Loading...
R-2007-53_PB-StaffReport.pdf CITY OF EDMONDS 121 - 5TH AVENUE NORTH, EDMONDS, WA 98020 PLANNING DIVISION ADVISORY REPORT FINDINGS, CONCLUSIONS, AND RECOMMENDATIONS To: EDMONDS PLANNING BOARD From : Gina Coccia Planner Date: Planning Board Meeting of September 12, 2007 File: R-2007-53 Application by A.D. Shapiro Architects / Marier & Marier for a rezone of properties at 23601 Edmonds Way from the current zoning of Neighborhood Business (BN) to Community Business – Edmonds Way (BC-EW). Hearing Date, Time, and Place: September 12, 2007, at 7:00 PM, Edmonds City Council Chambers Public Safety Complex th Avenue North 250 - 5 TABLE OF CONTENTS Section Page I.INTRODUCTION................................................................................................................................2 A.APPLICATION..............................................................................................................................2 B.RECOMMENDATION..................................................................................................................2 II.FINDINGS OF FACT AND CONCLUSIONS..............................................................................2 A.SD...........................................................................................................................2 ITEESCRIPTION B.SEPA(SEPA)...............................................................................3 TATENVIRONMENTALOLICYCT .DEVELOPMENT()...............................................3 CEDMONDS COMMUNITY CODE ECDC COMPLIANCE D.....................................................................................................................5 COMPREHENSIVE PLAN III.ATTACHMENTS.............................................................................................................................6 V.PARTIES OF RECORD..................................................................................................................6 City of Edmonds Planning Board I. INTRODUCTION A. APPLICATION 1.Applicant: A.D. Shapiro Architects / Marier & Marier. 2.Site Location: 23601 Edmonds Way (Refer to Attachment 1). 3.Request: Application for a rezone from “Neighborhood Business” (BN) to “Community Business – Edmonds Way” (BC-EW) (see Attachment 2). 4.Review Process: Rezone - Planning Board conducts a public hearing and forwards a recommendation to the City Council for final decision. 5.Major Issues: a. Compliance with Edmonds Community Development Code (ECDC) Chapter 20.40 (REZONES). b. Compliance with Edmonds Community Development Code (ECDC) Chapter 20.100 (HEARING EXAMINER, PLANNING ADVISORY BOARD AND CITY COUNCIL REVIEW). B. RECOMMENDATION Based on Findings of Fact, Analysis, Conclusions, and Attachments in this report, staff recommends that the Planning Board make a recommendation to the City APPROVE the requested rezone to “Community Business – Edmonds Council to Way” (BC-EW). II. FINDINGS OF FACT AND CONCLUSIONS A. SITE DESCRIPTION 1. Site Development and Zoning a.Facts: (1)Size and Shape: The area under review is on the south side of th 236 Street SW and on the east side of Edmonds Way (SR-104). The site is approximately 0.60 acres in size and has about 210 feet of frontage along Edmonds Way and about 160 feet of frontage th along 236 Street SW. (2)Land Use: The eastern parcel is undeveloped, while the western parcel is vacant but had previously been developed with a self-serve diesel gas station. (3)Zoning: Current zoning of the subject properties is Neighborhood Business (BN) as shown on the vicinity map (see Attachment 1). Page2 R-2007-53_PB-StaffReport.doc 2. Neighboring Development and Zoning a. Facts: (1)North: Both single family development and commercial th development lay north of the property across 236 Street SW in Unincorporated Snohomish County (see Attachment 1). (2)East: Properties immediately east are zoned Multiple Residential (RM-1.5). Slightly further east begins an area of Single-family Residential (RS-8). (3)South: An area of Community Business (BC) is adjacent to the south (see Attachment 1). (4)West: Properties to the west across Edmonds Way are zoned RM- 1.5 (with one parcel zoned BN) and consist of primarily multi- family development. B. STATE ENVIRONMENTAL POLICY ACT (SEPA) 1.Fact: A Determination of Nonsignificance was issued on August 14, 2007, for the change in zoning (see Attachment 3). 2.Conclusion: SEPA requirements have been satisfied for the proposed change in zoning. C. EDMONDS COMMUNITY DEVELOPMENT CODE (ECDC) COMPLIANCE 1.ECDC Section 20.40 (Rezones) a.Facts: (i) The BC-EW zoning classification is included in Attachment 4 for reference. (ii) The applicant has submitted material in support of their application (see Attachment 2). Their discussion addresses the factors to be considered for a change in zoning. (iii) Edmonds Community Development Code (ECDC) Section 20.40.010 provides that, at a minimum, the following factors shall be considered in reviewing an application for a rezone: (1)Comprehensive Plan. Whether the proposal is consistent with the Comprehensive Plan; and, (2)Zoning Ordinance. Whether the proposal is consistent with the purposes of the Zoning Ordinance, and whether the proposal is consistent with the purposes of the proposed zone district; and, (3)Surrounding Area. The relationship of the proposed zoning change to the existing land uses and zoning of surrounding or nearby property; and, (4)Changes. Whether there has been sufficient change in the character of the immediate or surrounding area or in city policy to justify the rezone: and, Page3 R-2007-53_PB-StaffReport.doc (5)Suitability. Whether the property is economically and physically suitable for the uses allowed under the existing zoning, and under the proposed zoning. One factor could be the length of time the property has remained undeveloped compared to the surrounding area, and parcels elsewhere with the same zoning; and (6)Value. The relative gain to the public health, safety and welfare compared to the potential increase or decrease in value to the property owners. b.Analysis: (i) Comprehensive Plan.The Comprehensive Plan designates the