ReMax Office Building Def Subs 8-8-06.doc th August 8, 2006 ReMax, Cyber Properties, LLC Attn: Pat Reagan th 21097 64 Ave W, Suite 200 Mountlake Terrace, WA 98043 th RE: Separate Permits and Deferred Submittal list for ReMax Office Building @ 21920 76 Ave W Dear Mr. Reagan, In order to facilitate the submittal and review of the remaining deferred submittals on your project, below is a list of deferrals called out by your architect that include application time frames and review requirements. The owner of the building, general contractor or sub-contractor may apply and sign the permit application for these submittals. Plumbing 1. , requires two sets of plans for review. A separate plumbing permit is required for all new plumbing work. See attached City handout for minimum submittal requirements. Initial review takes approximately 3 weeks. Mechanical (HVAC) 2. , requires two sets of plans for review. A separate mechanical permit is required for all new mechanical equipment and ductwork. See Attached City handout for minimum submittal requirements. Initial review takes approximately 3 weeks. Fire Connection 3. , requires 3 sets of plans for review. A separate permit is required for the Fire Connection. See attached City handout for minimum submittal requirements. Initial review takes approximately 3 weeks. Fire Sprinkler 4. requires 3 sets of plans for review and requires outside peer review. A separate permit is required for Fire Sprinklers. See attached City handout for minimum submittal requirements. Initial outside peer review takes approximately 6-8 weeks. Fire Alarm 5. , requires three sets of plans for review. A separate permit is required for Fire Alarms. See attached City handout for minimum submittal requirements. Initial review takes approximately 3 weeks. Side Sewer 6. , no plans are required. A separate permit is required for the side sewer, and can be issued over the counter, fees due of $1,015.17. Water Meters (2) 7. , no plans are required, can be purchased over the counter, fees due of $10,094.00 for the 2” water meter and fees due of $1,458.00 for the 3/4” irrigation meter. Deferred structural items 8. noted on sheet S1.1 of the approved plans. Provide 2 copies of each document and/or information submitted. No additional fee is required for review. Initial review takes approximately 2 weeks. Signs 9. , requires three sets of plans for review. A separate permit is required for signage. See attached City handout for minimum submittal requirements. Initial review takes approximately 1 week if Design Review is not required. State electrical permit 10. , issued by State Labor and Industries, post on-site. State Elevator Permit 11. , issued by State Labor and Industries, post on-site. Tenant Improvement 12. permit(s), requires two sets of plans. A separate permit is required for each tenant improvement. See attached City handout for minimum submittal requirements. Initial review takes approximately 1-3 weeks. Maintenance Bond 13. . Amounts to be determined by Planning and Engineering divisions and in place by final inspection. Canopies over exterior doors 14. , requires two sets of plans. A separate permit is required for canopies and awnings. See attached City “Sign” handout for minimum submittal requirements. Initial review takes approximately 2 weeks. This is a general list that does not call out the minimum submittal requirements. Please contact me or have your general contractor or sub-contractor contact me for specific minimum submittal requirements prior to applying for the above permits. If you have any questions please don’t hesitate to contact me at 425-771-0220 x1261. Sincerely; Theresa M. Umbaugh Permit Coordinator cc: Corstone Contractors 1910 Bickford Ave, Suite A Snohomish, WA 98290 Enclosures: City Plumbing, Mechanical, Fire Sprinkler/Fire Alarm/Fire Connection, Sign, and Tenant Improvement hand-outs.