 98206
668000300300
WILLIAMS, EUGENE H.
8605 244TH ST SW, UNIT 3D
EDMONDS, WA 98206
00668000300400
MCCLELLAN, JACK
8605 244TH ST SW, NI 3E
EDMONDS, WA 98206
00668000300500
BENAPFL, THOMAS B.
8605 244TH ST SW, U T 3F
EDMONDS, WA 98206
00668000300600
---- - ------
2" FUSED "E-1
3'X5' CUT FOR TIE-IN
771
' 29'N CA & 722'W CA OF AURORA AVE N
M'N CA & 'W CA
OF AURORA AVE N
R/W or
Property Line
CROSSING CONDUIT TABLE
X-ING
#
LOCATION
GAS
XING
LENGTH
TYPE OF CROSSING
(Feeder, Primary, Secondary, etc.)
FROM
TO
SIZE
(IN)
TYPE
QTY
LOCATION
X01
LOT 2
LOT 11
4
40
1
N
50
GAS MAIN
X02
LOT 4
LOT 9
4
40
1
N
50
GAS SERVICE - GAS ONLY
X03
LOT 8
LOT 6
4
40
1
E
50
GAS SERVICE - GAS ONLY
X04
LOT 4
LOT 5
4
40
1
E
50
GAS SERVICE - GAS ONLY
4" PVC PLUG /CAPS = 8 4" YELLOW SCH 40 PVC = 200 FT
Excavated
48" Typical Dirt Pile
uur0 01aewa1K F" 24" Min
Number of Utilities \\\\
12" Typical and Conduits 4,5
a.
Final Grade
12" Min
Final Back fill '2 Separation / 36"
Location of roof drain 12" Min 12" Min s / Min Cover
// Over Power
intercept (depth varies). 48"
/ Max
6" or 12" Min Sand Shading // 6" or 12" Min Sand Shading Depth
Over Gas after Compaction' / Over Power after Compactions
Solon4" Sand Bedding s
Gas TV & TELJ Primary J L Secondary
NOTES: Power Power
1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench.
If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench.
2. Rocks greater than 10 inches diameter are not permitted in the final backfill.
3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the
side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.
4. Utilities shall not be stacked over the gas line in the trench.
5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.
6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.
* Alternatives to full -width trench shading require PSE approval.
JOINT TRENCH DETAIL
Primary & Secondary -Mainline Gas & Communications (NTS)
GASSED UP PIPELINE
PIPE FOREMAN'S DATE
SEGMENT NAME
FITTER'S CHECKLIST (CHECK BOX TO CONFIRM COMPLETION)
❑ Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500
❑ Reviewed and complied with all construction notes.
❑ Recorded all required information on the as -built per GOS 2500.1700.
❑ Completed post installation inspection per GOS 2525.1200 and 2525.2700.
❑ Left the work area in a clean and safe condition.
Foreman's Signature
Foreman's Name (printed)
Company: Date
06/11
GENERAL NOTES - GAS (JOINT TRENCH):
1. Excavator to contact Utilities Underground Location Center (One -Call) 48 hours prior to construction, to two
working days prior to construction. 1-800-424-5555
2. Notify appropriate permitting agency prior to job start (see permit requirements).
3. Erosion and sediment control shall be per PSE Standard Practice 0150.3200 Techniques for Temporary Erosion
and Sediment Control and any additional local jurisdiction requirements.
4. Any change in route, pipe size/type, tie-in method or additional main footage must be approved by the
appropriate Engineer/Project Manager.
5. Complete "Exposed Pipe Condition Report" on all exposed existing Steel PSE Facilities.
Check box on report for wire box (Test Lead) installation.
6. Pipeline Markers and Warning Signs shall be installed and recorded by the Contractor per PSE Gas Operating
Standard 2525.2500.
7. To prevent accidental overpressure of adjoining systems, no two mains shall be connected, except as shown on
this design, unless approved by the appropriate Engineer/Project Manager.
8. System MAOP denoted by I System MAOP = 45 PSIG
9. Install Main Valves out of traffic where possible.
10. Gauge (use Manometer for LP Systems) and monitor use of all stoppers and squeezes to insure adequate feed.
11. Install one pound Anode for every 1000' of locating wire. Install Anode and Test Lead Wires per PSE Gas
Operating Standards 2525.1200 and 2525.2300.
12. If STW pipe involved, coordinate installation with CP Tech. N/A Cell # N/A
13. Purge Points and Pressure Taps shall be installed per PSE Gas Operating Standards 2525.3400 and PSE Gas
Field Procedures Manual 0812 and 0813.
14. Mains and services shall be tested and purged per PSE Gas Operating Standards 2525.3300 and 2525.3400.
15. Unless otherwise noted:
All pipes installed in plat to be 2" MPE-7.