subject property as part of the “Edmonds Way Corridor.” The existing BN and the proposed BC-EW zones are consistent with that designation. \[2007 Comprehensive Plan, pg. 16\] Also refer to the additional discussion under II.D, below. (ii) Zoning Ordinance. The purposes of the proposed BC-EW zone are given in ECDC 16.50.005 (see Attachment 4), and are listed below. The proposed BC-EW zone is specifically intended for application within the Edmonds Way Corridor, and is appropriate to be applied when design transitions and buffering can be provided. A. To reserve areas for those retail stores, offices, service establishments and amusement establishments which offer goods and services to the entire community; B. To ensure compact, convenient development patterns by allowing uses that are operated chiefly within buildings; C. To allow for mixed-use development which includes multiple dwelling unit(s) that support business uses. D. To implement the policies of the Edmonds' Comprehensive Plan for the Edmonds Way Corridor. E. To meet the goals of the Growth Management Act and the City of Edmonds' Comprehensive Plan for housing diversity and economical vitality. (iii) Surrounding Area. The site is located generally along SR-104. There are a mix of uses, mainly comprised of multi-family and small-scale commercial businesses. (iv) Changes.The trend is toward an overall intensification of uses along SR-104. Further north along Edmonds Way, there are several new areas that have recently been rezoned to BC-EW and they promise a mix of residential and commercial uses similar to this proposal. (v) Suitability.The property in question appears to be economically and physically suitable for development under the proposed BC-EW zone. The SR-104 corridor provides significant opportunities for transit service, and the local topography will help orient future development th of the site to SR-104 and 236 Street SW. (vi) Value. In addition to the increased value that the property owner may Page4 R-2007-53_PB-StaffReport.doc realize from the change in zoning, additional value should also be added to the city since, if redevelopment occurs, additional small-scale commercial development will be available to residents in the vicinity. The development of additional dwelling units and employment within areas designated for this type of development supports the City’s GMA responsibilities in a way that reduces the potential for additional changes in zoning in areas that don’t have the supporting infrastructure or services available. This development will be served by a high- volume arterial and public transit that are necessary to support mixed use development. c.Conclusions: (i) The proposed rezone is consistent with the Comprehensive Plan land use designation for the subject property. (ii) The proposed rezone is consistent with the purposes of the zoning ordinance. (iii) Based on the facts and analysis contained above, planning staff concludes that the proposal satisfies the criteria for a change in zoning. D. COMPREHENSIVE PLAN 1.Comprehensive Plan Policies: a.Facts: (i) This site is currently designated as part of the “Edmonds Way Corridor. Relevant policies for the Edmonds Way Corridor include: F. Goals for the Edmonds Way Corridor. The Edmonds Way Corridor consists of portions of Edmonds Way between the 100th Avenue West intersection and Highway 99. This corridor serves as a key transportation corridor, and also provides a key link between Edmonds and Interstate 5. Established residential areas lie on both sides of the corridor. An established pattern of multiple family residential development lies along much of the corridor, while small- scale businesses can be found primarily near intersections. A major concern is that the more intensive development that occurs along the corridor should not interfere with the flow of through traffic or intrude into adjoining established communities. F.1. Permit uses in planned multiple family or small-scale business developments that are designed to minimize contributing significantly to traffic congestion. F.2. Provide for transit and pedestrian access to development. F.3. Use design review to encourage the shared or joint use of driveways and access points by development onto SR-104 in order to support the movement of traffic in a safe and efficient manner. Site access should not be provided from residential streets unless there is no feasible alternative. F.4. Use design review to ensure that development provides a Page5 R-2007-53_PB-StaffReport.doc transition to adjacent residential neighborhoods. For uses in transitional areas adjacent to single family neighborhoods, use design techniques such as the modulation of facades, pitched roofs, stepped-down building heights, multiple buildings, and landscaping to provide designs compatible with single family development. Make use of natural topography to buffer incompatible development whenever possible. b.Analysis: (i) The Comprehensive Plan Policies noted above encourage the siting of multi-family residential or commercial uses within the Edmonds Way Corridor, so long as traffic impacts and transitions can be addressed. The proposed mixed use Edmonds Way zoning is consistent with the stated intent. c.Conclusions: (i) The proposal is consistent with the policy direction in the Comprehensive Plan, and with the “Edmonds Way Corridor” designation for the subject property. E. TECHNICAL COMMITTEE No comments were received from City departments reviewing the proposal. F. PUBLIC COMMENTS No comment letters have been received, although one individual has requested to be added as a party of record and is noted below. III. ATTACHMENTS 1. Comprehensive plan, zoning , and aerial/topo vicinity maps. 2. Supporting material submitted by the applicant. 3. SEPA Determination 4. ECDC zoning regulations for BC-EW zone. V. PARTIES OF RECORD Tony Shapiro Thomas R. Marier Bruce P. Witenberg, P.S. A.D Shapiro Architects Marier & Marier BRESKIN & WITENBERG, PLLC rd 624 Edmonds Way 4946 NE 193 Street 1301 Fifth Avenue – Suite 2600 Edmonds WA 98020 Lake Forest Park WA 98155 Seattle WA 98101-2618 Page6 R-2007-53_PB-StaffReport.doc