Loading...
PSE8 - Preliminary Gas Design.pdf3 Cn y� V N LO 00 ^ Lo O r- O Z 0 Cn Lv u7 GD LO O O I N rn N c O Cf) g in E a N O I 0) 0 N N O 0) Z5 KYM,861 24 NG PEMBRO86062 2 MARK �J 8616 242ND ST SW 8606 242ND ST SW EDMONDS, WA 98026 EDMONDS, WA 98026 00463302600204 00463302600103 0 1" 2" I __ 0 30' 60' I I LOT 5 I I LOT 6 I 1-IFF- BIELAS, BRANDON/REBECCA 950 N 107TH ST, APT 301 SEATTLE, WA 98133 00463303100202 -ONG, JEANETTE 3621 244TH ST SW _DMONDS, WA 98026 )0463303100203 V ?6 BIELO, BRANDON JR & REBECCA E. 8623 244TH ST SW EDMONDS, WA 98026 00463303100202 W W W- -W W W _ 31+00 20+00 T L I I r I FONG, JEANETTE 8621 244TH ST SW EDMONDS, WA 98026 00463303100203 I YU, RICHARD J. & MYANG S. 8625 244TH ST SW EDMONDS, WA 98026 00463303100204 I LOT 4 I I I I - I LOT LOT 2 I III LOT 1 W w - 32+00 _ 244TH ST SW 7r- SITE PLAN ( 1 "=30' � \ T - O APOKOU, ARTOUR & TSATUOUROVA, ELINA 8604 242ND ST SW EDMONDS, WA 98026 00463302600104 w I LOT 7 I KEMPTON, CAROL A. 8601 244TH ST SW, UNIT 1A EDMONDS, WA 98206 00668000100100 COOK, SEAN � 8601 244TH ST SW, UNIT 18 EDMONDS, WA 98206 00668000100200 W I LOT 8 I COPELAND, SETH 8601 244TH ST SW, UNIT IC EDMONDS, WA 98206 00668000100300 HARVEY, 808 8601 244TH ST SW, UNIT D1 EDMONDS, WA 98206 00668000100400 FEGLER, SUSAN M. 8601 244TH ST SW, UNIT 1 E EDMONDS, WA 98206 00668000100500 FLEENOR, MARGARET J. 8601 244TH ST SW, UNIT 1 F EDMONDS, WA 98206 00668000100600 MCCORMICK HAYS, WALTER 1111KIMBERLY ANN 8603 244TH ST SW, UNIT 2A EDMONDS, WA 98206 00668000200100 IREDALE, NICOLE JOYCE 8603 244TH ST SW, UNIT 2B EDMONDS, WA 98206 00668000200200 FAIK, FATIMA 8603 244TH ST SW, UNIT 2C EDMONDS, WA 98206 00668000200300 MURAWSKI, JENNA 8603 244TH ST SW, UNIT 2D EDMONDS, WA 98206 00668000200400 KAHSAY, BERHANE 8603 244TH ST UNIT 2E EDMONDS, WA 06 006680002 PETRICH, DOUGLAS\l.\ 8603 244TH ST SW T 2F SCHMI ITA A. 8605 2 ST SW UNIT 3B EDMONDS, 98206 06680003 2 MA UTT, RA L. 860 TH ST SW UNIT 3C D DS, WA 98206 668000300300 WILLIAMS, EUGENE H. 8605 244TH ST SW, UNIT 3D EDMONDS, WA 98206 00668000300400 MCCLELLAN, JACK 8605 244TH ST SW, NI 3E EDMONDS, WA 98206 00668000300500 BENAPFL, THOMAS B. 8605 244TH ST SW, U T 3F EDMONDS, WA 98206 00668000300600 ---- - ------ 2" FUSED "E-1 3'X5' CUT FOR TIE-IN 771 ' 29'N CA & 722'W CA OF AURORA AVE N M'N CA & 'W CA OF AURORA AVE N R/W or Property Line CROSSING CONDUIT TABLE X-ING # LOCATION GAS XING LENGTH TYPE OF CROSSING (Feeder, Primary, Secondary, etc.) FROM TO SIZE (IN) TYPE QTY LOCATION X01 LOT 2 LOT 11 4 40 1 N 50 GAS MAIN X02 LOT 4 LOT 9 4 40 1 N 50 GAS SERVICE - GAS ONLY X03 LOT 8 LOT 6 4 40 1 E 50 GAS SERVICE - GAS ONLY X04 LOT 4 LOT 5 4 40 1 E 50 GAS SERVICE - GAS ONLY 4" PVC PLUG /CAPS = 8 4" YELLOW SCH 40 PVC = 200 FT Excavated 48" Typical Dirt Pile uur0 01aewa1K F" 24" Min Number of Utilities \\\\ 12" Typical and Conduits 4,5 a. Final Grade 12" Min Final Back fill '2 Separation / 36" Location of roof drain 12" Min 12" Min s / Min Cover // Over Power intercept (depth varies). 