Loading...
RE STF20180016 - PUD Noise Variance Request.msg IPM.Note RE: STF20180016 - PUD Noise Variance Request RE: Wayland, Christina Lauer, Michael Wayland, Christina SMTP MRLauer@SNOPUD.com STF20180016 - PUD Noise Variance Request EX /O=CITY OF EDMONDS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=WAYLAND, CHRISTINA7F0 EX /O=CITY OF EDMONDS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=WAYLAND, CHRISTINA7F0 X-Vipre-Scanned: 03B4F6E00107C003B4F82D Received: from barracuda.edmondswa.gov (192.168.100.38) by EDMSVR-EXCH02.edmonds.local (10.10.3.20) with Microsoft SMTP Server id 14.3.399.0; Tue, 19 Jun 2018 09:41:21 -0700 X-ASG-Debug-ID: 1529426478-0932526d3701150001-gIHSHQ Received: from mail.snopud.com (mail.snopud.com [139.138.102.25]) by barracuda.edmondswa.gov with ESMTP id CXVRPmDoVGckcfnG (version=TLSv1 cipher=AES128-SHA bits=128 verify=NO); Tue, 19 Jun 2018 09:41:19 -0700 (PDT) X-Barracuda-Envelope-From: MRLauer@SNOPUD.com X-Barracuda-Effective-Source-IP: mail.snopud.com[139.138.102.25] X-Barracuda-Apparent-Source-IP: 139.138.102.25 X-Barracuda-User-Whitelist: chris.rivera@edmondswa.gov X-Barracuda-User-Whitelist: christina.wayland@edmondswa.gov X-Barracuda-User-Whitelist: jeanie.mcconnell@edmondswa.gov Received: from MBXP01.snopud.com ([fe80::1c0f:af:8eb2:d09a]) by HUBCASP02.snopud.com ([::1]) with mapi id 14.03.0382.000; Tue, 19 Jun 2018 09:41:17 -0700 From: "Lauer, Michael" <MRLauer@SNOPUD.com> To: "'McConnell, Jeanie'" <Jeanie.McConnell@edmondswa.gov> X-Barracuda-User-Whitelist: jeanie.mcconnell@edmondswa.gov X-Barracuda-User-Whitelist: christina.wayland@edmondswa.gov X-Barracuda-User-Whitelist: chris.rivera@edmondswa.gov CC: "Wayland, Christina" <Christina.Wayland@edmondswa.gov>, "Rivera, Chris" <Chris.Rivera@edmondswa.gov>, "Lambert, Jennifer" <Jennifer.Lambert@edmondswa.gov>, Joint Use <JointUse@SNOPUD.com> Subject: RE: STF20180016 - PUD Noise Variance Request Thread-Topic: STF20180016 - PUD Noise Variance Request X-ASG-Orig-Subj: RE: STF20180016 - PUD Noise Variance Request Thread-Index: AdPxRbVG03/ixzIaRQyGpVP6mRrZQQAjQpXg Date: Tue, 19 Jun 2018 16:41:17 +0000 Message-ID: <D0EBD328F8EF2D4CBD9293DE9EFFF7EC50BAE1B2@MBXP01.snopud.com> References: <8D4707C3EC6DEE448D2BC00DC533676001393511B3@EDMSVR-EXCH02.edmonds.local> In-Reply-To: <8D4707C3EC6DEE448D2BC00DC533676001393511B3@EDMSVR-EXCH02.edmonds.local> Accept-Language: en-US Content-Language: en-US X-MS-Has-Attach: yes X-MS-TNEF-Correlator: x-originating-ip: [192.168.115.56] Content-Type: multipart/mixed; boundary="_005_D0EBD328F8EF2D4CBD9293DE9EFFF7EC50BAE1B2MBXP01snopudcom_" MIME-Version: 1.0 X-Barracuda-Connect: mail.snopud.com[139.138.102.25] X-Barracuda-Start-Time: 1529426479 X-Barracuda-Encrypted: AES128-SHA X-Barracuda-URL: https://barracuda.edmondswa.gov:443/cgi-mod/mark.cgi X-Barracuda-BRTS-Status: 1 X-Virus-Scanned: by bsmtpd at edmondswa.gov X-Barracuda-Scan-Msg-Size: 15923 Return-Path: MRLauer@SNOPUD.com X-MS-Exchange-Organization-AuthSource: EDMSVR-EXCH02.edmonds.local X-MS-Exchange-Organization-AuthAs: Internal X-MS-Exchange-Organization-AuthMechanism: 10 Lauer, Michael SMTP MRLauer@SNOPUD.com Wayland, Christina; Rivera, Chris; Lambert, Jennifer; Joint Use McConnell, Jeanie STF20180016 - PUD Noise Variance Request Hi Jeanie, I apologize for any confusing or lack of information that was submitted with the revised application. I will address your concerns below: 1. 1 pole will be replaced. As stated in the attached Additional Info document, point 5 “The setting of the new pole and use of a Vactor Truck to be done during normal business hours. The transfer of 3 phase overhead and underground primary will need to be done at night.” To elaborate, PUD crews can dig the new pole hole with the Vactor truck and set the new pole into the ground during normal working hours. This would most likely be the noisiest part of the entire pole replacement job and will not require a power outage to any of the local businesses. The work that would need to take place between 6pm and 6am would be the transfer of the overhead and underground primary and overhead secondary to the new pole. As detailed on page 2 of 2 in the Construction Notes, PUD crew will need to remove the old underground primary in the existing riser and vault because it is not long enough to accommodate the taller pole. PUD crew will then pull in new primary cable that is 5 feet longer (~78’). PUD will also install a new street light mast and transfer overhead secondary services at this time. 2. Please see attached document. 