All crossings to be Yellow 4" PVC.
All Services to be 1-1/8 PE.
/ denotes service stub location.
( ) denotes footage between fittings.
16. Customer to dig and backfill on private property or easement only. Trenches must conform to PSE Gas
Operating Standards 2525.1500, 2525.1600 and 2525.1700.
17. Note all recordable footages, locations and material changes on the as -built in red.
18. Upon completion of the project send the print copy, along with the completed work order, listing crew & actual
materials used to the appropriate design group.
19. On site pre -con required before start of job.
20. At symbol: install natural gas main piping and fixtures. Size as indicated on tables and
work sketch (gas main is to parallel power system unless otherwise shown on work sketch).
21. Inclement weather conditions may cause delays in construction times and dates.
GAS MAIN INSTALLATION/RETIREMENT
Type/Work
Pipe Size
Type
Est Length
Act Lgth
Manufacturer
INSTALL
2"
MPE-7
60 FT
JOINT
2"
MPE-7
300 FT
Verify Testing Requirements, Chart vs Gauge
GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5
GAS MAIN
PRESSURE & TESTING
TYPE TEST
❑ SOAP
❑ AIR
[--]NITROGEN
❑ WATER
DATE ON
/ /
START TIME
TESTED BY
DATE OFF
/ /
STOP TIME
PRESSURE
TEST RESULTS
❑ P ❑ F
TYPE TEST
❑ SOAP
❑ AIR
E] NITROGEN
❑ WATER
DATE ON
/ /
START TIME
TESTED BY
DATE OFF
/ /
STOP TIME
PRESSURE
TEST RESULTS
❑ P ❑ F
❑ TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928
DESIGN PRESSI 60 1 SYS MAOP I IP 025-45
2023 02/18
PROJECT PHASE
Notification #
Order #
GAS SAP Superior
Service Stubs
Service/Meter
Service/Meter
Service/Meter
Ind. Service
Ind. MSA
Dis. Reg. / FT
HP Svc/MSA
Relocate
Retirement
508105121
107058715
STUBS
106357992
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Project Manager Contact Information:
Manager: APRIL JONES
Cell Phone: 425-424-6475
E-Mail: aoril.ionesCcr�ose.com
Vicinity Map
47.778007,-122.349226
N
F SITE
Denny's
k Station 3 _
Arby's 9
° 244th St SW
0
76
3 � Circle R Q Ql
N 2o.<n s 0
N 203,d In Z
> 0
i Cash America Pawn
N 203rtl S[ ..
g
1,1202nd s! 3 N202 St
> starbucks
0
v
O
Cn
00
CA
mikem@mietznergroup.com
Owner / Developer Contact Info
Mietzner Brothers Properties, LLC
11611 Airport Rd, Suite B-1
Everett, WA 98204
ATTN: Mike Mietzner 425-754-9651 office
or contacts below dial 1-888-CALL PSE (225-5773)
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
"Locates Required" Yes ® No ❑
"Flagging Required" Yes ® No ❑
REAL ESTATE/EASEMENT
REDT # ( RW-TBD )
PERMIT
CITY OF EDMONDS
REV#
DATE
BY
DESCRIPTION
FUNCTION
CONTACT
PHONE NO
DATE
3
#
#
#
PROJECT MGR
APRIL JONES
425-424-6475
8/2/19
2
#
#
#
ENGR - GAS
ASTA BITINAS
253-437-6725
8/2/19
1
#
#
#
DRAWN BY
ASTA BITINAS
253-437-6725
8/2/19
CHECKED BY
COUNTY
SNOHOMISH
Emer Sect
5
GAS WK CTR
CISNC
APPROVED BY
CP APPROVAL
N/A
N/A
N/A
1/4 SEC
SW31 T2731 R04E
OP MAP
164.068
PLAT MAP
167.068
PC APPROVAL
N/A
N/A
N/A
IMAPPING
JOINT FACILITIES ARRANGEMENTS
UTILITIES
COMCAST
FRONTIER
############
PUD ENGINEER
CONTACT
JOHN WARRICK
RON ANDERSON
#######
JOHN WILLIAMS
PHONE#
425-263-5328
425-308-7235
###########
425-783-4766
PUGET 244TH ST PROJECT
SOUND 2" MPE-7 GAS MAIN EXTENSION - 11 S/F LOTS
ENERGY 8609 244TH ST SW, EDMONDS WA 98026
DESIGNED BY PUGET SOUND ENERGY
SAP Sup Order Nbr
107058715
ELEC ON/A er Number
SCALE PAGE
V. = 30' 1 OF 1
/2019 2-54 PM obit,, - bit, s, asta