48" / Max 6" or 12" Min Sand Shading // 6" or 12" Min Sand Shading Depth Over Gas after Compaction' / Over Power after Compactions Solon4" Sand Bedding s Gas TV & TELJ Primary J L Secondary NOTES: Power Power 1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. 2. Rocks greater than 10 inches diameter are not permitted in the final backfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line. 4. Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies. * Alternatives to full -width trench shading require PSE approval. JOINT TRENCH DETAIL Primary & Secondary -Mainline Gas & Communications (NTS) GASSED UP PIPELINE PIPE FOREMAN'S DATE SEGMENT NAME FITTER'S CHECKLIST (CHECK BOX TO CONFIRM COMPLETION) ❑ Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 ❑ Reviewed and complied with all construction notes. ❑ Recorded all required information on the as -built per GOS 2500.1700. ❑ Completed post installation inspection per GOS 2525.1200 and 2525.2700. ❑ Left the work area in a clean and safe condition. Foreman's Signature Foreman's Name (printed) Company: Date 06/11 GENERAL NOTES - GAS (JOINT TRENCH): 1. Excavator to contact Utilities Underground Location Center (One -Call) 48 hours prior to construction, to two working days prior to construction. 1-800-424-5555 2. Notify appropriate permitting agency prior to job start (see permit requirements). 3. Erosion and sediment control shall be per PSE Standard Practice 0150.3200 Techniques for Temporary Erosion and Sediment Control and any additional local jurisdiction requirements. 4. Any change in route, pipe size/type, tie-in method or additional main footage must be approved by the appropriate Engineer/Project Manager. 5. Complete "Exposed Pipe Condition Report" on all exposed existing Steel PSE Facilities. Check box on report for wire box (Test Lead) installation. 6. Pipeline Markers and Warning Signs shall be installed and recorded by the Contractor per PSE Gas Operating Standard 2525.2500. 7. To prevent accidental overpressure of adjoining systems, no two mains shall be connected, except as shown on this design, unless approved by the appropriate Engineer/Project Manager. 8. System MAOP denoted by I System MAOP = 45 PSIG 9. Install Main Valves out of traffic where possible. 10. Gauge (use Manometer for LP Systems) and monitor use of all stoppers and squeezes to insure adequate feed. 11. Install one pound Anode for every 1000' of locating wire. Install Anode and Test Lead Wires per PSE Gas Operating Standards 2525.1200 and 2525.2300. 12. If STW pipe involved, coordinate installation with CP Tech. N/A Cell # N/A 13. Purge Points and Pressure Taps shall be installed per PSE Gas Operating Standards 2525.3400 and PSE Gas Field Procedures Manual 0812 and 0813. 14. Mains and services shall be tested and purged per PSE Gas Operating Standards 2525.3300 and 2525.3400. 15. Unless otherwise noted: All pipes installed in plat to be 2" MPE-7. All crossings to be Yellow 4" PVC. All Services to be 1-1/8 PE. / denotes service stub location. ( ) denotes footage between fittings. 16. Customer to dig and backfill on private property or easement only. Trenches must conform to PSE Gas Operating Standards 2525.1500, 2525.1600 and 2525.1700. 