3. Please see attached sketch. Thanks, Michael Lauer Senior Designer T&D Engineering 425-783-5154 ________________________________ Good afternoon Michael, I have completed review of the noise variance application submitted for work to be performed at 21000 70th Ave W. Please address the following comments so review of the noise variance can continue. 1) Update the scope of work to be performed during the 6am-6pm timeframe. The application states 1 pole will be replaced, however, the additional info provided with the application states the pole will be replaced during daytime hours. 2) Please elaborate on the criteria items number 1 & 2. 3) Provide a site plan showing the pole location and surrounding businesses that could be impacted by either the noise and/or the power outage. The associated right-of-way construction permit (ENG20180177) is being reviewed separately and should be completed in the next couple of days. Any comments pertaining to that review will follow. Thank you, Jeanie Jeanie McConnell - <http://www.bing.com/images/search?q=Pink+Snowflake+Clip+Art&Form=IQFRDR#view=detail&id=137027C70156A13A43FB773BCEA9D72765CD5FEB&selectedIndex=0> Engineering Program Manager jeanie.mcconnell@edmondswa.gov <mailto:jeanie.mcconnell@edmondswa.gov> 425-771-0220, ext 1338 Web Map: www.maps.edmondwa.gov <http://www.maps.edmondwa.gov> Permit Center Hours: M, T, Th, F – 8:00am – 4:30pm Wednesdays –8:30am – noon 54911C486FDA654FB646088884B7A612@ci.edmonds.wa.us <D0EBD328F8EF2D4CBD9293DE9EFFF7EC50BAE1B2@MBXP01.snopud.com> <8D4707C3EC6DEE448D2BC00DC533676001393511B3@EDMSVR-EXCH02.edmonds.local> <8D4707C3EC6DEE448D2BC00DC533676001393511B3@EDMSVR-EXCH02.edmonds.local> Wayland, Christina Wayland, Christina MRLauer@SNOPUD.com MRLauer@SNOPUD.com en-US EDMSVR-EXCH02.edmonds.local Internal 10 BT=1;II=01D3F145B546D37FE2C7321A450C86A553FA991AD94100234295E0;SBMID=1;S1=<8D4707C3EC6DEE448D2BC00DC533676001393511B3@EDMSVR-EXCH02.edmonds.local>;FIXUP=3.0527;Version=Version 14.3 (Build 399.0), Stage=H1 https://barracuda.edmondswa.gov:443/cgi-mod/mark.cgi 1529426478-0932526d3701150001-gIHSHQ 03B4F6D00107C003B4F81D Christina.Wayland@edmondswa.gov 00000003/o=City of Edmonds/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=Wayland, Christina7f0 McConnell, Jeanie EX /O=CITY OF EDMONDS/OU=EDMONDS/cn=Recipients/cn=MCCONNEL Jeanie.McConnell@edmondswa.gov McConnell, Jeanie Wayland, Christina EX /O=CITY OF EDMONDS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=Wayland, Christina7f0 Christina.Wayland@edmondswa.gov Wayland, Christina Rivera, Chris EX /O=CITY OF EDMONDS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=Rivera, Chris97c Chris.Rivera@edmondswa.gov Rivera, Chris Lambert, Jennifer EX /O=CITY OF EDMONDS/OU=EDMONDS/cn=Recipients/cn=collinsj Jennifer.Lambert@edmondswa.gov Lambert, Jennifer Joint Use SMTP JointUse@SNOPUD.com JointUse@SNOPUD.com Joint Use Comcast 235599 - Sketch - Rev 2 .pdf .pdf Comcas~1.pdf Comcast 235599 - Sketch - Rev 2 .pdf application/pdf E693BFBEF6258147BDACC0FC7A722689@ci.edmonds.wa.us City of Edmonds - Noise Variance Req - Rev 1.pdf City of Edmonds - Work Hour Variance – ROW ENG2018177 – 100029373 – SnoPUD – Revision 1 1. Public convenience – Will the work result in significant delays for transportation, services, or other customer needs if done only during the day and within the hour restrictions set out in other parts of this chapter? There will no significant delays for transportation. The plan is to close one lane of traffic and have flaggers in use on scene. The overhead primary cannot be transferred and the underground primary cannot be replaced during the day due to commercial customer outages listed below. 2. Public Safety – Does working outside of normally allowed hours significantly improve safety conditions for the traveling public and/or construction workers? Working outside of normally allowed hours will not significantly improve safety conditions for the public or construction workers. Similar safety measures are taken during day and night construction. 