17. Note all recordable footages, locations and material changes on the as -built in red. 18. Upon completion of the project send the print copy, along with the completed work order, listing crew & actual materials used to the appropriate design group. 19. On site pre -con required before start of job. 20. At symbol: install natural gas main piping and fixtures. Size as indicated on tables and work sketch (gas main is to parallel power system unless otherwise shown on work sketch). 21. Inclement weather conditions may cause delays in construction times and dates. GAS MAIN INSTALLATION/RETIREMENT Type/Work Pipe Size Type Est Length Act Lgth Manufacturer INSTALL 2" MPE-7 60 FT JOINT 2" MPE-7 300 FT Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 GAS MAIN PRESSURE & TESTING TYPE TEST ❑ SOAP ❑ AIR [--]NITROGEN ❑ WATER DATE ON / / START TIME TESTED BY DATE OFF / / STOP TIME PRESSURE TEST RESULTS ❑ P ❑ F TYPE TEST ❑ SOAP ❑ AIR E] NITROGEN ❑ WATER DATE ON / / START TIME TESTED BY DATE OFF / / STOP TIME PRESSURE TEST RESULTS ❑ P ❑ F ❑ TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 DESIGN PRESSI 60 1 SYS MAOP I IP 025-45 2023 02/18 PROJECT PHASE Notification # Order # GAS SAP Superior Service Stubs Service/Meter Service/Meter Service/Meter Ind. Service Ind. MSA Dis. Reg. / FT HP Svc/MSA Relocate Retirement 508105121 107058715 STUBS 106357992 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Project Manager Contact Information: Manager: APRIL JONES Cell Phone: 425-424-6475 E-Mail: aoril.ionesCcr�ose.com Vicinity Map 47.778007,-122.349226 N F SITE Denny's k Station 3 _ Arby's 9 ° 244th St SW 0 76 3 � Circle R Q Ql N 2o.<n s 0 N 203,d In Z > 0 i Cash America Pawn N 203rtl S[ .. g 1,1202nd s! 3 N202 St > starbucks 0 v O Cn 00 CA mikem@mietznergroup.com Owner / Developer Contact Info Mietzner Brothers Properties, LLC 11611 Airport Rd, Suite B-1 Everett, WA 98204 ATTN: Mike Mietzner 425-754-9651 office or contacts below dial 1-888-CALL PSE (225-5773) CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES "Locates Required" Yes ® No ❑ "Flagging Required" Yes ® No ❑ REAL ESTATE/EASEMENT REDT # ( RW-TBD ) PERMIT CITY OF EDMONDS REV# DATE BY DESCRIPTION FUNCTION CONTACT PHONE NO DATE 3 # # # PROJECT MGR APRIL JONES 425-424-6475 8/2/19 2 # # # ENGR - GAS ASTA BITINAS 253-437-6725 8/2/19 1 # # # DRAWN BY ASTA BITINAS 253-437-6725 8/2/19 CHECKED BY COUNTY SNOHOMISH Emer Sect 5 GAS WK CTR CISNC APPROVED BY CP APPROVAL N/A N/A N/A 1/4 SEC SW31 T2731 R04E OP MAP 164.068 PLAT MAP 167.068 PC APPROVAL N/A N/A N/A IMAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES COMCAST FRONTIER ############ PUD ENGINEER CONTACT JOHN WARRICK RON ANDERSON ####### JOHN WILLIAMS PHONE# 425-263-5328 425-308-7235 ########### 425-783-4766 PUGET 244TH ST PROJECT SOUND 2" MPE-7 GAS MAIN EXTENSION - 11 S/F LOTS ENERGY 8609 244TH ST SW, EDMONDS WA 98026 DESIGNED BY PUGET SOUND ENERGY SAP Sup Order Nbr 107058715 ELEC ON/A er Number SCALE PAGE V. = 30' 1 OF 1 /2019 2-54 PM obit,, - bit, s, asta