3. Public exposure – What will be the setting for any proposed work outside of regular hours? Is it located on an arterial street or in a mostly residential area? The work is not on an arterial street. There are mainly business in the area. There are two residential houses southeast of the site. 4. Public cost – Does a limited amount of authorized work outside of regular hours established by this chapter save the public significant cost compared to daytime work? The overhead primary transfer and the underground primary replacement will require power to be out to the following 2 business:  TC Span America 21020 70th Ave W Terrence Conway 425-774-2718  The Whole Pup 21010 70th Ave W Doug Howell 425-218-1500 PUD has agreed to transfer and replace primary conductor after normal business hours between 6pm and 6am on a Friday or Saturday evening to reduce shut down costs to the customers. 2 residential addresses at 21031 and 21103 70th Ave W will be out of power for approximately 1 hour or less while the overhead secondary conductor is transfer to the new pole. All customers will be given 48 hour notice prior to construction. 5. Noise reduction measures -- Have all reasonable steps been taken to reduce the impact of any necessary noise outside the standard hours? Answering this question needs to include evaluation of (1) limiting the night time or early morning work to only that necessary to reasonably mitigate the issues identified above, The setting of the new pole and use of a Vactor Truck can be done during normal business hours. The transfer of 3 phase overhead and underground primary will need to be done at night. (2) use of quiet generators and quiet pumps (as available), No generators will be used. (3) drilling and placing of piles instead of driving them, as well as use of other techniques, design choices, and acoustic control equipment and strategies necessary to minimize the night-time or early morning impacts from construction noise. The pole will be set during normal business hours. .pdf Cityof~1.pdf City of Edmonds - Noise Variance Req - Rev 1.pdf application/pdf FD9782F9B28D9241AA5284E7AA8A81F8@ci.edmonds.wa.usHi Jeanie,   I apologize for any confusing or lack of information that was submitted with the revised application.  I will address your concerns below:   1.       1 pole will be replaced. As stated in the attached Additional Info document, point 5 “The setting of the new pole and use of a Vactor Truck to be done during normal business hours.  The transfer of 3 phase overhead and underground primary will need to be done at night.” To elaborate, PUD crews can dig the new pole hole with the Vactor truck and set the new pole into the ground during normal working hours.  This would most likely be the noisiest part of the entire pole replacement job and will not require a power outage to any of the local businesses.    The work that would need to take place between 6pm and 6am would be the transfer of the overhead and underground primary and overhead secondary to the new pole.  As detailed on page 2 of 2 in the Construction Notes, PUD crew will need to remove the old underground primary in the existing riser and vault because it is not long enough to accommodate the taller pole.  PUD crew will then pull in new primary cable that is 5 feet longer (~78’).  PUD will also install a new street light mast and transfer overhead secondary services at this time. 2.       Please see attached document. 3.       Please see attached sketch.     Thanks,   Michael Lauer Senior Designer T&D Engineering 425-783-5154     _____   Good afternoon Michael,   I have completed review of the noise variance application submitted for work to be performed at 21000 70th Ave W.  Please address the following comments so review of the noise variance can continue.   1)      Update the scope of work to be performed during the 6am-6pm timeframe.  The application states 1 pole will be replaced, however, the additional info provided with the application states the pole will be replaced during daytime hours. 2)      Please elaborate on the criteria items number 1 & 2. 3)      Provide a site plan showing the pole location and surrounding businesses that could be impacted by either the noise and/or the power outage.   The associated right-of-way construction permit (ENG20180177) is being reviewed separately and should be completed in the next couple of days.  Any comments pertaining to that review will follow.   Thank you, Jeanie   Jeanie McConnell HYPERLINK "http://www.bing.com/images/search?q=Pink+Snowflake+Clip+Art&Form=IQFRDR#view=detail&id=137027C70156A13A43FB773BCEA9D72765CD5FEB&selectedIndex=0"- Engineering Program Manager HYPERLINK "mailto:jeanie.mcconnell@edmondswa.gov"jeanie.mcconnell@edmondswa.gov 425-771-0220, ext 1338 Web Map: HYPERLINK "http://www.maps.edmondwa.gov"www.maps.edmondwa.gov   Permit Center Hours: M, T, Th, F – 8:00am – 4:30pm Wednesdays –8:30am – noon